| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.3 LAccepted-Finance PANDIT JE KI CHAKAI MADHUWAN COLONY BUDAUN | BUDAUN | BUDAUN | UTTAR PRADESH | 1 | Accepted-Finance 1 | |
| 2 | 2₹9.2 L+₹88,684 (10.7%)Rejected-Finance | 2 | Rejected-Finance 2 | |
| 3 | 3₹9.7 L+₹1.4 L (17.3%)Rejected-Finance | 3 | Rejected-Finance 3 | |
| 4 | 4₹10.0 L+₹1.7 L (20.9%)Rejected-Finance 14 15 VINAY NAGAR VIJITEM PUBLIC SCHOOL QUARSI RAMGHAT ROAD ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | 4 | Rejected-Finance 4 | |
| 5 | 5₹10.9 L+₹2.6 L (31.5%)Rejected-Finance ANWALKHEDA MR | CHHINDWARA | MADHYA PRADESH | 460663 | 5 | Rejected-Finance 5 |
Tender Value
₹12.5 L
EMD Value
₹25,000
Closing Date
22 Aug 2025, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
U.M.B.C.D.G.C. Khurja
Construction of V.R.B.
2025_UPIDC_1065054_1
08/E.E./2025-26
Open Tender
Civil Works
Item Rate
90 days
U.M.B.C.D.G.C. Khurja
Please refer Tender documents.
3 documents required · 3 mandatory
₹891
₹25,000
10 Nov 2025
13 Aug 2025
22 Aug 2025
13 Aug 2025
22 Aug 2025
13 Aug 2025
Amount
Dismentling R.C.C including Stacking of Dismentaled Material with in 60 M Distance including all Cost of Material, Labour & T&P etc complete all as specified and as directed by Engineer-in-charge.
Dismentling R.B.Work including stacking of material within 60 Metre including all Cost of Material, Labour & T&P etc complete all as specified and as directed by Engineer-in-charge.
Earthwork in excavation in foundation in ordinary soil including all lead and lift with all Cost of Material, Labour and T&P etc complete all as specified and as directed by Engineer-in-charge.
Providing and laying C.C 1:3:6 with coarse sand aggregate in foundation with all Cost of Material, Labour and T&P etc complete all as specified and as directed by Engineer-in-charge.
Brick (M-100) Work in 1:4 cement, coarse sand mortar i/c cost of all Material Labour and T&P etc complete all as specified and as directed by Engineer-in-charge.
Centering and shuttering for C.C. work including all Cost of Material, Labour and T&P etc complete all as specified and as directed by Engineer-in-charge.
Centering and shuttering for R.C.C work including all Cost of Material, Labour and T&P etc complete all as specified and as directed by Engineer-in-charge.
12.5 mm Cement Plaster on brick masonry in 1:4 C.M. including all Cost of Material, Labour & T&P etc complete all as specified and as directed by Engineer-in-charge.
Providing and laying R.C.C 1:1:2 with coarse sand & aggregate including mechanical mixing and all Cost of Material, Labour and T&P But excluding cost of steel reinforcement complete all as specified and as directed by Engineer-in-charge.
Providing and laying C.C 1:2:4 with coarse sand & aggregate including mechanical mixing and all Cost of Material, Labour and T&P But excluding cost of steel reinforcement complete all as specified and as directed by Engineer-in-charge.
Steel Reinforcement with Bending, Binding, Cutting and Placing of Reinforcement including cost of Binding Wire with all Cost of Material, Labour and T&P etc complete all as specified and as directed by Engineer-in-charge.
S/F 75 mm dia P V C Pipe for weep holes.
Earth Work in Filling for Strengthning of Bank, Ramp & approaches i/c Llift upto 1.50m & Lead upto 200 M with all Cost of Material, Labour and T&P etc complete all specified and as directed by Engineer-in-charge.
Earthwork in Making & Removal Bundh and disposal including all Cost of Material, Labour and T&P etc complete all specified and as directed by Engineer-in-charge.
Finishing of walls with water proofing cement paint of approved make supreme quality of required shade on uncoated wall surface over one coat white cement primer to give even shades after thoroughly brushing the sarface to remove all dirt and remains of loose powdered materials including Curing & Cost of all material etc complete all as specified and as directed by Engineer-in-charge.
providing & fixing Sign board at VRB. i/c earth work, excavation, carriage, painting, letter writting and errect with c.c. i/c all Cost of Material, Labour and T&P etc complete all as specified and as directed by Engineer-in-charge.
MITTAL BROTHERS (BID ID -5465713)
M/S PRABHAT CONTRACTOR AND ENGINEERS (BID ID -5466338)
GOMATINETRA CONSTRUCTIONS (BID ID -5472088)
M/S SHIVAM SINGH CONTRACTOR (BID ID -5468783)
M/S DEEN DAYAL CONTRACTOR (BID ID -5470138)
M/S NARENDRA KUMAR SHARMA CONTRACTOR (BID ID -5472418)
M/S VASUDEV CONSTRUCTION (BID ID -5472224)
stage.html
html • 0.06 MB
technical_1941482.pdf
techsummary_1941482.pdf
finance_1941482.pdf
BOQ Comparative Chart
xlsx
finsummary_1941482.pdf
cancelled_1.pdf
pdf • 1.05 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.66 MB
Tendernotice_2.pdf
PDF • 0.37 MB
Tendernotice_3.pdf
PDF • 0.28 MB
Tendernotice_4.pdf
PDF • 0.19 MB
Tendernotice_5.pdf
PDF • 0.02 MB
Tendernotice_6.pdf
PDF • 3.93 MB
BOQ_1941482.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .