Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹83,148Accepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹1.1 L+₹26,022 (31.3%)Rejected-AOC 253 NEAR SAI MARKET MODEL TOWN SONIPAT 131001 | SONIPAT | SONIPAT | HARYANA | 131001 | L2 | Rejected-AOC Rejected |
Tender Value
Refer Docs
EMD Value
₹1,660
Closing Date
19 Nov 2024, 5:00 pmClosed
Pawan Kumar
DIV RGEC Sonepat
Annual maintenance of Water Supply Scheme in RGEC UE Sonipat. Rewinding of 20 HP submersible motor and pump and repair of panel complete in all respect and all other works contingent thereto. At Tubewell No. 1 RGEC Sonipat
2024_HBC_411034_1
2024646E754E 8351 4A7C 9ACF F09856CE8B2B242HSV
Open Tender
Civil Works
Works
60 days
Executive Engineer, HSVP RGEC Division Sonipat
2 documents required · 2 mandatory
₹250
₹1,660
Yes
17 Dec 2024
14 Nov 2024
20 Nov 2024
14 Nov 2024
19 Nov 2024
14 Nov 2024
Amount
Rewinding of 20 HP submersible motor including the labour and cartage etc. complete in all respect
Providing and fixing of gun metal bush including the cost of material, labour and cartage etc. complete in all respect
Roter brezing of 20 HP submersible motor for repairing complete in all respect
Providing and fixing of roter sleave including the cost of materail, labour and cartage etc. complete in all respect
Providing and fixing of new thrist plate including the ocst of material, labour and cartage etc, ocmplete in all respect
Providing and fixing sen guard including the cost of material, labour and cartage complete in all respect
Providing and fixing of bole including the cost of lablur complete in all respect
Providing and fixing of V7/8 Impeller including the labour and cartage etc. complete in all respect
Providing of fixing of S. Sleave including the ocst of material labour and cartage etc. complete in all respect
Providing and fixing of rubber bush including the cost of material labour and cartage etc. ocmplete in all respect
Providing and fixing of nackering including the oct of material, labour and cartage etc. complete in all respect
Lowering of submersible pump including the cost of materialm labour and cartage etc. complete in all resepct
Providing and fixing of kachhi pakki tape including the cost of material labour and cartage etc. complete in all respect
Providinf and fixing of over load relay including the cost of material, labour and cartage etc. complete in all respect
Providing and fixing of Single phase preventor and star delta timer including the cost of material, labour and cartage etc. complete in all respect\
Providing and fixing of 40 AMP contactor 3 pole including the cost of material, labour and carteg etc. complete in all respect
The Ashirwad Co-Operative Labour and Construction Society Limited Sonepat (BID ID -1170187)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .