| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹98.3 LAdmitted-Fee/PreQual/Technical/Finance 15 NEW SHANTI NIKETAN CHS PANCHAVATI NASHIK 422003 | NASHIK | MAHARASHTRA | 422003 | -21.22% | ₹98.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹98.6 L+₹26,207.54 (0.27%)Admitted-Fee/PreQual/Technical/Finance | -21.01% | ₹98.6 L+₹26,207.54 (0.27%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.0 Cr+₹2.1 L (2.18%)Admitted-Fee/PreQual/Technical/Finance | -19.50% | ₹1.0 Cr+₹2.1 L (2.18%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹1.0 Cr+₹2.4 L (2.48%)Admitted-Fee/PreQual/Technical/Finance | -19.27% | ₹1.0 Cr+₹2.4 L (2.48%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹1.0 Cr+₹2.5 L (2.58%)Admitted-Fee/PreQual/Technical/Finance | -19.19% | ₹1.0 Cr+₹2.5 L (2.58%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.2 Cr
EMD Value
₹2.5 L
Closing Date
10 Aug 2026, 2:00 pmClosed
COMMISSIONER NAGAR NIGAM JODHPUR
NAGAR NIGAM JODHPUR
Construction of CC Road with Plantation on Road side at Chaman Gali Ram Nagar in Zone 2 (Under NCAP)
2026_DLB_581973_3
NIT 2136 DATE 31.07.2026
Open Tender
Civil Works
Percentage
180 days
NAGAR NIGAM JODHPUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,000
COMMISSIONER NAGAR NIGAM JODHPUR AND MDRISL
₹2.5 L
Yes
14 Aug 2026
4 Aug 2026
10 Aug 2026
4 Aug 2026
10 Aug 2026
4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 50 metres as directed by Engineer.
Bituminous courses | 147 | cum | 445 | ₹65,415 |
| 2 | Granular courses | 220.5 | cum | 310 | ₹68,355 |
| 3 | Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per MoRT&H specification clause 301. I In all type of soil | 1,400 | cum | 235.5 | ₹3,29,700 |
| 4 | Carriage of Materials by mechanical transport including loading, unloading and stacking :: Earth earth upto 5 km | 1,767.5 | cum | 254.76 | ₹4,50,288.3 |
| 5 | Providing and laying lean cement concrete 1:4:8 in Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in concrete mixer, laid manually, compacted with surface vibrator, finishing and curing complete as per clause 601, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. For footpath | 1,050 | cum | 2,955 | ₹31,02,750 |
| 6 | Random rubble masonry with hard stone in foundation and plinth : Cement mortar 1:4 (1 cement : 4 coarse sand) | 47.88 | cum | 5,130 | ₹2,45,624.4 |
| 7 | Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 20 mm cement plaster of mix : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar 1:4 (1 cement : 4 fine/ coarse sand) | 126 | sqm | 315.5 | ₹39,753 |
| 8 | Providing and laying un-reinforced, dowel jointed, plain cement concrete mix With Concrete Mixer & vibrator pavement over a prepared sub base with 43 grade cement , coarse and fine aggregate conforming to IS: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed as per approved mix design, laid, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, admixtures (if required) as approved, curing compound, finishing to lines and grades complete as per drawing and as per clause 602, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion.
PCC M-30 | 1,050 | cum | 6,190 | ₹64,99,500 |
| 9 | Providing, lowering, laying in trenches, aligning, fixing in position and jointing socketed rubber gasket type ISI marked uPVC pipes of Class III (6 Kg/sqcm) suitable for potable water with rubber ring joints (as per IS 4985-2000) of following outer dia with all accessories (excluding specials) complete including all material, labour, hydraulic testing and commissioning as per Technical Specifications and as per direction of Engineer. Note : E/w to be measured and paid separately.
160 mm dia | 300 | Mtr | 605 | ₹1,81,500 |
| 10 | Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge manure, planting the saplings, backfilling the trench, watering, fixing the tree guard and maintaining the plants for one year. | 200 | each | 1,682 | ₹3,36,400 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.00 MB
BOQ_1034047.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .