Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹7.5 L
EMD Value
₹14,900
Closing Date
22 Oct 2026, 12:00 pm4d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer
MDGC Muzaffarnagar
Alpika Sakhan ke km 6.280 to km 6.436 ke madhya antrik anubhag me CC Lining ka Karya
2026_UPIDC_1198095_1
TN-08/EE/2026-27
Open Tender
Civil Works
Item Wise
45 days
as per tender notice
as per tender notice
2 documents required · 2 mandatory
₹854
₹14,900
17 Oct 2026
17 Oct 2026
22 Oct 2026
17 Oct 2026
22 Oct 2026
17 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in Excavation in foundation in all types of soil including lift upto 1.5m and lead upto 30m and including back filling watering and ramming of excavated earth into the trenches or into the space between or into the plinth with removal and disposal of surplus earth as directed by the Engineer in charge upto a distance of 30m from the foundation tranches. | 295.58 | Cum | - | - |
| 2 | Centering and shuttering for CC work in base and toe wall etc i.c cost of all material T&P etc complete. | 60.96 | Sqm | - | - |
| 3 | CC M-10(1:3:6) with cement & stone grit 4 mm to 20 mm size for below bed lining etc including cost of all material labour T&P etc complete. | 16.76 | Cum | - | - |
| 4 | Providing 230 mm thick brick work with M-150 bricks in 1:4 CM with cement coarse sand including cost of all material labour T&P etc required for proper completion of work. | 21.49 | Cum | - | - |
| 5 | Supplying Filling & Laying Local Sand including cost of all material labour T&P etc required for proper completion of work. | 26.84 | Cum | - | - |
| 6 | Supply & Laying 200 Micron LDPE Film Below CC 1:2:4 | 764.4 | Sqm | - | - |
| 7 | Providing & Laying 75mm thick CC linning in M-15(1:2:4) including cost of all material labour T&P etc required for proper completion of work | 608.4 | Sqm | - | - |
| 8 | Supplying and Fixing 10mm thick thermocol sheet in expansion joints i/c cost of all labour material T&P etc required for proper completion of work. | 18.66 | Sqm | - | - |
| 9 | Supplying & Filling 10mm wide expansion joints with bituminous fillar after removal of thermocol sheet at site i/c cost of all labour material T&P etc required for proper completion of work. | 156.8 | RM | - | - |
| 10 | E/W in embankment back filling in ordinary soil excavation to be in the form of irregular pits and earth work in embankments to be in 20 cm Layers, including ramming and dressing the surface to the required levels slope and also including 1.50 meter and lead upto 1.0 km labour T&P etc complete. | 312 | Cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.30 MB
Tendernotice_2.pdf
PDF • 2.17 MB
BOQ_2263799.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .