Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹11.8 L C/o toe wall & earth filling back side of boys hostel, C/o 100 mtr. RCC drain and C/o foundation for electric distribution board at JNV, Pilibhit (UP). | C/o toe wall & earth filling back side of boys hostel, C/o 100 mtr. RCC drain and C/o foundation for electric distribution board at JNV, Pilibhit (UP). | L1 | - | |
| 2 | L2₹12.7 L+₹88,100.07 (7.47%) C/o toe wall & earth filling back side of boys hostel, C/o 100 mtr. RCC drain and C/o foundation for electric distribution board at JNV, Pilibhit (UP). | C/o toe wall & earth filling back side of boys hostel, C/o 100 mtr. RCC drain and C/o foundation for electric distribution board at JNV, Pilibhit (UP). | L2 | - | |
| 3 | L3₹13.1 L+₹1.3 L (11.2%) C/o toe wall & earth filling back side of boys hostel, C/o 100 mtr. RCC drain and C/o foundation for electric distribution board at JNV, Pilibhit (UP). | C/o toe wall & earth filling back side of boys hostel, C/o 100 mtr. RCC drain and C/o foundation for electric distribution board at JNV, Pilibhit (UP). | L3 | - | |
| 4 | L4₹14.1 L+₹2.3 L (19.5%)Financial bid opened C/o toe wall & earth filling back side of boys hostel, C/o 100 mtr. RCC drain and C/o foundation for electric distribution board at JNV, Pilibhit (UP). | C/o toe wall & earth filling back side of boys hostel, C/o 100 mtr. RCC drain and C/o foundation for electric distribution board at JNV, Pilibhit (UP). | L4 | Financial bid opened | |
| 5 | L5₹14.6 L+₹2.8 L (23.4%) C/o toe wall & earth filling back side of boys hostel, C/o 100 mtr. RCC drain and C/o foundation for electric distribution board at JNV, Pilibhit (UP). | C/o toe wall & earth filling back side of boys hostel, C/o 100 mtr. RCC drain and C/o foundation for electric distribution board at JNV, Pilibhit (UP). | L5 | - |
| Sl No | Description | Qty | Unit | M/S GAUTAM CONSTRUCTION L4 | SHAILENDRA KUMAR SHARMA L2 | DEEPAK KUMAR TIWARI L1 | ANJU SHAH L3 | Mohammad Shahnawaz L5 |
|---|---|---|---|---|---|---|---|---|
| 1 | CIVIL WORKS | - | - | -22.76 ₹14,08,871.5 | -30.51 ₹12,67,510.11 | -35.34 ₹11,79,410.04 Lowest | -28.11 ₹13,11,286.54 | -20.22 ₹14,55,201.56 |
Tender Value
₹18.2 L
EMD Value
₹36,480
Closing Date
27 Sept 2022, 10:30 amClosed
EE-Bareilly
Raman kunwar
C-18 NIRMAN JYOTI BAREILLY
C/o toe wall & earth filling back side of boys hostel, C/o 100 mtr. RCC drain and C/o foundation for electric distribution board at JNV, Pilibhit (UP).
19760
13/EE/BLY/2022-23
OPEN
Civil Works - Others
NCB
3 months
Pilibhit, Uttar Pradesh
6 documents required · 6 mandatory
₹36,480
Not Applicable
27 Sept 2022
19 Sept 2022
27 Sept 2022
27 Sept 2022
26 Sept 2022
stage.html
html • 0.07 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NIT13EEBLY202223.pdf
document • 1.60 MB
SCH13EEBLY202223.pdf
document • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .