Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAccepted-AOC N A | ₹3.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.9 L+₹27,543.27 (7.66%)Rejected-Finance | ₹3.9 L+₹27,543.27 (7.66%) | L2 | Rejected-Finance L2 |
| 3 | L3₹4.2 L+₹60,221.73 (16.8%)Rejected-Finance V P O GANVI TEH RAMPUR DISTT SHIMLA | GANVI | SHIMLA | HIMACHAL PRADESH | ₹4.2 L+₹60,221.73 (16.8%) | L3 | Rejected-Finance L3 |
| 4 | L4₹4.5 L+₹89,632.34 (24.9%)Rejected-Finance VILL KIYAR PO JEORI TEHSIL RAMPUR DISTT SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | ₹4.5 L+₹89,632.34 (24.9%) | L4 | Rejected-Finance L4 |
Tender Value
₹4.7 L
EMD Value
₹4,668
Closing Date
3 Apr 2026, 9:00 amClosed
Resident Engineer
Resident Engineer, GPHD, Jeori
Maintaining/Observation of water level at forebay, cleaning of trash rack and forebay and at village - Khakrola w.e.f.10.04.2026 to 15.09.2026 (158 days).
2026_HPSEB_132409_2
HPSEBL/GPHD/DB-9/2026-27-018
Open Tender
Manpower Supply
Percentage
158 days
Nogli
Please refer Tender documents.
5 documents required · 5 mandatory
₹590
₹4,668
8 Sept 2026
28 Mar 2026
4 Apr 2026
28 Mar 2026
3 Apr 2026
28 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Maintaining/Observation of water level operating gates in emergency and cleaning the trash rack at forebay at Vill-Khakrola round the clock, the person deployed for the job should be well equipped with mobile phone/torch/umbrellas etc. complete in all respects. Round the c10.04.2026 to 15.09.2026 (158 days)01.04.2026 to 31.07.2026 (121 days).
Note :-1) The work will be suspended immediately if the services are not found satisfactory or HPSEB Ltd., provides its own man power for the purpose.
2.Torch cells/greasee etc.will be provided by the contractor at free of cost to the contractor.
3. The contractor will be responsible for ant fatal/ non fatel accident during the working hours.
4. The G.S.T @ 18% will be paid/born by HPSEBL extra. The same shall be deposited by the contractor himself. | - | Job | 3,95,623 | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
BOQ_196298.xls
BOQ • 0.29 MB
forebaynogli.pdf
Tender Documents • 0.94 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .