Tender Value
₹28.0 L
EMD Value
₹27,970
Closing Date
3 Jul 2026, 5:00 pm
Similar tender results from the same govt authority in the past 3 years.
Divisional Officer
RURAL WORKS DIVISION NO.II, SUNDARGARH
Gailo to Lamjira_Road_Pothole repair and renewal coat such as a layer of SDBC with BM in stretches0.000 to 1.940
2026_CERWI_132733_1
OnlineEERKL 10/2026-27
Open Tender
Civil Works - Roads
120 days
ROURKELA
2 documents required · 2 mandatory
₹6,000
₹27,970
Yes
23 Jun 2026
23 Jun 2026
6 Jul 2026
23 Jun 2026
3 Jul 2026
23 Jun 2026
23 Jun 2026 - 2 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grass and removal of rubbish upto a distance of 50m outside the peiphery of the area as per direction of the Engineer in charge | 4,920 | Sqm | 2.86 | ₹14,071.2 |
| 2 | Providing, laying, spreading and compacting graded stone aggregates to wet mixed macadam specification including Premixing the materials with water at OMC in mechanical mix plant,carriage of mixed materials by tripper to site ,laying in uniform layer with paver in sub-base/base course on well prepared surface and conpacting with vibratory roller to achieve the desire dencity as per clause of MoSRT&H Specification for road and bridge works and direction of Engineer -in- Charge. | 14.76 | Cum | 2,702.24 | ₹39,885.06 |
| 3 | Providing and applying Primer Coat with bitumen emulsion SS-1 at the rate of 0.60kg/sqm on the prepared treated with primer and cleaned as per technical specification for Road and Bridge works and direction of Engineer -in- Charge.. | 147.6 | Sqm | 55.27 | ₹8,157.85 |
| 4 | Providing & applying Tack Coat with bitumen emulsion using emulsion pressure distributor @ 0.20Kg/ Sqm on prepared bituminous surface using mechanical means as per Clause- 503 of MoSRT&H Specification for Road & Bridge works(4th Revision).and direction of Engineer -in- Charge. | 4,920 | Sqm | 19.26 | ₹94,759.2 |
| 5 | Providing and laying bituminous macadam with hot mix plant using crushed aggregates of specified grading premixed with bituminous binder of 60/70 penetration grade of bitumen, transported to site, laid over a previousely prepared surface with a hydrostatic paver finisher with sensor control to the required grade, level and alignment and rolling with smooth wheeled,vibratory roller and tandem rollers to achieve the desired compaction as per Clause-504 of MoSRT&H Specification for Road & Bridge works(4th Revision) and direction of Engineer -in- Charge. | 13.35 | Cum | 10,395.39 | ₹1,38,778.46 |
| 6 | Providing and laying Semi dense bituminous concrete with batch type hot mix plant using crushed aggregates of specified grading premixed with bituminous binder of 60/70 penetration grade of bitumen, transported to site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment and rolling with smooth wheeled,vibratory roller and tandem rollers to achieve the desired compaction as per Clause-508 of MoSRT&H Specification for Road & Bridge works(4th Revision)and direction of Engineer -in- Charge. | 123 | Cum | 13,976.45 | ₹17,19,103.35 |
| 7 | Earth work in hard soil or gravelly soil in embankment, roads etc. within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per specification approved by the Department alongwith proper compaction with P.R.R. including hire and running charges of P.R.R. etc complete as per specification and direction of Engineer -in- charge. | 83.12 | Cum | 277.97 | ₹23,104.87 |
| 8 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes etc complete as per specification and direction of Engineer -in- charge. | 328 | Sqm | 278.66 | ₹91,400.48 |
| 9 | Providing & applying 2 coats of weather coat paint to unplastered surface after cleaning the surface of dirt, dust, oil, greases, efflorescens & applying paint @ 1litre per 2 sqm | 54 | Sqm | 120.75 | ₹6,520.5 |
| 10 | Construction of un-reinforced, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing and as per Clause 602 of MoSRT&H Specifications for Road & Bridge works (4th Revision) as per drawing and Technical Specification as per direction of the Engineer-in-Charge. | 29.75 | Cum | 6,406.77 | ₹1,90,569.29 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 0.37 MB
Tendernotice_1.pdf
PDF • 0.36 MB
BOQ_597576.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid