Executive Engineer Ed Kargil
Baroo Kargil
repair re building of partially fully damaged distribution transformers on contract basis for the Year 2020-21
2020_PDNRE_39_1
E- NIT NO 13 OF 2020-21
Open Tender
Electrical Works
Item Wise
30 days
KARGIL
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
To be Credited in M.H 801 Power
₹50,000
8 Jul 2020
13 Jun 2020
1 Jul 2020
18 Jun 2020
30 Jun 2020
24 Jun 2020
Repair/Re-building of Partially/fully damaged Distribution transformers for the Year 2020-21
Replacement of HT Coils made out of super enamelled Aluminium winding wires of same guage and same no of turns as requuired as per transformer of any capacity including replacement of paper insulation ,insulating meterial and proper end connection .The rewinding coil shall be heat treated in an electric oven completely . Aluminium/Copper wire shall be as per ISI Standrad
Replacement of LT Coils made out of super enamelled Aluminium winding wires of same guage and same no of turns as required as per transformer of any capacity including replacement of paper insulation ,insulating meterial and proper end connection .The rewinding coil shall be heat treated in an electric oven completely . Aluminium/Copper wire shall be as per ISI Standrad.
Painting of Transformer of any capacity indoor/outdor type after cleaning the outer surface of the transformer by rubbing with emery paper ,remove oil particles, dust etc and applying one coat of synthetic enamel paint of smoke gray colour as directed.
Replacement of HT Bushing complete with brass spindle with nut bolt,washer ,ceramic bushing and rubber washer for Transformer capacity of 25 to 100 KVA.
Replacement of HT Bushing complete with brass spindle with nut bolt,washer ,ceramic bushing and rubber washer for Transformer capacity above 100 KVA. To 250 KVA
Replacement of HT Bushing complete with brass spindle with nut bolt,washer ,ceramic bushing and rubber washer for Transformer capacity above 250 KVA. To 400 KVA
Replacement of HT Bushing complete with brass spindle with nut bolt,washer ,ceramic bushing and rubber washer for Transformer capacity above 400 KVA. To 630 KVA
Replacement of LT Bushing complete with brass spindle with nut bolt,washer ,ceramic bushing and rubber washer for Transformer capacity of 25 to 100 KVA.
Replacement of LT Bushing complete with brass spindle with nut bolt,washer ,ceramic bushing and rubber washer for Transformer capacity of above 100 KVA. To 250 KVA
Replacement of LT Bushing complete with brass spindle with nut bolt,washer ,ceramic bushing and rubber washer for Transformer capacity of above 250 KVA. To 400 KVA
Replacement of LT Bushing complete with brass spindle with nut bolt,washer ,ceramic bushing and rubber washer for Transformer capacity of above 400 KVA. To 630 KVA
Replacement of Breather assembly of approved make filled with silica gel suitable for Transformer of capacity 25 to 100 KVA.
Replacement of Breather assembly of approved make filled with silica gel suitable for transformer of capacity 250 to 400 KVA.
Replacement of Breather assembly of approved make filled with silica gel suitable for transformer of capacity 630 KVA
Replacement of High quality core gasket for transformer top lid cover for Transformer capacity of 25 to 100 KVA.
Replacement of High quality core gasket for transformer top lid cover for Transformer capacity of 250 to 400 KVA.
Replacement of High quality core gasket for transformer top lid cover for Transformer capacity of above 400 KVA to 630 KVA.
Repairing of Tap Changers of Distribution Transformer.
Providing and filling of fresh Transformer oil
Loading of Transformer at Divisional store Workshop 25 KVA to 100 KVA
Loading of Transformer at Divisional store Workshop 200 KVA to 630 KVA
Un-Loading of Transformer at Divisional store Workshop 25 KVA to 100 KVA
Un- Loading of Transformer at Divisional store Workshop 200 KVA to 630 KVA
Transportation of Transformer from Divisional Workshop to outside repairing agency (one Truck Load) and back to workshop
Filteration and Dehydration of transformer oil to improve dielectric strength shall not be less than 50 KV (at 2.5 mm gap of dielectric strength test machine) and refilling oil in transformer as required complete all as specified. Note : Filteration of oil shall be carried out with centrifugal machine)
M/S SAKINA TRADERS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .