Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAdmitted-Fee/PreQual/Technical/Finance KUNZER KUNZER TANGMARG BARAMULLA JAMMU KASHMIR 193401 | BUDGAM | JAMMU AND KASHMIR | 193401 | ₹1.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.6 L+₹5,770 (3.73%)Admitted-Fee/PreQual/Technical/Finance 12 BUMHAMA KUPWARA KUPWARA BUMHAMA KUPWARA KUPWARA JAMMU KASHMIR 193222 | KUPWARA | JAMMU AND KASHMIR | 193222 | ₹1.6 L+₹5,770 (3.73%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.7 L+₹11,640 (7.52%)Admitted-Fee/PreQual/Technical/Finance | ₹1.7 L+₹11,640 (7.52%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹1.7 L+₹18,740 (12.1%)Admitted-Fee/PreQual/Technical/Finance | ₹1.7 L+₹18,740 (12.1%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹1.8 L+₹29,770 (19.2%)Admitted-Fee/PreQual/Technical/Finance | ₹1.8 L+₹29,770 (19.2%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | NARWARI ELECTRICALS L10 | IMPLA GENERAL SUPPLIERS L8 | GULMARG ELECTRICALS AND SUPPLIERS L7 | M/S BHAT ELECTRICAL & ELECTRONICS L1 | AFTAB ELECTRONICS L4 | Naik Enterprises L9 | KHAN AND SONS L2 | DAR ELECTRICALS L3 | WAZA ELECTRICALS L5 | m/s rahmiya electricals L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Supply , Transportation and errection of 8MTR long ST Poles (410 SP-15) completely errected in the pit of 1/5th of the pole length including excavation and back filling of the pole pit. (as per REC Standard) | 10 | No. | 15,000 ₹1,50,000 | 12,500 ₹1,25,000 | 14,000 ₹1,40,000 | 11,900 ₹1,19,000 | 12,000 ₹1,20,000 | 13,500 ₹1,35,000 | 10,880 ₹1,08,800 Lowest | 12,000 ₹1,20,000 | 13,500 ₹1,35,000 | 13,000 ₹1,30,000 |
| 2.00 | Earthing of Poles Complete by Spike earthing Rod 20mm 2.5mtr long with GI strip 25x3mm (as per REC Standards) | 10 | No. | 899 ₹8,990 | 500 ₹5,000 | 800 ₹8,000 | 150 ₹1,500 Lowest | 1,000 ₹10,000 | 350 ₹3,500 | 500 ₹5,000 | 500 ₹5,000 | 400 ₹4,000 | 900 ₹9,000 |
| 3.00 | Supply,Carraige upto site,, laying ,stringing, tensioning , binding of ACSR weasel Conductor, (30mm2 ACSR Conductor) as per REC standard. | 0.8 | Kms | 43,599 ₹34,879.2 | 35,000 ₹28,000 | 25,000 ₹20,000 | 20,000 ₹16,000 Lowest | 30,000 ₹24,000 | 46,000 ₹36,800 | 35,000 ₹28,000 | 35,000 ₹28,000 | 35,000 ₹28,000 | 35,000 ₹28,000 |
| 4.00 | Poviding and Painting of ST Poles with one coat of red oxide to give an even shade using anti corrosive paint of standard brand (Nerolac/ Asian) paints) including cost of paint along with stamping on poles showing therein name of the firm date, year of instllaiton and the debitable head etc. | 10 | No. | 399 ₹3,990 | 200 ₹2,000 | 100 ₹1,000 | 90 ₹900 | 200 ₹2,000 | 125 ₹1,250 | 100 ₹1,000 | 80 ₹800 | 40 ₹400 Lowest | 100 ₹1,000 |
| 5.00 | Poviding and Painting of ST Poles two coats of aluminum paint to give an even shade using anti corrosive paint of standard brand (Nerolac/ Asian) paints) including cost of paint along with stamping on poles showing therein name of the firm date, year of instllaiton and the debitable head etc. | 10 | No. | 399 ₹3,990 | 300 ₹3,000 | 100 ₹1,000 | 90 ₹900 | 200 ₹2,000 | 125 ₹1,250 | 100 ₹1,000 | 80 ₹800 | 5 ₹50 Lowest | 100 ₹1,000 |
| 6.00 | Cement bottoming of S.T poles in 1:2:4 mix 1/6th of the height of pole below the ground and 1ft above the ground cylnerical shape with circular radius 9” from the pole centre) using 40mm crushed stone aggregate mix. As per Drawing 0.40 cum/polePit =( 600x600x1600)& Tappered at the Top. (as per REC standard) for 8 MTR ST Pole | 10 | No. | 2,599 ₹25,990 | 2,000 ₹20,000 | 1,000 ₹10,000 | 900 ₹9,000 | 1,000 ₹10,000 | 950 ₹9,500 | 1,000 ₹10,000 | 300 ₹3,000 Lowest | 1,000 ₹10,000 | 900 ₹9,000 |
| 7.00 | Supply and fixing Galvanized Nuts & bolts of sizes | 12 | Kgs | 110 ₹1,320 | 130 ₹1,560 | 120 ₹1,440 | 99 ₹1,188 Lowest | 100 ₹1,200 | 130 ₹1,560 | 120 ₹1,440 | 100 ₹1,200 | 110 ₹1,320 | 120 ₹1,440 |
| 8.00 | Supply and fixing of LT Shackle Insulators with G.I Mukhi Clamps (Scaffolding G.I LT Clamps) including nuts and bolts as per REC standard | 33 | No. | 265 ₹8,745 | 300 ₹9,900 | 200 ₹6,600 | 190 ₹6,270 | 100 ₹3,300 Lowest | 250 ₹8,250 | 130 ₹4,290 | 200 ₹6,600 | 170 ₹5,610 | 200 ₹6,600 |
| 9.00 | Supply, Carriage up to site, Installation, testing and Commissioning of Sundry items like Aluminium lugs, Jumpers, Binding tapes etc. | 1 | LS | 350 ₹350 | 500 ₹500 | 500 ₹500 | 1 ₹1 Lowest | 500 ₹500 | 100 ₹100 | 500 ₹500 | 500 ₹500 | 100 ₹100 | 500 ₹500 |
| 10.00 | Pre, during and post execution geo tagged photographic evidence consisting of 5x7 inch photographs in coffee table book (covering each pole/Sub Station) | 1 | Booklet | 500 ₹500 | 40 ₹40 | 100 ₹100 | 1 ₹1 Lowest | 500 ₹500 | 100 ₹100 | 500 ₹500 | 500 ₹500 | 50 ₹50 | 500 ₹500 |
Tender Value
₹2 L
EMD Value
₹4,000
Closing Date
11 Aug 2026, 2:00 pmClosed
Assistant executive Engineer KPDCL Tangmarg
KPDCL Tangmarg
Installation of poles/wire at Turk batpora under PRI Grants for the year 2026-27
2026_PDD_317238_1
E-NIT No.SSDT/10 of 2026-27 dated 21.07.2026
Open Tender
Electrical Works
Turn-key
30 days
Turk Batpora
Please refer Tender documents.
4 documents required · 4 mandatory
₹185
Treasury Officer
₹4,000
20 Aug 2026
22 Jul 2026
12 Aug 2026
22 Jul 2026
11 Aug 2026
23 Jul 2026
22 Jul 2026 - 23 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply , Transportation and errection of 8MTR long ST Poles (410 SP-15) completely errected in the pit of 1/5th of the pole length including excavation and back filling of the pole pit. (as per REC Standard) | 10 | No. | - | - |
| 2 | Earthing of Poles Complete by Spike earthing Rod 20mm 2.5mtr long with GI strip 25x3mm (as per REC Standards) | 10 | No. | - | - |
| 3 | Supply,Carraige upto site,, laying ,stringing, tensioning , binding of ACSR weasel Conductor, (30mm2 ACSR Conductor) as per REC standard. | 0.8 | Kms | - | - |
| 4 | Poviding and Painting of ST Poles with one coat of red oxide to give an even shade using anti corrosive paint of standard brand (Nerolac/ Asian) paints) including cost of paint along with stamping on poles showing therein name of the firm date, year of instllaiton and the debitable head etc. | 10 | No. | - | - |
| 5 | Poviding and Painting of ST Poles two coats of aluminum paint to give an even shade using anti corrosive paint of standard brand (Nerolac/ Asian) paints) including cost of paint along with stamping on poles showing therein name of the firm date, year of instllaiton and the debitable head etc. | 10 | No. | - | - |
| 6 | Cement bottoming of S.T poles in 1:2:4 mix 1/6th of the height of pole below the ground and 1ft above the ground cylnerical shape with circular radius 9” from the pole centre) using 40mm crushed stone aggregate mix. As per Drawing 0.40 cum/polePit =( 600x600x1600)& Tappered at the Top. (as per REC standard) for 8 MTR ST Pole | 10 | No. | - | - |
| 7 | Supply and fixing Galvanized Nuts & bolts of sizes | 12 | Kgs | - | - |
| 8 | Supply and fixing of LT Shackle Insulators with G.I Mukhi Clamps (Scaffolding G.I LT Clamps) including nuts and bolts as per REC standard | 33 | No. | - | - |
| 9 | Supply, Carriage up to site, Installation, testing and Commissioning of Sundry items like Aluminium lugs, Jumpers, Binding tapes etc. | 1 | LS | - | - |
| 10 | Pre, during and post execution geo tagged photographic evidence consisting of 5x7 inch photographs in coffee table book (covering each pole/Sub Station) | 1 | Booklet | - | - |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.81 MB
Tendernotice_2.pdf
PDF • 18.30 MB
BOQ_1038714.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .