Loading…
Loading…
Tender Value
₹43.7 L
EMD Value
₹87,480
Closing Date
15 Oct 2026, 4:00 pm
Er Jyotika Sambyal
Executive Engineer PWD R and B Division Vijaypur
Please refer to BOQ
2026_PWDJK_326760_1
59 of 2026-27 Dated 01.10.2026
Open Tender
Civil Works
Percentage
180 days
Executive Engineer PWD R and B Division Vijaypur
Please refer to tender documents
3 documents required · 3 mandatory
₹600
Executive Engineer PWD R and B Division Vijaypur
₹87,480
Executive Engineer PWD R and B Division Vijaypur
1 Oct 2026
1 Oct 2026
16 Oct 2026
1 Oct 2026
15 Oct 2026
1 Oct 2026
3 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres ( All kinds of soil ) | 42.35 | Cum | 256.85 | ₹10,877.6 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with, 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 7.22 | Cum | 5,202.9 | ₹37,564.94 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 27.55 | Cum | 5,733.6 | ₹1,57,960.68 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns | 78.66 | Sqm. | 286.35 | ₹22,524.29 |
| 5 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete | 10.5 | Sqm. | 416.5 | ₹4,373.25 |
| 6 | Dumping stones behind abutment and walls in horizontal and on level incl. supply of stones | 10.64 | Cum | 1,042.9 | ₹11,096.46 |
| 7 | Supply of labour for laying RCC Hume Pipes in position of 0.60m dia. | 15 | Mtr. | 2,500 | ₹37,500 |
| 8 | Supply and laying of River Bed Materials including leveling, dressing, watering & consolidation in layer 20cm in depth each layer consolidated with power road roller of minimum 8 tonne capacity incl. carriages complete, | 273 | Cum | 300 | ₹81,900 |
| 9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 42.35 | Cum | 218.4 | ₹9,249.24 |
| 10 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil. | 42 | 100Sqm | 2,412 | ₹1,01,304 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.30 MB
BOQ_1105368.xls
BOQ • 0.86 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .