Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹94.3 LAccepted-AOC 124 A NSC BOSE ROAD KOLKATA 700 092 | KOLKATA | KOLKATA | WEST BENGAL | 700092 | L1 | Accepted-AOC Lowest offer given | |
| 2 | L2₹96.8 L+₹2.5 L (2.62%)Rejected-Finance A 8 GREEN PARK NEW DELHI 110016 INDIA | NEW DELHI | SOUTH DELHI | DELHI | 110016 | L2 | Rejected-Finance Higher offer given |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
21 Oct 2024, 2:00 pmClosed
Addl. General Manager (Engg)-IV
HIDCO BHABAN
Consultancy Work for Improvement of Traffic Management System by constructing Vehicular Underpass on both directions at Westin, 7th Rotary, Noapara, Chinar Park intersections of MAR 1111 in Newtown, Kolkata.
2024_HIDCO_727334_2
HIDCO/AGM(E)IV/CN/NIT40/24-25
Open Tender
CIVIL WORKS
Item Rate
485 days
New Town
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹50,000
31 Jan 2025
30 Sept 2024
23 Oct 2024
30 Sept 2024
21 Oct 2024
30 Sept 2024
The intersectios are as follows : a) The Westin intersection. b) 7th Intersection (Shrachi More). c) Noapara intersection. d) Chinar Park Intersection. Part : A i) Detail physical survey of all the intersection and their adjoining areas including Topographical survey for all four locations as proposed. ii) Survey of the underground utilities at all four locations coordinating with all concerened department like RVNL,WBSEDCL,PHE,BGCL etc. iii) 24 hours traffic survey for 7 consecutive days in all the four intersections. iv) Study of the proper drainage system during and after construction of the VUP for all the four intersections. v) Preparation of feasibility study and submission of report for all the four intersections. Part : B This part should be undertaken after submission of the feasibility report and acceptance of the report by the competent authority of WBHIDCO. If feasibility report (Part-A) is not accepted by the WBHIDCO or partially accepted by WBHIDCO then either no payment or proportionate part payment will be released against ‘Part-B’. i) Necessary Soil test (Geotechnical Report) at all four locations. ii) Structural design and submission and detail structural drawing with vetting from reputed Institute like IIEST/JU/IIT (Requisite charges for Vetting will be borne by the HIDCO). iii) Submission of D.P.R. with B.O.Q. based on West Bengal Public Works Deptt. Schedule of Rates and Market Rates where rates are not available in the Schedule and other relevant papers. iv) Design and drawing of the proposed drainage infrastructure with proper design of Pumping system. v) Proper calculation of Curves as per IRC of both side, slope portion of VUP. vi) Design of the ventilation system. vii) Detail of all interior works, illumination and Surveilance system. Part : C i) Any other relevant design and drawing to make this structure operational including checking and approval of fabrication / shop drawing during execution. ii) Periodical site visit during construction period including submission of as-built drawing after completion of work. Periodical site visit during construction period including submission of as-built drawing after completion of work. [For payment scheduler please follow the NIT]
Add CGST @9% of Total amount of Sl No. 1
Add SGST @9% of Total amount of Sl No. 1
Intercontinental Consultants and Technocrats Pvt. Ltd (BID ID -5686940)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .