Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹1.2 Cr
EMD Value
₹1.2 L
Closing Date
16 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, Kheda R. & B. Division, at Nadiad
Repairing & Renovation of Existing Godown at Matar (Taluka Matar) District Kheda
361219
NIT-25 of 2026-27
Open
Civil Works - Buildings
Works
Nadiad
6 documents required · 6 mandatory
₹3,600
Executive Engineer Kheda R&B Division Nadiad
₹1.2 L
30 Oct 2026
30 Oct 2026
30 Oct 2026
16 Nov 2026
30 Oct 2026
120 days
Item RateIn
(with brief specification and reference to book of Quantity Unit Amount
No. Figure
specifications)
[1] Brick work using common burnt clay building bricks 93.38 Cum. 4289.33
having crushing strenght not less than 35 Kg./ Sqm. in
cement mortar 1:6 (1 cement : 6 Fine sand) in super
structure above plinth level upto floor two level (for
G.F) Conventional
[2] Providing 15mm thick cement plaster in single coat on 406.00 Sqm 221.60
fair side of bricks/ concrete wall for interior plastering
upto floor two level finished even and smooth in
cement mortar 1:4 (1 cement :4 sand) etc. complete.
[3] Providing 20mm thick sand face cement plaster on 406.00 Sqm 335.65
walls upto height 10 meters above ground level
consisting of 12mm thick backing coat of C.M. 1:3
(1Cement ;3Sand) and 8 mm thick finishing coat of
C.M. 1:1 (1cement ; 1 Sand) etc. complete.
[4] Finishing wall with weather proof exterior emulsion 1920.00 Sqm 114.53
paint on wall surface (two coats) to give an required
shape even shade after thoroughly brushing the
surface to remove all dirt, and remains of loose
powdered materials.etc complete
[5] Providing and fixing M.S.Compund gate of required 1050.00 Kgs 140.95
pattern to fix on wall as per given detailed drawing
using M.S. flats, M.S. Square bars, Cast iron decorative
pattern and fixing with necessary required nuts, bolts
and welding works etc. comp. (B) Ornamental
[6] Painting two coats including priming coat on new steel 42.00 Sqm 122.98
and other meatl surfaces with enemal paint brushing
interior to give an even shade including cleaning the
surface of all dirt, dust and other foreign matter.
[7] Providing & fixing 0.80 mt. high SS razor fencing using 310.00 Rmt. 585.91
1.70 mt. long Ms angle 40 x40 x 6 mm size as a pole
having 0.80mm stragh and 0.45 mt both side inclined
part as datail drawing & desing fixed at 3.00m c/c in
CC 1:2:4 (double angle at turnig with support) as per
drawing in brick masonry wall with three horizontal
lione at bottom part and four line with double ring
consertium medium blade having coil diameter 450 to
600 mm 3-5 spiral clip. core diameter 2.50mm tap
thickness SS Razor wire made form SS galvenized as
per drawing with GI staples including one cost of
premix red lead paint and two cost of white enamel oil
paint of asian /berget mnake raw silk shed etc
complete as directed by enginner in charge .
Description of Item
Item RateIn
(with brief specification and reference to book of Quantity Unit Amount
No. Figure
specifications)
[8] Box cutting the road surface to proper slope and 1739.00 Cum. 104.20
chamber for making a base for road work including
removing the excavated stuff and depositing on the
road side slope as directed up to 50 mts. Lead.
[9] Construction of granular Sub base by providing coarse 633.00 Cum. 1124.09
graded material BTMC using metal 53mm to
mm@ 35%, aggregate 26.5 mm to 4.75 mm @ 45%
and stone dusts 2.36 mm 7 below @ 20% incl.
spreading in uniform layers with motor grader on
prepared surface mixing by mix in place method with
rotavator at OMC and compacting with vibratory roller
to achieve the desired density complete as per Clause
401.2 Table 400.1 grade-I
[10] Providing and laying in foundation cement concrete 378.00 Cum. 3308.00
1:3:6 (1 cement : 3 coarse sand :6 20mm B.T. Stone
aggregate) and curing complete excluding cost of form
work in :(a) Foundation plinth.
[11] Providing and laying controlled cement concrete 891.00 Cum. 4242.00
M.200 and curing complete including the cost of
formwork and reinforcement for reinforced concrete
work in(A) Foundations, footings, Base of columns and
Mass concrete
[12] Compaction and finishing of cement concrete road by 3391.00 Sqm 80.80
tremix process, providing extra labour charge for
tremix (Vaccum dewatering service) process on
cement concrete road surface by using vaccum
dewatering pump floater surface vibrator including
making groove 5mm width and filling with polyvynile
polymer and rough finish to surface as per instruction
including leveling etc. complete.
[13] Providing and laying in position FE 500D TMT bar 41.74 MT 73217.53
reinforcement including cutting, bending, hooking and
tying complete as per detailed drawings for the
following.(A)All RCC Work
[14] Providing and fixing junction board of M.S.plates and 2.00 No. 5236.70
angles as per standered IRC design including fixing in
C.C. 1:4:8 with necessary excavation, painting, figuring
and lettering on board etc. comp.
[15] Excavation for foundation upto 1.50mt.Depth 55.00 Cum. 149.67
including sorting out and stacking of useful materials
and disposing of the excavated stuff as directed with in
all lead & Lift (B) Dense or Hard soil
[16] Providing & laying cement concrete 1:4:8 (1 Cement : 7.00 Cum. 2680.21
4 Coarse sand : 8 B.T.aggregates 20mm nominal size)
and Curing complete excluding cost of form work in
foundation and plinth
Description of Item
Item RateIn
(with brief specification and reference to book of Quantity Unit Amount
No. Figure
specifications)
[17] Providing and casting in situ ordinary cement concrete 21.00 Cum. 3448.50
M-100 mix & providing necessary pin headers
including shuttering scaffolding, laying vibrating,
curing & finishing complete without V- Grooves (A)
height from 0.0 to 5.0m.
[18] Supplying and laying reinforced and concrete heavy 20.00 Rmt. 3446.50
duty non pressure pipes with collars for culverts
including setting and joining the pipes in C.M. 1:2
watering and laying (to level or slope) of I.S. class NP3
900mm internal diameters
[19] Constructing providing and fabricating cattle guard 25.00 Sqm 5340.88
using channel section frame of size ISMC series
mm x 50 mm (Weight 9.20 kg/Rmt) and ISMC section
100 mm x 75mm (weight 11.50 kg/Rmt) intermediate
support for welding G.I.pipe at 12 Cm C/C of size
mm in a frame made of Channel section size 100 mm x
50 mm all round including fixing the unit on prepared
chamber of masonary wall using MS hold fast
embeded in masonary wall top as directed by Engineer
in charge and as per drawing and necessary required
arrangement etc complete.
[20] Excavation for foundation up to 1.5 Mt. depth incl. 500.00 Cum. 117.08
sorting out and stacking of useful materials and
depositing of excavated stuff up to 50 mt. lead (A)
loose or soft soil
[21] Providing and Casting in situ controlled Cement 179.00 Cum. 4549.01
Concrete M-250 for R.C.C. Raft and cutt-off walls
including necessary shuttering laying, vibrating,
ramming and curing complete.
Total Rs.
I/We am/are willing to carry out the work at…...................... % above/below percent (Should be written in
figures and words) of the estimated rate mentioned above. Amount of my /our tender works out as under.
Estimated amount put to tender Estimated amount put to
Deduct………% below Add………% Above
In words In words
Description of Item
Item RateIn
(with brief specification and reference to book of Quantity Unit Amount
No. Figure
specifications)
1. The Contractor shall exhibit a board with detailed specification and details of work as directed by the
Engineer-In-Charge for which no extra payment shall be made.
2. The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3. GST and Income tax TDS will be deducted at a source while making payments of bills
4. In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.:
PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C.
items where there is a change as per actual mix design the cost of difference of cement consumption
have been deducted from the rate of original item at the rate of input rate mentioned in all the tender.
5. Credit of Dismantal Material amount of Rs……NA…. must be recovered from Contractor's R.A Bill.
6. Payment will be given only if the material testing result is satisfactory.Testing of material shall be
done as per statement attached with specification
Signature of Contractor Deputy Executive Engineer Executive Engineer
R & B Sub Division Kheda R & B Division
Kheda Nadiad
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1_ SBD Tender Documents.pdf
2_ BOQ Price-Bids.pdf
3_ Index Specification.pdf
4_ Technical Specification.pdf
5_ Govts Circulars.pdf
6_ Building Specification.pdf
7_ Testing Schedule.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .