Loading…
Loading…
Tender ID
Tender Value
₹45.7 L
EMD Value
₹91,348
Closing Date
20 Apr 2026, 2:00 pmClosed
Ex. Engineer R and B Division Shopian
RnB division shopian
Construction of Building at Middle School Zaipora
2026_PWDJK_307669_4
01/187-96/RnB/SPN/e-tender of 10-04-2026
Open Tender
Civil Works
Percentage
200 days
Shopian
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,100
Ex. Engineer R and B Division Shopian
₹91,348
10 Apr 2026
10 Apr 2026
21 Apr 2026
11 Apr 2026
20 Apr 2026
11 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil | 1 | Cum | 0.2 | ₹0.2 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited
layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 1 | Cum | 0.6 | ₹0.6 |
| 3 | Providing and laying stone soling duly hand packed in maintaning level and section including all carriages complete | 1 | Cum | 0.8 | ₹0.8 |
| 4 | Providing and laying in position cement concrete 1:4:8 (1
Cement:4 Corase sand: 8 grade stone aggregate 40 mm
nominal size crushed including curing but excluding the
cost of centring and shuttering. All work upto plinth level including all carriages complete | - | Cum | 0.2 | - |
| 5 | Providing and laying in position of reinforced cement concrete 1:1.5:3 (1 Cement, 1.5 Corase sand: 3 grade stone aggregate 20mm nominal size crushed including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All work upto plinth level including all carriages complete | 1 | Cum | 0.4 | ₹0.4 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°,landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering,finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) including all carriages | - | Cum | 0.6 | - |
| 7 | Reinforcement for R.C.C. work including straightening,
cutting, bending, placing in position and binding all
complete Thermo-Mechanically Treated bars of grade Fe 500D or more. Inculding all carriages complete | - | Kgs | 0.8 | - |
| 8 | Providing and laying in position cement concrete 1:2:4 (1
Cement:2 Corase sand: 4 grade stone aggregate 20 mm
nominal size crushed including curing but excluding the
cost of centring and shuttering upto plinth level and above plinth level upto to required height Inculding all carriages complete complete | 1 | Cum | 0.6 | ₹0.6 |
| 9 | Centering and shuttering including strutting, propping etc
and removal of form work for foundations, footings, bases of columns etc | - | Sqm | 0.8 | - |
| 10 | Centering and shuttering including strutting, propping etc
and removal of the same for lintels, girders, bressumers, cantilevers, beams etc complete. | 1 | Sqm | 1 | ₹1 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
BOQ_998007.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .