Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.4 LAccepted-AOC KOTTAYAM | KOTTAYAM | KERALA | 686001 | ₹7.4 L | 1 | Accepted-AOC Lowest |
| 2 | 2₹8.0 LRejected-Finance | ₹8.0 L | 2 | Rejected-Finance 2nd lowest |
| 3 | Rejected-Technical | - | - | Rejected-Technical 3rd lowest |
Tender Value
₹8.5 L
EMD Value
₹21,200
Closing Date
18 May 2026, 11:00 amClosed
EXECUTIVE ENGINEER, TDB, MAVELIKKARA
OFFICE OF THE EXECUTIVE ENGINEER, TDB, MAVELIKKARA-690101
DBHS Thakazhy in Ambalapuzha group-Annual maintenance and urgent repairs to school building during 2026-27 RETENDER
2026_TDB_849500_2
EEM/ET-08/2026-27
Open Tender
Repair and Maintenance Works
Percentage
10 days
Mavelikkara
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,006
₹21,200
26 Jun 2026
14 May 2026
19 May 2026
14 May 2026
18 May 2026
14 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix I - Annual maintenance and urgent repairs to school building | |||||
| 1.01 | Labour charges for clearing school compound | - | each | 1,082.18 | - |
| 1.02 | Labour engaged for repair and maintenance of doors and windows -carpenter 2nd class | - | each | 1,197.94 | - |
| 1.03 | Dismantling and removing Mangalore tiles over roofs including ridges hips valley sheet wind ties and boardering but excluding roof members and stacking materials with a distance of 150 m | 0.4 | M2 | 54.11 | ₹21.59 |
| 1.04 | Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead:Of sectional area below 40 square centimeters | - | Mtr | 18.42 | - |
| 1.05 | Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead:Of sectional area 40 square centimetres and above | - | M3 | 4,607.85 | - |
| 1.06 | Supplying and fixing Dept. wood wrought and put up for roof members including cost and conveyance of materials etc. complete. | - | M3 | 9,940.49 | - |
| 1.07 | Supplying and fixing Anjily wood wrought and put up for roof members including cost and conveyance of materials etc. complete . | - | M3 | 91,245.49 | - |
| 1.08 | Supplying and fixing Anjily wood reapers of size 50x25 mm with wire nails including cost and conveyance of materials etc. complete. | - | M3 | 1,06,262.07 | - |
| 1.09 | Dismantling cement asbestos or other hard board ceiling or partition walls including stacking of serviceable materials and disposal of unserviceable materials within 50 metres lead. | - | M2 | 58.33 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
3rdtendernotice.pdf
Tender Documents • 0.57 MB
priliminaryagreement.pdf
Tender Documents • 0.32 MB
BOQ_1437748.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].