Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹19.3 CrAdmitted-Finance | -2.43% | ₹19.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹19.5 CrAdmitted-Finance | -1.50% | ₹19.5 Cr | L2 | Admitted-Finance |
| 3 | L3₹19.6 CrAdmitted-Finance E 44 GROUND FLOOR SECTOR 36 GREATER NOIDA G B NAGAR UP | -1.20% | ₹19.6 Cr | L3 | Admitted-Finance |
| 4 | L4₹19.6 CrAdmitted-Finance 7 GADHI DADRI G B NAGAR U P | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201008 | -1.00% | ₹19.6 Cr | L4 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹19.8 Cr
EMD Value
₹39.6 L
Closing Date
27 Apr 2026, 5:00 pmClosed
SM (WC-2) Sector 19 Noida
SM (WC-2) Sector 19 Noida
M/o Drain ( (Converting of brick work Main drain to RCC Main Drain From Gijhod to Pillar No-118 and Gijhod to sec-24 side Nala and RE-Construction of NTPC Slab and covering of drain Sector-25A side on MP-2 Road) Noida
2026_NOIDA_1136512_1
61/GM/SM(WC-2)/CB/ET/2025-26
Open Tender
Civil Works - Others
365 days
Noida
Please refer Tender documents.
3 documents required · 3 mandatory
₹8,260
Yes
Noida
₹39.6 L
Yes
2 Jun 2026
13 Apr 2026
28 Apr 2026
13 Apr 2026
27 Apr 2026
13 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. The contractor has to detect different utilities like sewer line, water supply line, electric cable, telephone cable, gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of Engineer-in-Charge. | - | cum | - | - |
| 0.0 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (Zone-III) : derived from natural sources: 8 graded sone aggregate 40 mm nominal size derived from natural sources). | - | cum | - | - |
| 0.0 | Providing and laying in position ready mixed M-25 grade concrete for
reinforced cement concrete work, using coarse aggregate as wall as fine aggregate derived from natural sources and cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/recoverable separately). | - | Cum. | - | - |
| 0.0 | Centring and shuttering including strutting, propping etc. and removal of form work for. Foundation, footings, bases of Columns. (DSR-18/I-5.9.1/P-97). | - | Sqm | - | - |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | - | Sqm. | - | - |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form for : Suspended floors, roofs, landings, balconies and access platform | - | Sqm. | - | - |
| 0.0 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | - | kg | - | - |
| 0.0 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar | - | Cum. | - | - |
| 0.0 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent designn mix) | - | Cum | - | - |
| 0.0 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within
50 metres lead as per direction of Engineer - in- charge. | - | Cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
C61.xls
Additional Documents • 0.05 MB
TD61.pdf
Tender Documents • 5.72 MB
BOQ_2122304.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid