Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹3.4 Cr
EMD Value
₹3.4 L
Closing Date
29 Oct 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer, K.R.B.C. Division, Surat
Constructing Box type Drainage Syphon in place of Existing Drainage Syphon at Ch. 3390 m of Ukai Right Bank Main Canal.
355142
12 of 2026-27
Open
Civil - All
Works
Surat
13 documents required · 11 mandatory · 2 optional
₹6,000
Executive Engineer, K.R.B.C. Division, Surat
₹3.4 L
14 Oct 2026
14 Oct 2026
14 Oct 2026
29 Oct 2026
14 Oct 2026
Name of Work :-
Constructing Box type Drainage Syphon in place of Existing Drainage Syphon at Ch. 3390m of Ukai Right Bank Main Canal.
Qty Item Description of Item Rate Unit Amount
In figure In words
296.54 1 Dismentalling the existing Stone masonry 757.40 Rupees Seven CM
including sorting out and stacking the useful Hundred Fifty
materials and removing the debries and making Seven and Forty
good the damage etc. complete as directed. (b) In Paise Only
5104.00 2 Removing of exiting disturbed C.C. Block lining 29.10 Rupees Twenty SM
including opening of joints, stacking the same and Nine and Ten
disposing of stuff as directed etc. complete with all Paise Only
leads and lifts.
413.19 3 Dismentalling the existing foundation concrete 1310.80 Rupees One CM
including disposing the dismentalled stuff Thousand Three
including sorting out and stacking the useful Hundred Ten and
materials and removing the debries and Eighty Paise Only
making good the damage etc. complete as
directed. (c) R.C.C for super structure.
7964.00 4 Excavation for foundation in all sorts of soil 81.50 Rupees Eighty CM
including yellow, sandy, gravelly soil, soft & One and Fifty
hard murrum, etc. dry condition including Paise Only
depositing the excavated stuff in uniform layers in
banks or as directed etc. complete for lead uo to
1.0 Km and all lifts. (By machinery) (a) Above
215.00 5 Earthwork in CNS layer using yellow soil 249.00 Rupees Two CM
excavated from approved borrow area/village Hundred Forty
tanks etc.including breaking clods, dressing to the Nine Only
design section with 16.0 km lead and all lifts. (By
Poclane machinary)
6 Providing and laying plain/ reinforced
Design Mix cement concrete of various
grade with cement, sand and
coarse aggregates including centering,
shuttering, batching, mixing, transporting,
placing, vibrating, smooth finishing, curing etc.
complete for all lead and lift. (Baching Plant
Based, Including dewatering)
1623.82 6A (A) Foundation M-10 3836.00 Rupees Three CM
Hundred Thirty Six
1653.00 6B (B) Piers, abutment, wingwalls, headwall, 4499.60 Rupees Four CM
returnwall etc - grade M-15 Thousand Four
194.00 6C (C) Raft, Bottom slab of barel, footing of 4977.00 Rupees Four CM
columns,piers, abutment and bottom slab of Thousand Nine
sump etc. - grade M-30 Hundred Seventy
356.00 6D (D) Roadway slab, approch salb, chute floor 5336.30 Rupees Five CM
slab,kerb, pier cap, abutment cap, hoisting Thousand Three
platform,top slab of barrel etc. - grade M-30 Hundred Thirty Six
and Thirty Paise
898.00 7 Providing and placing in position reinforcement 7194.00 Rupees Seven Qtl.
bars including cutting, bending welding, joints Thousand One
where necessary, hooking etc. complete as per Hundred Ninety
drawing for all lead and lifts. (A) TMT Four Only
10.00 8 Providing and fixing in position pre moulded 1007.40 Rupees One SM
asphalt or bitumin cork board of approved quality Thousand Seven
and specification as per design and drawing as and Forty Paise
directed. (D) 12mm thickness Only
115.00 9 Providing and fixing in position PVC heavy 384.90 Rupees Three Mt.
duty water stops in barrels, trough, and wing Hundred Eighty
wall with 25 mm wide expension joint as shown Four and Ninety
in drawing including filling the joints with asphalt Paise Only
pad or bitumins or cork board of approved quality.
(A) 225mm wide PVC water stop.
136.00 10 Providing and filling the polysulphide joint selent 533.00 Rupees Five Mt.
of the approved make in the expansion and Hundred Thirty
contraction joints in the c.c. lining including Three Only
clearing the joints with air water jet.
6252.00 11 Earthwork in embankment using soil, soft & hard 118.10 Rupees One CM
murrum excavated from approved borrow Hundred Eighteen
area/village tanks etc.including breaking clods, and Ten Paise
dressing to the design section with lead up to 5.0 Only
kilometer and all lifts.(By poclane machinary)
6467.00 12 Compaction of selected soil/hard murrum/soft 10.40 Rupees Ten and CM
murrum in even thickness of 15 to 20 cms Forty Paise Only
including watering rolling of suitable capacity etc.
complete as directed.
4320.00 13 Providing and laying plain / reinforced cement 659.40 Rupees Six SM
concrete lining of M-15 grade in bed, side slopes Hundred Fifty Nine
and curvature including batching, mixing, and Forty Paise
transporting placing, smooth finishing, curing Only
including dewatering where required. ( machinary
based without Paver) (c) 15 cm thick lining in Bed
54177.00 14 Excavation of canal/drain in all sorts of soils 82.40 Rupees Eighty CM
(including wet and slushy condition of soil) Two and Forty
including depositing the excavated stuff in uniform Paise Only
layers in canal banks or in spoil banks or as and
wheredirected including dressing the canal
section up to lead of 50 mt. and lift including
clearing the site etc. complete ( by Machinery for
canal / drain maintenance ) ( up to 1.5 cumecs
capacity of canal / drain )
586.00 15 Supplying and laying flexible gabions of size 1m 2180.80 Rupees Two No.
x 1m x 0.5 m of rope 9mm dia 4 Strand P.P. Thousand One
materials mesh opening 100 mm * 100 mm filled Hundred Eighty
with 20 to 40 kg trap rubble stone and Eighty Paise
(approximate weight 0.75 tonne) as per Only
drawing including packing, inter locking of
stones and stiching, fusing top of gabione
and tying to each other and laying to the
required line, level, slope with all leads and lifts as
directed etc. complete.
434.00 16 Finishing wall with weather proof exterior emulsion 120.26 Rupees One SM
paint on wall surface (two coats) to give an Hundred Twenty
required shape even shade after thoroughly and Twenty Six
brushing the surface to remove all dirt, and Paise Only
remains of loose powdered materials.etc
386.00 17 Quarrying, transporting and laying inclined or 443.80 Rupees Four CM
horizontal sand filter for earthen dam in layers Hundred Forty
of specified thickness as directed including Three and Eighty
watering, rolling etc. complete with all leads and Paise Only
104.00 18 Providing and fixing in position 110 mm dia PVC 263.70 Rupees Two Mt.
pipe weep holes in abutment, wing wall, and Hundred Sixty
laying training etc. complete Three and
1.00 19 Providing & fixing in position sign board of 3011.30 Rupees Three No.
standard size of 1.20mx0.90m with M.S angle Thousand Eleven
40mmx40mmx6mm with 3mm thick iron plate and Thirty Paise
including fixing in 1:5:10 prop. Concrete block size Only
40cmx40cmx75 cm including painting existing
data on the board etc. complete as directed.
1.00 20 Providing videography on the occasion of 1230.51 Rupees One 4 Hrs.
function or for ongoing construction work Thousand Two
including dubbing, titling etc.complete including Hundred Thirty
cost of cassate/CD. (b) up to 4.0 hours and Fifty One
Rs. Three crore Forty Three Lakhs Eighty Thousand Seven Hundred Seventy Eight and Paisa Seventy Two only.
I/We am/are willing to carry out the work at _________________________________________________________________ % (percentage)
above/below (Should be written in figures and word) of the estimated rates mentioned above. Amount of my/our tender works out as under.-:
* Estimated Amount put to tender * Estimated Amount put to tender
*(Please strike out whichever is not applicable).
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no extra
payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017 Cement
Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original item at the rate of input rate mentioned in all the tender.
Deputy Executive Engineer Executive Engineer
Velachha Distry Sub Division K.R.B.C. Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1. SBD BOOK 3390 mt.pdf
2. work and site 3390 mt.pdf
3. sch-B3390.pdf
4. cement and steel 3390.pdf
5. Drawing 3390 mt.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .