Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹1.5 L+₹1,687.86 (1.12%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹1.5 L+₹2,035.83 (1.35%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹1.6 L+₹7,949.65 (5.26%)Rejected-Finance | L4 | Rejected-Finance L4 |
Tender Value
₹1.8 L
EMD Value
₹4,612
Closing Date
5 Aug 2023, 11:00 amClosed
Assistant Executive Engineer
O/o the Assistant Executive Engineer PWD Buildings Sub division PMG Thiruvananthapuram
DEPOSIT - Central Store - Maintenance of compound wall - General Civil Work
2023_PWD_590319_1
PWD/BLDG/TR/3151/2023_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
60 days
Thiruvananthapuram
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹4,612
Yes
22 Aug 2023
26 Jul 2023
7 Aug 2023
26 Jul 2023
5 Aug 2023
26 Jul 2023
Amount
civil works
15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
15.18:Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates,boltd, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead.
OD250190/2022-2023:Engaging coolie
OD259003/2022-2023:Departmental Random rubble masonry with hard stone in foundation and plinth up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
OD47837/2023-2024:Random rubble masonry with hard stone in foundation and plinth up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
13.60.1:Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade:Two or more coats on new work
14.54.1:Painting with synthetic enamel paint of approved brand and manufacture of required colour to an give even shade:One or more coats on old work
10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
16.70.1:Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts , bolts and washers as required complete as per the direction of Engineer-in- charge.Made of G.I. wire of dia 4 mm
6.2.2:Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in:Cement Mortar 1:6 (1 cement : 6 coarse sand)
50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.
50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete
Johny John j k
BABU GEORGE
RAJESH SOMAN
Bidder Name
BABU GEORGE
MOHAN P
Johny John j k
RAJESH SOMAN
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_873472.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .