Tender Value
₹2.0 Cr
EMD Value
₹3.9 L
Closing Date
5 Jun 2026, 12:30 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
MGS
14 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Similar nature of work: Any work involving outdoor or Indoor signalling work. Signalling Work - All works which are directly related to the interlocking of the Core Signaling System. OR Any MACLS work involving outdoor & indoor work or alteration in existing Indoor/outdoor signaling system OR Any work involving outdoor/indoor signalling works including MACLS/ EI/ PI/RRI/IBS/IBH/LC Gate/ DAC / ELD and ELD for Signalling Cable, Quad Cable, Fuse Auto Change Over System etc.
98 conditions · 12 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Verification of Tender's credentials:- The tenderers shall submit a copy of certificate stating that they are not liable to be disqualified and all their statements/documents submitted along with bid are true and factual. Standard format of the certificate to be submitted by the bidder is enclosed as Annexure-V. Non submission of a copy of certificate by the bidder shall result in summarily rejection of his/their bid. It shall be mandatorily incumbent upon the tenderer to identify, state and submit the supporting documents duly self attested / digitally signed by which they/he are/is qualifying the Qualifying Criteria mentioned in the Tender Document.
The tenderer shall clearly specify whether the tender is submitted on his own (Proprietary Firm) or on behalf of a Partnership Firm / Company / Joint Venture (JV) / Registered Society / Registered Trust / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc. The tenderer(s) shall enclose the attested copies of the constitution of their concern, and copy of PAN Card along with their tender. Tender Documents in such cases are to be signed by such persons as may be legally competent to sign them on behalf of the firm, company, association, trust or society, as the case may be.
If it is NOT mentioned in the submitted tender that tender is being submitted on behalf of a Sole Proprietorship firm / Partnership firm / Joint Venture / Registered Company etc., then the tender shall be treated as having been submitted by the individual who has signed the tender.
The tenderer whether sole proprietor / a company or a partnership firm / joint venture (JV) / registered society / registered trust / HUF / LLP etc if they want to act through agent or individual partner(s), should submit along with the tender, a copy of power of attorney duly stamped and authenticated by a Notary Public or by Magistrate in favour of the specific person whether he/they be partner(s) of the firm or any other person, specifically authorizing him/them to sign the tender, submit the tender and further to deal with the Tender/ Contract up to the stage of signing the agreement except in case where such specific person is authorized for above purposes through a provision made in the partnership deed / Memorandum of Understanding / Article of Association /Board resolution, failing which tender shall be summarily rejected.
A separate power of attorney duly stamped and authenticated by a Notary Public or by Magistrate in favour of the specific person whether he/they be partner(s) of the firm or any other person, shall be submitted after award of work, specifically authorizing him/them to deal with all other contractual activities subsequent to signing of agreement, if required. Note: A Power of Attorney executed and issued overseas, the document will also have to be legalized by the Indian Embassy and notarized in the jurisdiction where the Power of Attorney is being issued. However, the Power of Attorney provided by Bidders from countries that have signed the Hague Legislation Convention 1961 are not required to be legalized by the Indian Embassy if it carries a conforming Appostille certificate.
The tenderer shall clearly specify whether the tender is submitted on his own (Proprietary Firm) or on behalf of a Partnership Firm / Company / Joint Venture (JV) / Registered Society / Registered Trust / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc. The tenderer(s) shall enclose the attested copies of the constitution of their concern, and copy of PAN Card along with their tender. Tender Documents in such cases are to be signed by such persons as may be legally competent to sign them on behalf of the firm, company, association, trust or society, as the case may be.
Following documents shall be submitted by the tenderer in case of Sole Proprietorship Firm: Sole Proprietorship Firm: (i) An undertaking that he is not blacklisted or debarred by Railways or any other Ministry / Department of Govt. of India from participation in tender on the date of opening of bids, either in individual capacity or as a member of the partnership firm or JV in which he was / is a partner/member. Concealment / wrong information in regard to above shall make the contract liable for determination under Clause 62 of the General Conditions of Contract. (ii) All other documents in terms of explanatory notes in clause 10 of GCC 2022.
Following documents shall be submitted by the tenderer in case of HUF: A copy of notarized affidavit on Stamp Paper declaring that his Concern is a proprietary Concern and he is sole proprietor of the Concern OR he who is signing the affidavit on behalf of HUF is in the position of 'Karta' of Hindu Undivided Family (HUF) and he has the authority, power and consent given by other members to act on behalf of HUF. (ii) An undertaking that the HUF is not blacklisted or debarred by Railways or any other Ministry / Department of Govt. of India from participation in tender on the date of opening of bids, either in individual capacity or as a member of the partnership firm or JV in which HUF was / is a partner/member. Concealment / wrong information in regard to above shall make the contract liable for determination under Clause 62 of the General Conditions of Contract. (iii) All other documents in terms of explanatory notes in clause 10 of GCC 2022.
Following documents shall be submitted by the tenderer in case of Partnership Firm: The tenderer shall clearly specify that the tender is submitted on behalf of a partnership firm. (i) A notarized copy of partnership deed. (ii) A notarized or registered copy of Power of Attorney in favour of the individual to tender for the work, sign the agreement etc. and create liability against the firm. Note :- One or more of the partners of the firm or any other person (s) shall be designated as the authorized person (s) on behalf of the firm, who will be authorized by all the partners to act on behalf of the firm through a "Power of Attorney", specially authorizing him / them to submit & sign the tender, sign the agreement, receive payment, witness measurements, sign measurement books, make correspondences, compromise / settle / relinquish any claim (s) preferred by the firm, sign "No Claim Certificate", refer all or any dispute to arbitration and to take similar such action in respect of the "said tender" / contract. Such "Power of Attorney" shall be notarized / registered and submitted along with the tender.
Following documents shall be submitted by the tenderer in case of Company registered under Companies Act 2013: (i) The copies of MOA (Memorandum of Association) / AOA (Articles of Association) of the company (ii) A copy of Certificate of Incorporation (iii) A copy of Authorization/Power of Attorney issued by the Company (backed by the resolution of Board of Directors) in favour of the individual to sign the tender on behalf of the company and create liability against the company. (iv) An undertaking that the Company is not blacklisted or debarred by Railways or any other Ministry / Department of Govt. of India from participation in tender on the date of opening of bids, either in individual capacity or as a member of the partnership firm or JV in which the Company was / is a partner/member. Concealment / wrong information in regard to above shall make the contract liable for determination under Clause 62 of the General Conditions of Contract. (v) All other documents in terms of explanatory notes in clause 10 of GCC 2022
Following documents shall be submitted by the tenderer in case of LLP (Limited Liability Partnership): If the tender is submitted on behalf of a LLP registered under LLP Act-2008, the tenderer shall submit along with the tender: A copy of LLP Agreement. (i)A copy of Certificate of Incorporation (ii)A copy of Power of Attorney/Authorization issued by the LLP in favour of the individual to sign the tender on behalf of the LLP and create liability against the LLP. (iii)An undertaking by all partners of the LLP that they are not blacklisted or debarred by Railways or any other Ministry / Department of the Govt. of India from participation in tenders / contracts as on the date of submission of bids, either in their individual capacity or in any firm/LLP or JV in which they were / are partners/members. Concealment / wrong information in regard to above shall make the contract liable for determination under Clause 62 of the Standard General Conditions of Contract. (iv)All other documents in terms of Para 10 of the Tender Form (Second Sheet). (v) All other documents in terms of explanatory notes in clause 10 of GCC 2022.
The Railway reserves the right to verify all statements, information and documents submitted by the bidder in his tender offer, and the bidder shall, when so required by the Railway, make available all such information, evidence and documents as may be necessary for such verification. Any such verification or lack of such verification, by the Railway shall not relieve the bidder of its obligations or liabilities hereunder nor will it affect any rights of the Railway there under.
In case of any information submitted by tenderer is found to be false forged or incorrect at any time during process for evaluation of tenders, it shall lead to forfeiture of the tender Earnest Money Deposit besides banning of business for a period of upto five years.
In case of any information submitted by tenderer is found to be false forged or incorrect after the award of contract, the contract shall be terminated. Earnest Money Deposit (EMD), Performance Guarantee and Security Deposit available with the railway shall be forfeited. In addition, other dues of the contractor, if any, under this contract shall be forfeited and agency shall be banned for doing business for a period of upto five years.
Non-compliance with any of the conditions set forth therein above is liable to result in the tender being rejected.
Certificates and testimonials regarding contracting experience for the type of job for which tender is invited with list of works carried out in the past.
Certificates which may be an attested Certificate from the client, Audited Balance Sheet duly certified by the Chartered Accountant etc regarding contractual payments received in the past.
The list of personnel / organization on hand and proposed to be engaged for the tendered work. Similarly list of Plant & Machinery available on hand and proposed to be inducted and hired for the tendered work.
In case of more than one L-1 bidders, tender may be awarded to tenderer having higher Bid Capacity. In case Bid Capacity is also the same tenderer having done more value of similar work in last three previous financial years and the current financial year upto the date of opening of the tender, may be selected for the award instructions with respect to Bid Capacity will follow.
GCC -2022 with latest amendments and instructions is an integral part of the contract document. All terms and conditions mentioned therein to be followed.
Rates are inclusive of all taxes/octroi, license fee, royalty charges etc. legally leviable by State, Central Govt. and/or any other local authority.
In addition to GCC 2022 and Indian Railway Unfiled standard specification works materials volume I II 2010, revised up to date, special condition attached shall also apply.
Taxes as per GST (1st july2017), Income tax, TDS, Sales tax/Business tax, Royalty etc Royalty etc. will be recovered as per extant instruction on the subject.
Certificates from private individuals for whom such works are executed being executed is not acceptable.
Eligibility criteria for works tender in respect of partnership firms to be dealt as per GCC -2022.
In case the tenderer is a partnership firm s , the experience, solvency and turn over shall be in the name and style of the firm only.
If the tenderer is a partnership firm, all the partners shall be jointly and severally liable for successful completion of the work and no request for change on the certification of the firm shall be entertained.
During the currency of the contract, no partner of the firm shall be permitted to withdraw from partnership business and in such and event it shall be treated as breach of trust and abandonment of the contract.
Any Conditional offer will be summarily rejected.
For Standard Financial criteria and Standard Technical criteria - Tenderers are required to submitted authenticated certificate along with the tenders from officers of government or semi- government/public sector undertakings under whom the work has been executed indicating there in the name of work executed, value of works/payment details and period during which completed. Such certificates should have signature and seal of the concerned officer. In the absence of such certificate the tender may not be considered. Certificates from private individuals for whom such works are executed being executed is not acceptable.
BOOKS OF REFERENCE: These tender documents are to be read with the followings books with versions updated/corrected/modified up to the date of tender opening: 1) Standard General Conditions of Contract 2022 as amended by updated correction slips termed GCC 2022. 2) Eastern Railway L&M Sch 87 as amended by updated correction slips. 3) E. C. Railway Engineering department unified standard schedule or rates 2012 as amended by updated correction slips (termed USSOR, 2012) up to the date of tender dropping. 4) Standard specifications contained in Indian Railways Hand Book Specifications (works and materials)2010. These four books are where-in-after called the "Books of reference" and shall govern this tender as well as the contract resulting from the acceptance from this tender, to the extent that these contents do not conflict with the contains of the various chapters of these documents.
For those conditions for which standard formats have been given in the uploaded document titled-Formats for uploading of various format. The information should only be submitted in these standard formats.
Railway administration will not be responsible for any delay/difficulties/inaccessibility of the downloading facility for any reason whatsoever. In case of any discrepancy between the tender document downloaded from the internet and the master copy available in the office mentioned above, later shall prevail and will be binding on the tenderer. No claim on this account will be entertained.
If working through contract Labour, the contractor must register with Labour Commissioner necessary license to be submitted with tender or to be produced before signing of contract agreement.
The contractor will be permitted to make use of the service roads already existing within the Railway possession. If additional service roads are required within Railway premises the contractor may be allowed to make them at his own costwith the prior approval of the Railway's Engineer. All service roads required outside Railway boundary shall be constructed by the contractor at his own risk and cost. These roads shall be maintained by the contractor at his own cost. The Railway reserves the right to make use of these service roads as and when necessary without any payment to the contractor.
The Tenderer/Contractor may be required to engage surplus/retrenched casual labors of the Railway, if found suitable up to the extent as deemed fit by the Railway during the currency of the contract. The terms of employment between such labor and the Tenderer/Contractor may be on mutually agreed terms subject to the statutory provisions contained in the Labor Regulations and enactments. The Contractor shall indentify the Railway against any claim arising out of employment of such labour and the Railway shall not be party to any disputes etc. arising out of the employment of such labour by the Tenderer/Contractor.
The intending tenderer should study with General Conditions of Contract, Special Conditions of Contract, and Instructions to Tenderer, Technical Specification, Drawings, Documents, Schedules etc. enclosed and also the General Conditions of Contract, 2022 of the Engg. Department with up to date modifications and IRS Conditions of Contract for the Stores department with up to date modifications all herein after collectively referred to as Tender Specification.
Provision in the instructions, General Conditions of Contract and Special Conditions of the Contract in the tender documents will override any overlapping provisions of General Conditions of contract 2022 of the Engg with up to date modifications and IRS Conditions of Contract for the Stores department with up to date modifications. When there is conflict between General Conditions of contract 2022 and special conditions of the contract, the special conditions shall prevail.
Other Local Taxes levied either by Governmental agency or by Municipal agency shall not be paid by the Railway. These are deemed to be included in the F.O.R. price, unless specifically brought out in the offer.
SCHEDULE COVERING DELIVERY OF MATERIALS AND THE EXECUTION OF THE WORK AT SITE: The tenderer shall attach to his offer a time schedule showing the guaranteed time (i) schedule for the supply of materials, the progress and completion of the works at site. (ii) The time Schedule shall be as referred to in Para - 4 of Instruction to tenderer. (iii) The tenderer should offer the time schedule for supply of materials, the duration of erection and completion period for the work and it should be kept the barest minimum. This aspect will be particularly taken into account while examining the offer. In any case this period shall not be more than the time specified in the tender documents, reckoning from the of date of issue of Letter of Acceptance.
GENERAL REQUIREMENT :(a)All documents to be submitted in connection with this tender will be written in English. (b) Dimensions, weights etc. shall be in Metric System/British Standard Equivalents. The technical terms and symbols to be used will be as per General and Subsidiary Rules/Signal Engineering Manual/Extant Practice of East Central Railway.
ADVICE OF CANCELLATION OF DOCUMENTS BY TENDERER :The Cancellation of any document such as Power of Attorney/Partnership deed etc. should be forthwith communicated by the contractor to the Rly. Administration in writing failing which the Rly. Administration shall have no responsibility or liability for an action taken on the strength of the said document.
Any individuals signing the tender or other documents Connected there with should specify whether he is signing :(a)As sole proprietor of the concern or his attorney. (b)As partner or Partners of the Firm. (c) For the Firm per procure, or as a Director, Manager or Secretary in the case of a Limited Company.
THE RAILWAY NOT BOUND TO ACCEPT ANY TENDER: The Railway shall not be bound to accept the Lowest or any Tender or to assign any reason for non-acceptance or rejection of a Tender. No Tender shall be deemed to have been accepted unless such acceptance shall have been notified in writing to the successful tenderer by the Railway. The Railway reserves the right to accept any tender in respect of the whole or any portion of the work specified in the tender or to divide or reduce the work or to accept any tender for less than the tendered quantity without assigning any reason whatsoever.
The General Instructions and Special Instructions mentioned in various para to be read in conjunction with uploaded tender document which contains important formats/Annexures and Technical bindings and schedule of work etc.
Letter of credit as mode of payment in works tenders or service tenders is available. If is an option for the contractor to take payment from Railways through a letter of credit (LC) arrangement. The details letter of credit is as under:-
Option for Letter of Credit (V) In case tender opts for payment through LC, following shall be the procedure to deal release of payment through LC: (a) The LC shall be a sight LC. (b) The contractor shall select his Advising/Negotiating bank for LC. The incidental cost forward issue of LC and its operation thereof shall be borne by the contractor.(c) SBI, New Delhi ,Main Branch will be the nodal branch for issue of LCs based on online requests received from Railway Accounts Units fortenders opened in financial year 2018-19. SBI branches where the respective Railway Accounts Office has its Account (local SBI branch) will be the issuance/reimbursing branch for LC issued under this arrangement. The Bank shall remain same for this tender till completion of contract. The incidental cost @ 0.15% per annum of LC value, towards issue of LC and operation thereof shall be borne by the contractor and shall be recovered from his bills. (d) The LC shall be opened initially for duration of 180 to 365 days in consultation with contractor. The LC shall be extended time to time as per progress of the contract, on the request of the contractor. The value of LC to be opened initially as well as extended thereafter shall be finalized by the engineer in consultation with the contractor on the basis of expected progress of work. (e) The LC terms and conditions shall inter-alia indemnify and save harmless the Railway from and against all losses, claims and demands of every nature and description brought or recovered against the Railways by reason of any act or omission of the contractor, his agents or employees, in relation to the Letter of Credit(LC). As sums payable/borne by Railways on this account shall be considered as reasonable compensation and paid by contractor. (f) The LC terms and conditions shall inter-aliaprovided that Railways will issue a Document of Authorization (format enclosed as Annexure 2) after passing the bill for completed work, to enable contractor to claim the authorized amount from their bank. (g) The acceptable, agreed upon document for payments to be released under the LC shall bethe Document of Authorization.
Option for Letter of Credit (VI) In case tender opts for payment through LC, following shall be the procedure to deal release of payment through LC: (h) The Document of Authorization shall be issued by Railway Accounts Office against each bill passerby Railways. (i) On issuance of Document of Authorization, acopy of Document of Authorization shall be posted on IREPSfor download by the contractor. A digitally signed copy of Document of Authorization shall also be sent by Railway Account Officer to Railway's bank (Local SBI Branch). (j) The contractor shall take print out of the Document of Authorization available on IREPS and present his claim to his bank (advisingBank) for necessary payments as per LC terms and conditions. The claim shall comprise of copy of Document of Authorization, Bill of Exchange and Bill. (k) The payment against LC shall be subject to verification from Railway's Bank(Local SBI Branch). (l) The contractor's bank (advising bank) shall submit the documents to the Railway's Bank (Local SBIBranch). (m) The railway's bank (issuing bank) shall, after verifying the claim so received w.r.t the digitally signedDocument of Authorization received from Railway Accounts Office, release the payment to contractor's bank (advisingbank) for crediting the same to contractor's account. (n) Anynumber of bills can be dealt within on LC, provided the sumtotal of payments to contractor is within the amount for which LC has been opened. (o) The LC shall be closed after the release of final payment including PVC amount, if any, to the contractor. (p) The release of performance guarantee orsecurity deposit shall be dealt directly by railway with the contractor i.e., not through LC.
For the service rendered by the RITES for inspection of materials supplied by the contractor in works contract, inspection charges @ 1% of the cost of materials including all taxes, excise duty etc. are to be borne by the contractor& no inspection charges are payable to RDSO by contractor for RDSO Inspected materials.
Provision of latest labour laws must be followed as per applicable.
(i) Provision of Railnet connectivity at SEB & RFJ OHE Depots in DDU division. (ii) Augmentation of shed facilities to improve the capacity for IOH/POH of Track Machines as well as improving the storage facilities at PD/DDU. iii) Replacement of defective S&T cable over DDU division. (iv) Arrangement for Shifting of Signaling Material from Existing Signaling Store SSE/S/1/DDU & SSE/S/2/DDU to New Store at DDU in view of 3rd line work in between DDU-PRYJ.
SG-DSE-OT-05-26
SG-DSE-OT-05-26
Open
Works - General
12 Months
Chandauli, Uttar Pradesh
₹0
₹3.9 L
5 Jun 2026
14 May 2026
22 May 2026
117 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 1,96,35,253.31 | ||
| — | 500.00 | — | — | ||
| Supply of 12 fibre mono mode armoured optical fiber cable - fibre to have nominal dia. of 8.8 µm to 9.8 µm and normal cladding diameter of 125 µm ± 1 or better. As per RDSO Spec No.IRS: TC 55 2006 (Rev.1.0) Amendment.3 or latest Make: Finolex or better. (Inspection:Consignee) | — | — | — | 15,490 | |
| — | 4.00 | — | — | ||
| Supply, installation, testing & commissioning of Layer-2 Switch (8 Port POE Giga Managed Switch) for Field as per RDSO Specification No RDSO/SPN/TC/65/2021 Version 6.0 or latest. Execution of work as per site engineer (Inspection: Consignee) | — | — | — | 71,677.72 | |
| — | 4.00 | — | — | ||
| Supply and installation of FMS (12 F-in & out ) rack mountable single mode with Suitable type connector with splicing and termination of OFC cables with all accessories (Pig tail and other materials required for work to be supplied by contractor) Make DLink, Raycom, Tyco or similar. As per technical specification attached as Annexure - A . Execution of work as per site engineer (Inspection: Consignee) | — | — | — | 21,636.32 | |
| — | 2.00 | — | — | ||
| "Supply of online UPS 1 KVA with 2 Hrs Battery Back Up. with SMF batteries of EXIDE/AMCO/SF /AMR RAJA/AMRON . As per technical specification attached as Annexure - A . Inspection- Consignee." | — | — | — | 52,938 | |
| — | 6000.00 | — | — | ||
| Transportation of HDT machine with accessories including handling of stores materials, preparation of site and boring of 110mm dia and placing HDPE pipe of size 63 to 40mm in single / double / triple etc required for crossing/ laying of Railway cables in a combination of quad & signalling cables etc. as per required comprising maximum 72 cores in any HDD section on land /bridges / culverts / track / pucca road crossing and blowing / pulling of Quad / Signalling cables etc. within HDPE pipe. Boring of trench shall be minimum 1(one) Mtr below the track to 1.5 (one point five) minimum 3 (three) meter below the river bed, 01 meter below other lands including road / pucca road 63 to 40 mm dia & its accessories suitable for HDT as permanently lubricated HDPE pipe of size 63 to 40mm crossing area. This includes supply as per Specification No. RDSO/SPN/TC/45 /2013 with latest amendment & cost of the fuel and all other items which will be required for laying of cable through it. Inspection : RITES for HDPE pipe (for inspection charges cost of all sort of HDPE pipe is Rs. 195/- per Mtr.) NOTE: The number of HDPE pipes (of any dia as mentioned above) to be pulled in any HDD section will depend upon the numbers of quad / signalling cables to be pulled through that HDD section as per site requirement. At a particular site, the second /additional HDD is to be done only after completing the pulling of 72 cores of cable through 1st HDD other wise the second /additional HDD will not be counted as a new / additional HDD for the purpose of billing. Only cables to be supplied by Railway. Cable sketch/route plan showing division & depth to be submitted by firm. Execution of work as per site engineer | — | — | — | 69,18,900 | |
| — | 41900.00 | — | — | ||
| "Digging trench 1.0 Mtr deep & 0.3 Mtr wide in all kind of soil , dully clearing any roots, plants etc. The trench should be straight and parallel to track as per RE specification. . If the depth of the trench not uniform in a span of 100 Mtr of shortest length and site condition demands along the cable run, minimum depth will be taken for that particular stretch for payment. Execution of work as per site engineer | — | — | — | 19,47,512 | |
| — | 900.00 | — | — | ||
| "Unwinding of cable using jack findal & pulleys laying of cable ( PIJF , OFC,Quad etc ) in normal cable trench and through pipe without the physical damaged and twist up to the location box. Execution of work as per site engineer | — | — | — | 7,659 | |
| — | 41900.00 | — | — | ||
| "Back filling of trench by shifted earth and ramming of the earth up to original ground level after the work Execution of work as per site engineer | — | — | — | 1,73,466 | |
| — | 1.00 | — | — | ||
| Supply of Permanent Lubricated HDPE telecom duct for use as underground optical fibre cable size 40/33 mm (outer /inner diameter) as per latest RDSO specofication No RDSO/SPN/TC/45/2013 revision with amendment No 1.0 & 2.0 and with following accessories(1) End plug 02 Nos at each KM of duct (2) caable sealing plug 1 No for each Km for duct (3) Plasic coupler - slip Fit/Push fir type-2 Nos for each KM of duct & (4) end cap to be provided along with drum 2 Nos for each KM of Drum) Inspection Consignee | — | — | — | 63,087.05 | |
| — | 1.00 | — | — | ||
| Laying of HDPE duct in the trench excavated under above items and in the protective works (i. e. inside G. l pipes / DWC pipes/boring etc.). at different places as per instruction of site engineer. | — | — | — | 3,000 | |
| — | 500.00 | — | — | ||
| Supply of 6 Fiber armoured mono mode optical fiber cable As per technical specification attached as Annexure - A . (Inspection : Consignee) | — | — | — | 14,875 | |
| — | 4.00 | — | — | ||
| "Supply, installation, testing and commissioning of 24 port LIU (24 Port loaded) along with supply of all accessories suitable for mono mode fibre. as per technical specification attached as Annexure-A. (Inspection : Consignee)" | — | — | — | 58,160.96 | |
| — | 1.00 | — | — | ||
| Supply of 24 Port FXS Gateway 19" Rack Mountable along with Patch Panel/krone module for termination (DC or AC based as per site requirement) and Dual input ports (Fiber/ Ethernet) including mounting kit and all the accessories. As per technical specification attached as Annexure - A Inspection Consignee | — | — | — | 71,888 | |
| — | 2.00 | — | — | ||
| Supply of 8 Port FXS Gateway (AC based) including mounting kit and all the accessories. as per technical specification attached as Annexure-A Inspection : Consignee. | — | — | — | 44,929.48 | |
| — | 1.00 | — | — | ||
| Supply , Installation and commissioning of Online UPS of 3KVA capacity of with 1 hour back up Accepted make: APC, Microtek, Tata Liebert. as per technical specification attached as Annexure-A. Execution of work as per site engineer . (Inspection : Consignee) | — | — | — | 36,207.11 | |
| — | 4.00 | — | — | ||
| Supply and installation of 24 port L2 manage switch as per the RDSO spec. RDSO/SPN/TC /83/2020 Rev 2.1 or latest with 2SFP ports loaded for single mode fiber connectivity. make- CISCO, Netgear, TP-link, D-link or similar.Execution of work as per site engineer . (Inspection authority: Consignee) | — | — | — | 1,43,058.44 | |
| — | 10.00 | — | — | ||
| Supply and installation of 9U 19" wall mounted Rack. Make Comrack/Rattle/ APW/HCL/Valrack or superior as per technical specification attached as Annexure-A. Execution of work as per site engineer . (Inspection: Consignee) | — | — | — | 68,807.4 | |
| — | 8.00 | — | — | ||
| Supply of 1G SFP Optical Module with 10 Km range as per technical specification attached as Annexure-A. (Inspection :Consignee) | — | — | — | 12,937.2 | |
| — | 170.00 | — | — | ||
| Supply of RJ 45 connector suitable for STP/UTP cable as per technical specification attached as Annexure-A (Inspection :Consignee) | — | — | — | 957.1 | |
| — | 74.00 | — | — | ||
| Supply of Single Mode Patch Cord length 3 meters (LC-SC/SC-SC/LC-LC/FC-LC) as per site requirement as per technical specification attached as Annexure-A.(Inspection:Consignee) | — | — | — | 13,256.36 | |
| — | 50.00 | — | — | ||
| Supply of CAT 6 UTP Patch Cord-2 Meters asAs per technical specification attached as Annexure - A. (Inspection :Consignee) | — | — | — | 6,409 | |
| — | 500.00 | — | — | ||
| "Supply of power cable 3 core, 2.5 sq mm, multi strand [36/0.3 mm dia]cable as per IS 694:1990 reaffirmed 1995 or latest suitable for Railway electrification area, shall be of reputed make like Havells, Delton, LAPP, Finolex, or superior. Inspection by Consignee" | — | — | — | 31,980 | |
| — | 710.00 | — | — | ||
| Supply of STP CAT- 6 Cable compliant with latest EIA/TIA-568-B-2-1 Standard for CAT 6 Cable 305 Meters Roll /Bundle. As per technical specification attached as Annexure - A (Inspection: Consignee) | — | — | — | 21,960.3 | |
| — | 500.00 | — | — | ||
| Supply and fixing/laying of 25mm dia 2mm thick PVC pipe (Sudhakar /SR make or superior) on the walls. All the required accessories such as GI clamps, Deep boxes, Jn Boxes, Normal bends, diversion bends etc are to be arranged by the contractor,as specified by supervisor in- charge.Execution of work as per site engineer. (Inspection: Consignee) | — | — | — | 22,100 | |
| — | 148.00 | — | — | ||
| Splicing /Dropping/Termination of each Fiber /Pigtail in the LIU/FDMS/Termination Joints through fusion Splicing of the termination of OFC Cables.Execution of work as per site engineer | — | — | — | 5,194.8 | |
| — | 3500.00 | — | — | ||
| Blowing / Drawing of OFC 24F/12F/6F/Power Cable and CAT Cable (including crimping) through PVC Conduit/Duct/DWC / GI Pipe already installed .Execution of work as per site engineer. | — | — | — | 87,150 | |
| — | 20.00 | — | — | ||
| Supply of Analog CLI phone with Roget box.Make - Beetel or Similar or latest.As per technical specification attached as Annexure - A (Inspection: Consignee) | — | — | — | 32,010 | |
| — | 1.00 | — | — | ||
| "Supply and Installation of basic material to construct unit maintenance free earth as per RDSO Spc.No.RDSO/SPN/ 197/ 2008 or latest, consisting the following (Inspection: Supply Portion- RITES) (i) Copper bonded steel electrodes of 3.0 meter long & 17.0 mm dia with Cu-bondign thickness of min. 250 microns and UL listed and marked =1 no. (ii) Earth enhancement material supplied in sealed bags of min. 10 Kgs =3 nos. (iii) Cu-strip 150x25x6 mm to terminate earth rod=1 no.(iv) Cu-strip 300x25x6 mm (MEEB)=1 no. (v) Cu-strip 150x25x6 mm (SEEB)=1 no.(vi) digging the earth to the required depth(vii) Insertion of electrode(viii) Filling of earth enhancing compound (30 Kg) provision of exothermic weld connection on copper tape/bus bar of 25 mm x 6mm x 150 mm to the earth electrodes all the materials, tools and features required for the weld to be arranged by the contractor-1 no.(ix) Trenching, laying & provision of exothermic weld connecting, one to connect copper tape/35 sq mm multi strand single core PVC insulated copper cable to the copper strip/tape/ busbar welded to the earth electrode and another to the copper tape to be fixed inside the equipment/relay rack/ apparatus room as per RDSO's Spec (fixtures for mounting the copper tape inside the relay room, weld materials, tool features and all other materials required for the weld shall be arranged by the (x) Exothermic weld connection, fixing of Cu- strips and routing the cables to bus bar in equipment/ relay room (all other materials requird for the work shall be borne by the contractor.(xi) Construction of concrete inspection chamber as per RDSO spec. (xii) Any other material said required as per RDSO spec.NOTE:(i) Above includes inter connection of the earthing installed with the already existing earthing electrode, if any, as per site requirement and as per instruction of site incharge. (2) Any other material required as per RDSO spec. (3) All materials required for compelete installation of maintenance free earth, to be supplied by the contractor. ". Execution of work as per site engineer | — | — | — | 18,094.96 | |
| — | 4300.00 | — | — | ||
| Modular disconnecting type terminal block (2 way) with intermediate plate to suite RDSO Spec. RDSO/SPN/189/2004 (Wago or Phonixe or better). Inspection: RDSO | — | — | — | 2,26,180 | |
| — | 154.00 | — | — | ||
| Supply of screw less end stop. Inspection: Consignee. | — | — | — | 2,437.82 | |
| — | 47.00 | — | — | ||
| Supply of steel carrier rail. Inspection: Consignee. | — | — | — | 8,728.37 | |
| — | 4300.00 | — | — | ||
| Fixing, installation fo disconnect terminal (wago or similar) | — | — | — | 5,848 | |
| — | 1135.00 | — | — | ||
| "Horizontal boring/ manual moling without damage to surface road/ track for laying/insertion of DWC/GI/HDPE pipe. The bore shall be done at the depth of minimum 1400 mm from the ground level. The ground level shall be onsidered ignoring bank height of the bank of road. Contractor shall provide all material required for work and adequate nos. of labours for proper laying of cables into the bore. Cable shall be laid cautiously so that it should not get damaged due to rough handling or pressure on cable. Payment of boring shall be made only after DWC/GI/HDPE pipe is laid in the bore. Inspection of pipe Consignee." | — | — | — | 13,62,000 | |
| — | 190.00 | — | — | ||
| Reinstatement of platform and repairing to original state after cable laying work as per instruction of site engineer. | — | — | — | 42,788 | |
| — | 81.80 | — | — | ||
| "Laying cable of different size as per cable route plan approved by Rly. And Meggering of all main & tail cables. As per technical specification of Tender. (Cable route plan will be supplied by site engineer at the time of execution. of work)." | — | — | — | 6,83,254.13 | |
| — | 870.00 | — | — | ||
| "Supply of DWC Pipe for cable protection, track crossing etc. (Size of outer dia 200mm inner dia 175mm). Inspection- Consignee" | — | — | — | 7,68,505.8 | |
| — | 870.00 | — | — | ||
| Installation of DWC pipe with socket coupler | — | — | — | 68,834.4 | |
| — | 40.00 | — | — | ||
| "Suppply of Earth electrode. Material to be procured from reputed firm only. Drg. No. S&T/C-41 NKG or latest. Inspection : Consignee." | — | — | — | 72,425.6 | |
| — | 40.00 | — | — | ||
| Installation of Earth Electrode including MS flat for clamp etc. Signaling equipment's as lever frames, apparatus cases, Signal, relay Rack, Block Instrument etc. | — | — | — | 21,217.6 | |
| — | 40.00 | — | — | ||
| Supply and laying of earth lead wire soldering of lead wire to learth electrode and apparatus case / signal post as per instruction on earthing and providing cement enclosure for learth electrode as per DRG. No. S&T / C -36(NKG). This includes supply of all materials by the contractor. Inspection:Consignee. | — | — | — | 48,498.8 | |
| — | 40.00 | — | — | ||
| "SSupply Appratus case full size lock with key & ward nos. of lock to be advised by Railway before supply. Inspection: RITES." | — | — | — | 8,54,650 | |
| — | 72.00 | — | — | ||
| Supply of E-Type Lock. Inspection :Consignee. | — | — | — | 94,677.12 | |
| — | 15.00 | — | — | ||
| Supply of Key for E-type lock. Inspection: Consignee. | — | — | — | 3,019.65 | |
| — | 180.00 | — | — | ||
| Supply of Bakelite Strip/Sheet of Size (950 x 75 x 12) mm. For fixing 30Nos. ARA terminals/Fuse base terminals/Fuse base. Inspection: Consignee. | — | — | — | 93,416.4 | |
| — | 40.00 | — | — | ||
| Casting, Concreting and Curing of foundation and erection for full apparatus case (GKP- type) as per DRG No. SGW/MGS/L1/91 including cost of all materials required for fixing holding downbolts, casting, concreting and fixing of ""E"" type lock. Note: i) The contractor will provide holding down bolts, ii) Bottom of appratus cases should be filled with sand and the top surface covered with masonry work and neat cementing." | — | — | — | 2,43,651.6 | |
| — | 40.00 | — | — | ||
| Fixing, wiring of terminal strips, bakelite strip, transformers,relays fuses with base and supply and fixing of shelves for full appratus case with termination earthing of cable and wiring with lettering as required including supply of wires and micsellenous materials, sand filling and plastering over sand filling per location. (All materials except transformers, relay, terminal strips, bakelite strip and fuses with base to be spplied by the contractor.) | — | — | — | 1,93,904.4 | |
| — | 175.00 | — | — | ||
| Supply of slotted angle for fixing hylem sheets in steel apparatus cases. (Size 40x40x2mm). Inspection Consignee. | — | — | — | 40,087.25 | |
| — | 10.00 | — | — | ||
| Supply of Microcontroller based Quad Cable Conductor's Earth Resistance Sensing Unit, for 24 nos. conductors with metering facility for one conductor at a time. Inspection:RITES | — | — | — | 9,17,509 | |
| — | 10.00 | — | — | ||
| Installation of Microcontroller based Quad Cable Conductor's Earth Resistance Sensing Unit for 24 nos. conductors with metering facility for one conductor at a time. | — | — | — | 92,633 | |
| — | 5.00 | — | — | ||
| Supply & Installation of earthleakage detector as perRDSO/SPN/256/2002 withlatest Amnd. with 6 digitcounter (in 19" sub rack withinsulation tester) 12 channel. Make- Annu Vidyut or similar(RDSO approved source). Inspection: RDSO | — | — | — | 10,94,263.85 | |
| — | 1350.00 | — | — | ||
| Supply and fixing (Laying ) of G.I pipe with threaded collars of 100 mm nominal bore spec. No. IS 1239 or latest medium grade . Perforated of required length on bridges/below metalled road /L- xing / Culvert,( as required at site) .(All fixing material to be supplied by Contractor). Inspection Consignee. | — | — | — | 11,61,702 | |
| — | 1025.00 | — | — | ||
| Road Crossing with dismantling tarcol / concrete Road. Earth work in any type of soil as per direction of SSE/T at site when cable has to cross the Road . Repairing of the Road to its original stat after laying of the cable | — | — | — | 3,33,237.75 | |
| — | 39.00 | — | — | ||
| "Installation of Thermo shrink Jointing kit (spec no. IRS:TC -77-2012 Rev. 1) with amendment no 2 for Quad /derivation cable straight through and derivation joint for LC gate etc where VF transformer not required. Execution of work as per site requirement and instruction of site engineer.""" | — | — | — | 45,160.44 | |
| — | 39.00 | — | — | ||
| Filling of sands in side the location box 8.4 cft. Execution of work as per site engineer | — | — | — | 17,550 | |
| — | 17.00 | — | — | ||
| Filling earth around location box/signal post for a width of 0.5 m on all side, upto a level of 150 mm below the foundation top. This work includes consolidation of earth by watering. Execution of work as per site engineer | — | — | — | 2,576.01 | |
| — | 660.00 | — | — | ||
| Laying of power /data/OFC/CAT6/ Screened cable through PVC pipe Laying of Communication CAT-6 cables/OFC cables/power cables in 1" / 25 mm dia PVC conduct pipe /Laying of 6 Quad cable in HDPE pipe as per site condition. This includes laying and installation /clamping charges of PVC pipe/HDPE pipe with protective arrangements at Bridges etc | — | — | — | 15,714.6 | |
| — | 8.00 | — | — | ||
| Concreting on Railway cables/S&T gears with required for execution of the work will be supplied by firm as per site engineer. This includes water curing of concreted portion for minimum 3 days. | — | — | — | 40,689.52 | |
| — | 455.00 | — | — | ||
| Loading unloading of heavy S&T materials from Existing Store under SSE/S/1/DDU & SSE/S/2/DDU to New Store at DDU by Tractor including transportation. | — | — | — | 11,14,750 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
OpeningofLC.pdf
ATTACHMENT
TederformfortheTenderer2022.pdf
ATTACHMENT
AnnexVwithcorrection.pdf
ATTACHMENT
PerformaofPoliceVerification.pdf
ATTACHMENT
GUIDELINESTOTHETENDERER.pdf
ATTACHMENT
LatestGCC-2022-ACS6.pdf
ATTACHMENT
CorrectionSlipNo1ofGCC2022.pdf
ATTACHMENT
CorrectionSlipNo2ofGCC2022.pdf
ATTACHMENT
CorrectionSlipNo.3ofGCC2022.pdf
ATTACHMENT
CorrectionSlipNo4ofGCC2022.pdf
ATTACHMENT
CorrectionSlipNo5ofGCC2022.pdf
ATTACHMENT
CorrectionSlipNo.6ofGCC2022.pdf
ATTACHMENT
CorrectionSlipNo7ofGCC2022.pdf
ATTACHMENT
NewfinancialcritariaVIB.pdf
ATTACHMENT
Procedureforundertakingdiggingwork11.pdf Procedure for undertaking digging w
ATTACHMENT
AnnexVIGCC2022.pdf
ATTACHMENT
Receiptcertificatforsuppyonly-AnnexR.pdf
ATTACHMENT
AnnexureA.pdf
ATTACHMENT
CorrectionSlipNo11ofGCC2022.pdf
ATTACHMENT
Procedureforundertakingdiggingwork11.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .