| 1 | L1₹1.3 CrAdmitted-Finance 403 4TH FLOOR PARK CENTRA NH 8 SECTOR 30 GURGAON HARYANA 122001 | GURUGRAM | HARYANA | 122001 | ₹1.3 Cr | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | Rejected-Technical Technically Non-Responsive |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technically Non-Responsive |
| Sl No | Description | Qty | Unit | Voyants Solutions Private Limited L1 |
|---|---|---|---|---|
| 1.00Remuneration for Local Staff (inclusive of per Diem allowance) | ||||
| 2.00PROFESSIONAL Staff | ||||
| 3.00 | Team Leader cum Senior Highway Engineer | 6 | Man Months | 2,50,000 ₹15,00,000 Lowest |
| 4.00 | Senior Bridge Engineer/ Structural Engineer | 3 | Man Months | 1,50,000 ₹4,50,000 Lowest |
| 5.00 | Geotechnical cum Material Engineer | 4 | Man Months | 1,50,000 ₹6,00,000 Lowest |
| 6.00 | Geologist | 3 | Man Months | 2,00,000 ₹6,00,000 Lowest |
| 7.00 | Senior Survey Engineer | 4 | Man Months | 1,00,000 ₹4,00,000 Lowest |
| 8.00 | Traffic and Safety Expert | 2 | Man Months | 1,20,000 ₹2,40,000 Lowest |
| 9.00 | Environmental Specialist | 3 | Man Months | 1,00,000 ₹3,00,000 Lowest |
| 10.00 | Quantity Surveyor/ Documentation Expert | 6 | Man Months | 80,000 ₹4,80,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
15 Apr 2025, 3:00 pmClosed
Ankush Mehta
NHIDCL HQ
Consultancy Services for Preparation of DPR for major bridge connecting NH-10 with NH-510, realignment from Ch. 0 to Ch. 3.074 on NH-510 into 2LPS and permanent mitigation measures on sinking sliding zones 2ND CALL
2025_NHIDC_850410_1
NHIDCL/Sikkim/DPR/510/Singtam /25
Open Tender
Consultancy
Item Rate
180 days
Singtam
Refer tender docs
5 documents required · 5 mandatory
₹5,900
MD NHIDCL
₹2 L
NHIDCL HQ
15 Jul 2025
21 Feb 2025
16 Apr 2025
21 Feb 2025
15 Apr 2025
17 Mar 2025
21 Feb 2025 - 7 Mar 2025
7 Mar 2025
Amount
Remuneration for Local Staff (inclusive of per Diem allowance)
PROFESSIONAL Staff
Team Leader cum Senior Highway Engineer
Senior Bridge Engineer/ Structural Engineer
Geotechnical cum Material Engineer
Geologist
Senior Survey Engineer
Traffic and Safety Expert
Environmental Specialist
Quantity Surveyor/ Documentation Expert
Land Acquistion Expert
Utility Expert
Sub-Professional Staff: (one sub-professional to be a fresh graduate)
Assistant Highway Cum Pavement Engineer
Survey Engineer
Assistant Quantity Surveyor/Documentation Expert
Support Staff (Fixed Rates)
Office Manager (1 No.)
Typist (1 No.)
Office Boy (1 No.)
Night Watchman (1 No.)
Transportation (Fixed Costs)
The vehicles hired by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for use of consultants (1 Vehicle for 6 months)
Duty Travel to Site (Fixed Costs)
All Trips
Office Rent (Fixed Costs)
The rent cost includes operation & maintenance, cleaning, repairs, etc for entire duration of services.
Office Supplies, Utilities and Communication (Fixed Costs)
Office Supplies, Drafting Supplies, Computor Running Costs, Domestic and International Communication
Office Furniture and Equipment (Fixed costs)
Office Furniture and Equipment
Reports and Document (Fixed costs)
Monthly Report (03 sets)
Inception Report & QAP
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Strip Plan with L.A. Reports
Draft LA and Clearances I Report
Final LA and Clearances I Report
Draft Environmental Assessment report & RAP
Final Environmental Assessment report & RAP
Draft Detailed Design Report & Drawings etc.
Draft EMP
Draft Bidding Documents
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.
Final EMP
Final Bidding Documents
Draft 3(a) ,3(A) and 3(D) notification for land acquisition( 3 copies each)
LA & Clearances II Report
Survey and Investigation
A. Topographical Survey (Fixed Rate)
Complete Topographic Survey using mobile/ aerial LiDAR or equivalent/better technology for project approach area including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer, preparation of Drawings and their submission as per contract provision.
B. Investigation (Fixed cost)
All investigations/surveys including Road and Bridge Inventory, FWD Test and Pavement Evaluation, Roughness Survey, Axle Load Survey, Material Survey and Investigation, Sub-grade Investigation, Traffic Survey, Socio-economic & Census Survey/Studies, Land Acquisition Studies, any other investigation surveys etc.
Net Work Survey and GPR
Net work Survey of the existing Highways as a repository for civil work as per directions from Authority.
GPR Survey for detection of under ground utilities
Sub-soil Investigation & Other Works
Sub-Soil Investigation
a) Boring in all type of soils (other than hard rock)
b) Boring in hard rock
Cost of supply and fixing Boundary Pillars
Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval.
Land Acquisition Team including support staff and logistics/transportation
A. Land acquisition Team including support staff
Ex-Land Revenue Inspector/Officer or equivalent
Ex-Kanoongo/ Girdawar or equivalent
Ex-Patwari or equivalent
Typist
B. Logistics for Land acquisition Team
Computer including necessary peripherals
Printers
Vehicles (Bolero or equivalent) with monthly running limit of 4000 km (01 no)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .