| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 LAccepted-Finance | L1 | Accepted-Finance OK | |
| 2 | L2₹10.3 L+₹34,888 (3.51%)Accepted-Finance | L2 | Accepted-Finance OK | |
| 3 | Rejected-Technical | - | Rejected-Technical DUE TO NOT FULL FILL TECHNICAL CRITERIA | |
| 4 | Rejected-Technical | - | Rejected-Technical DUE TO NOT FULL FILL TECHNICAL CRITERIA | |
| 5 | Rejected-Technical | - | Rejected-Technical DUE TO NOT FULL FILL TECHNICAL CRITERIA |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
23 Sept 2021, 12:15 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE
CHANDRAWAL WATER WORKS
Renovation/Repairing of HCC side Clarifier no 3 at Chandrawal WW -II
2021_DJB_208483_4
NOTICE INVITING TENDER NO. - 7 (2020-21)
Open Tender
Miscellaneous Works
Works
90 days
CHANDRAWAL WATER WORKS
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
DJBEMD A/c No-50448339804 THROUGH SUBPAISA GATEWAY
₹20,000
Yes
4 Oct 2021
17 Sept 2021
23 Sept 2021
17 Sept 2021
23 Sept 2021
17 Sept 2021
17 Sept 2021 - 23 Sept 2021
120 days
Closing the incoming gate of incoming water in the clarifier by manual labour and opening the same after completion of work
Dewatering & Cleaning of complete Clarifier by dewatering pump sets of suitable capacity and manual labour with proper safety equipments as per site requirement.
Disconnecting the electricity supply from the centre slip ring box, motor & panel box by electrician. The job includes making the electric connection after complation of work.
Dismantling of motor & gear box, pinion gear, bearing brackets, Slip ring etc. as required and shifting the same to outside safe place as per direction of engineer in charge.
Dismantling of bridge from the turn table with the help of mechanical/hydraulic jacks with proper support and holding the bridge with statically balanced support this include the loading, unloading cost of packing and hiring of lifting arrangement to carry out the work, material, wooden square Block, T&P etc ( also making welding to make strong thrust support by welding process with deploying technical staff/ labour, T&P tool and tackles after complete the work as per site requirement.
Dismantling and Removing of turn table of bridge and flocluter from the centre of bridge. Removing of each part one by one with top base frame, base plate of :urn table, upper part, middle part, one by one by special type lifting arrangement by tools and tackles and long boom hydra crane anti taking the turn table at safe place outside from the clarifier
Providing and fixing of wooden block of required shape and size. The job includes Dismantling of existing wooden block
Repairing of complete turn table (bottom, middle & Top) by making of fixture to hold on lathe machine and removing of old damage liner and making new groove with finishing cut by lath machine and fixing of new liner with proper way as per existing and making of groove for fixing of oil seal arrangement by complete lathe operarion this includes the cartage, loading & unloading plant to work shop to & fro
Cutting & removing of old damage bevel teeth and making groove for fixing of new main bevel gear & final machining to make proper size by lath machine. Making providing and fixing new main bevel gear of existing size in the top peace of flocculator turn table by making hole with threading and fixing hard tamperd bolts with proper alignment
Providing of GM liner as per existing size with proper machining and finishing
Providing of pinion gear as per existing size
Repairing of pinion shaft making bearing seat and gear seat by remateling and complete machining work
Repairing overhauling gear box by Repairing of non workable mechanical parts like worm gear, worm shaft, making bearing seat in housing and at the shaft on both side, replacement of oil seal, bearing 4 nos. includes the machining charge and lubrication
Reassembling of complete repaired turn table (bottom, middle & Top) motor & gear box, pinion, bearing brackets, chain, sprocket on its original position as required by site with the help of heavy labour and technical supervisor with skilled technical staff etc. With complete tools and tackles as required by job. Include the job removing of all wooden and MS support and fixing the bridgeon turn table at proper level with alignment for smooth running and using of all sefety equipments for safety of workers at the height
Providing of nut bolts of various sizes.
Fabrication and fixing of canopy for the protection of gear box and motor of bridge and flocculator by using of MS angle of size 50x50x5 and fiber sheet
Testing & Commissioning of trial run of complete clarifier on no load condition for one day & on load condition 3 days (Day & night shift.)
MK ENGG.CO.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .