Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
20 Jul 2026, 11:00 amClosed
Single Packet
Normal Tender
No
Not Applicable
Itemwise/Consigneewise
Lowest to Highest
TPI Agency
Not Applicable
90 days
Expenditure
General
82
4 conditions · 3 needing a document upload
/We engage to supply the Western Railway with the articles specified above upon the terms of the Indian Railway Standard Conditions of contract (latest revision) and upon the terms of t he R e v i s e d Special Conditions and instructions for the guidance of the contracts issued by the Western Railway S/137/F Revised May 2011 Amendment No. 10 of November 2017.
Bulk order will be placed on the firm having satisfactory past performance for Di electric shoes as per tender specific or its equivalent specifications to any Zonal Railway/ PU/State Government/ Govt, PSU/Any Public Limited company in last 3 completed financial years and current year.
Order will only be placed on OEM/Manufacturer or their auhtoirzed dealers with tender specific authorization. Offers without tender specific authorization will be summarily rejected.
Please upload detailed specifications, brochure, catalogue and/or such related technical documents of offered product and clearly mention offered Make/Brand in the offer. Any deviation from tendered description should be clearly mentioned.
31 conditions
MARKING : Manufacturer to mark his name and date of manufacture as per drawing, wherever indicted, or at a location where it may not get obliterated in service on the item being supplied by them against the purchase order. Supplies received without this are liable to be rejected by consignee.
MSE : a] Please indicate whether you are registered with any of the following Micro & Small Enterprises (MSE) agencies : District industries Centres, KVIC, KVIB, Coir Board, NSIC, Diretorate of Handicraft & Handloom or any other body specified by Ministry of MSME.[Name the agency clearly] b] If you are registered with any of the above mentioned agencies, lease indicate the terminal validity date of registration and also indicate whether the Enterprise is owned by SC/ST.
Risk purchase TIME LIMIT FOR MAKING RISK PURCHASE WILL BE 9 MONTHS INSTEAD OF 6 MONTHS.
Validity : Tenderers to quote minimum 90 days validity of offers.
LIQUIDATED DAMAGE (LD) ON DELAYED SUPPLY: Recovery of Liquidated Damage (LD) shall be levied @ 1/2% (half percent) of the price of the store per week or part of the week during which delivery is accepted and the upper limit for recovery of LD in supply contracts is 10%(ten percent) of the value of contract irrespective of delays, unless otherwise provided, specifically in the contract.
ADVANCE ACCEPTANCE/COUNTER OFFER AND DELIVERY PERIOD: The delivery period in Store Procurement cases shall be reckoned from the date of issue of Advance PO/Letter of Advance Acceptance/Letter of Acceptance.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
1 location across Gujarat · 245 Pair total
Di- Electrical safety shoes
82265410A~WR
82265410A
Open - Indigenous
Goods
Gujarat
₹0
₹1.3 L
20 Jul 2026
26 Jun 2026
1 item · 245 Pair total
Supply of various size of Di- Electrical safety shoes, Electric Shock Resistant up to 30 KV as p er attached specification. Technical Specification for Art 9721W Product: 30kV Dielectric Boot with Steel To e. 1). Size range : 6-9 2).Type of construction Vulcanized Rubber Upper and Sole. 3).Last/ Sole Pattern PSV & VSV/ ST 4).Specialty Tested individual boots at 30kV under wet condition 5).Recommendation For workin g environment with high voltage hazards Power station operations Substation (step-up/ step-down/ distribu tion) operations Electrical hazards with wet condition/ water exposure High current leakage hazards Electrical installations. 6). Compliance- ASTM F2413-18 M I/C EH European Standard CE Approved ? EN ISO 20345 : 2011 (SB E FO HRO SRA) EN 50321-1:2018 Class 3 AC (for installations with nominal voltage up to 26500V A.C. SB = Standard basic protection as per EN ISO 20345 E= Heel energy absorption FO = Fuel oil resistant outsole HRO = Resistant to hot contact SRA =Slip resistance on ceramic tile with Sodium Lauryl S ulphate CSA Z195-14 / ASTM F 2413-18 Grade 1 Toe protection Compression resistance, 11kN 18 kV Electri c Shock Resistance (ESR) protection. 7). Dielectric Footwear* ASTM F1117-03(2013) (min 20,000VAC) 8). Li ning Material Selected polyester grade lining comes with extra comfort and durability 9). Upper constructio n Leak-proof (Electrically verified) Reinforced rubber upper High visibility with orange and green contrast E asy for cleaning. 10). Sole / Heel Electrical shock resistant sole suitable for high voltage/ current environme nt Slip resistant vulcanized rubber outsole Good abrasion resistant for extra durability Heel energy absorpti on design to minimize the heel impact. 11). Steel Toe Cap Epoxy coated toe caps for anti-corrosion Meets C SA Z195 impact andASTM F2413 compression tests. 12). Chemical Resistance Sole & Upper - Good resistan t towards acids and alkalis 13). Finishing Lacquer coating for weather protection. 14). Packing Recyclable P olybag & 6pairs in a carton. Various sizes of electrical safety shoe as per requirement (Size 5-12) [ Warran ty Period: 30 Months after the date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| SECTION ENGINEER (TRD) STORES VISHWAMITRI, WR | Gujarat | 245.00 Pair |
| Total | 245 Pair | |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .