Tender Value
₹22.7 L
EMD Value
₹50,000
Closing Date
23 May 2026, 5:00 pmClosed
Executive Engineer,PMU ,Kattakada.
O/o Executive Engineer,PMU,Kattakada
Reconductoring 11kV Line with Covered Conductor at various locations and installing one number 100kVA DTR under Electrical Section, Vamanapuram of Electrical Division, Nedumangad under Electrical Circle, Kattakada
2026_KSEB_842849_2
EE/PMU(KTDA)/ET-57/2025-26 dated 03.03.2026
Open Tender
Electrical Works
Percentage
120 days
Vamanapuram
7 documents required · 7 mandatory
₹5,900
₹50,000
20 Aug 2026
22 Apr 2026
26 May 2026
22 Apr 2026
23 May 2026
22 Apr 2026
22 Apr 2026 - 29 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling (without damage) one km 11kV line (three conductors) including dismantling cross arm, insulators, disc, disconnecting jumper connection, rolling the conductor and stacking the materials. | - | km | - | - |
| 2 | Additional rate for providing one disc set, PG clamp etc. complete, on any type of HT pole for making cut point. | - | No | - | - |
| 3 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle). | - | No | - | - |
| 4 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). | - | No | - | - |
| 5 | Fitting and erecting one HT A type Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). | - | No | - | - |
| 6 | Fitting and erecting one HT Double Pole Structure using PSC pole in position including fitting 2 channel cross arms, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). | - | No | - | - |
| 7 | Fitting 6 channel cross arms, AB switch, DO fuse, Station class LA, HT & LT connections upto OH lines, etc. on existing DP structure, Fixing distribution box/provision for one set (3No.) of LT fuses, drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing & mounting of Transformer on poles. | - | No | - | - |
| 8 | Transferring LT single phase 2/3 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. | - | No | - | - |
| 9 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. | - | No | - | - |
| 10 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite. | - | No | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1434304.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BID57.pdf
Tender Documents • 0.35 MB
BOQ_1434304.xls
BOQ • 0.30 MB
corri57.pdf
PDF • 0.03 MB
corri57.pdf
PDF • 0.03 MB
Corrigendum57.pdf
PDF • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .