| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.3 CrAccepted-Finance M S ASHAPURI INFRACON PVT LTD VILLAGE AND PO HURLA TEHSIL BHUNTER DISTT KULLU H P | ₹1.3 Cr | 1 | Accepted-Finance 1 |
| 2 | 2₹1.3 CrRejected-Finance M S ASHAPURI INFRACON PVT LTD VILLAGE AND PO HURLA TEHSIL BHUNTER DISTT KULLU H P | ₹1.3 Cr | 2 | Rejected-Finance 2 |
| 3 | Not Admitted-Fee/PreQual/Technical M S ASHAPURI INFRACON PVT LTD VILLAGE AND PO HURLA TEHSIL BHUNTER DISTT KULLU H P | KULLU | HIMACHAL PRADESH | 172002 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.2 Cr
EMD Value
₹2.5 L
Closing Date
6 May 2026, 5:00 pmClosed
EE Manali Division HP PWD Manali
EE Manali Division HP PWD Manali
CO by Pass road from NH 03 Saba Restaurant to club House Manali
2026_PWD_135069_1
latter No-1041.48 dated 24.04.2026
Open Tender
Civil Works
365 days
manali
CO by Pass road from NH 03 Saba Restaurant to club House Manali
5 documents required · 5 mandatory
₹5,000
₹2.5 L
15 Jun 2026
27 Apr 2026
7 May 2026
27 Apr 2026
6 May 2026
27 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Excavation in soil in Hilly Area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per Technical Specification Clause 1603.1with-in all leads and lifts and other incidental and as per entire satisfaction and direction of Engineer-in-Charge. The rate is including Octroi, Royality, Malkana, Toll-Tax or any other imposed by the Government but excluding GST. | 212.26 | Per Cubic metre | 278.05 | ₹59,018.89 | BI01010001010000000000000515BI0100001114 |
| 2 | Earth work in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 metre, dressing of sides and bottam and back filling in trenches with-in all leads and lifts and other incidental and as per entire satisfaction and direction of Engineer-in-Charge. The rate is including Octroi, Royality, Malkana, Toll-Tax or any other imposed by the Government but excluding GST. | 433.27 | Per Cubic metre | 388.25 | ₹1,68,217.08 | BI01010001010000000000000515BI0100001115 |
| 3 | Stone masonry in cement mortar for super structure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 In cement mortar (1:5)with-in all leads and lifts and other incidental and as per entire satisfaction and direction of Engineer-in-Charge. The rate is including Octroi, Royality, Malkana, Toll-Tax or any other imposed by the Government but excluding GST. | 18.88 | Per Cubic metre | 6,848.55 | ₹1,29,300.62 | BI01010001010000000000000515BI0100001116 |
| 4 | Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 In cement mortar (1:6)with-in all leads and lifts and other incidental and as per entire satisfaction and direction of Engineer-in-Charge. The rate is including Octroi, Royality, Malkana, Toll-Tax or any other imposed by the Government but excluding GST. | 769.15 | Per Cubic metre | 5,711.65 | ₹43,93,115.6 | BI01010001010000000000000515BI0100001117 |
| 5 | Providing and laying reinforced cement concrete pipe NP3 for culverts on 1st class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation protection work and back filling and concrete work in head wall and parapets clause 1101 900 mm dia with-in all leads and lifts and other incidental and as per entire satisfaction and direction of Engineer-in-Charge. The rate is including Octroi, Royality, Malkana, Toll-Tax or any other imposed by the Government but excluding GST. | 7.5 | Per running metre | 7,328.4 | ₹54,963 | - |
| 6 | Providing and laying dry rubble flooring as per drawing and technical specification clause 1303.3 with-in all leads and lifts and other incidental and as per entire satisfaction and direction of Engineer-in-Charge. The rate is including Octroi, Royality, Malkana, Toll-Tax or any other imposed by the Government but excluding GST. | 0.49 | Per Cubic metre | 3,666.9 | ₹1,796.78 | - |
| 7 | Back filling behind abutment , wing wall and return wall complete as per drawing and technical specification clause 1206.3with-in all leads and lifts and other incidental and as per entire satisfaction and direction of Engineer-in-Charge. The rate is including Octroi, Royality, Malkana, Toll-Tax or any other imposed by the Government but excluding GST. | 157.86 | Per Cubic metre | 1,454.75 | ₹2,29,646.84 | - |
| 8 | Providing weapholes in retaing walls and Breast walls , with 100mm dia PVC pipe extending through the full width of structure with slop of 1(v) towards drawing face complete as per drawing and technical specification clauses 614,709 and 1206.6with-in all leads and lifts and other incidental and as per entire satisfaction and direction of Engineer-in-Charge. The rate is including Octroi, Royality, Malkana, Toll-Tax or any other imposed by the Government but excluding GST. | 476.5 | Each | 445.7 | ₹2,12,376.05 | - |
| 9 | Providing and laying concrete for plain / reinforcement conc. In open foundation as per drawing and technical specification clause 802,803,1202, 1203and 1206 PCC grade 1:6:12 for nominal mix with-in all leads and lifts and other incidental and as per entire satisfaction and direction of Engineer-in-Charge. The rate is including Octroi, Royality, Malkana, Toll-Tax or any other imposed by the Government but excluding GST. | 75 | Per Cubic metre | 5,008.25 | ₹3,75,618.75 | - |
| 10 | Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8with-in all leads and lifts and other incidental and as per entire satisfaction and direction of Engineer-in-Charge. The rate is including Octroi, Royality, Malkana, Toll-Tax or any other imposed by the Government but excluding GST. | 2,677.91 | Per Cubic metre | 1,467.75 | ₹39,30,502.4 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BOQ_199927.xls
BOQ • 0.28 MB
Bidbypass.pdf
Tender Documents • 2.74 MB
Download all tender documents and submit your bid