Nodal Officer, WDC 2.O Project C/o Project Director District Watershed Development Unit, Dang-Ahwa
WDC 2.O Supplementary DPR- Constructing Farmpond No.4, Field Outlet 2 Nos., Gabian Structure 11 Nos. at Payarpada
279415
03 /WDC 2.0 Purak DPR 2025-26
Open
Civil Works - Others
Works
Dang
7 documents required · 3 mandatory · 4 optional
₹900
DWDU DANG PROJECT FUND BATCH-6
₹12,413
21 Feb 2026
21 Feb 2026
21 Feb 2026
9 Mar 2026
21 Feb 2026
Name of work :-
Under Workphase Head : WDC 2.O Supplementary DPR- Constructing Farmpond No.4,
Field Outlet 2 Nos., Gabian Structure 11 Nos. at Payarpada
PMKSY – WDC 2.O /02/2021-22 Kanchanghat Project
(Supplementary DPR)
Watershed Committee-: Payarpada
1 Downloading of tender documents(Last Date and Time) 09-03-2026 –18:00
2 Online Submission of bid (Last Date and Time) 09-03-2026 –18:00
Submission of EMD, Tender Fee and mentioned documents 12-03-2026 –18:00
(Last Date and Time)
Technical Bid: Online Verification of documents(Date and 13-03-2026 –12:00
5 Online opening Commercial Bid (Date and Time) 13-03-2026 –12:30
6 Estimated cost of work. Rs.12,41,299/-
Demand Draft of Tender fees from any nationalised bank will
7 be in favour “DWDU DANG PROJECT FUNDBATCH-6” Payable at Rs.900/-
Demand Draft of EMD from any nationalised bank will be in
8 favour “DWDU DANG PROJECT FUNDBATCH-6” Payable at Rs.12,413/-
Tender document issued by: Tender bid submission address :
President Nodal Officer, WDC 2.O,
Village Watershed Committee C/o Project Director, District Watershed
Payarpada Development Unit, Ahwa
Beside DEE (R&B) Panchayat Division-1 Ahwa,
Nr.Shardha Hospital, Taluka Ahwa District
Under WorkphaseHead : WDC 2.O Supplementary DPR- Constructing Farmpond No.4,
Field Outlet 2 Nos., Gabian Structure 11 Nos. at Payarpada.
પ્રોજેકટન ું નામઃ-WDC 2.O/02/2021-22 કાુંચનધાટ પ્રોજેકટ તાલકોઃઆહવા જિલોઃડાુંગ
જિલા િ્રાવ સવકામ કમત તનતગતનક મુંકજત િ્રાવ સવકામ કામ હેમ હ ્ WDC
કાુંચનઘાટ પ્રોજેકટ મુંજર થમે છે . જેના ગામઃ Galkund, તા.આહવા જી.ડાુંગ હ ્ આ પ્રોજેકટ માટ
1 Jakhana F/620/DANG 23/02/2023 Gujarat/637/dang 23/02/2023
2 Chinchpada (Galkund) F/621/DANG 23/02/2023 Gujarat/638/dang 23/02/2023
3 Galkund F/612/DANG 04/02/2023 Gujarat/629/dang 04/02/2023
4 Pipalpada (Galkund) F/619/DANG 23/02/2023 Gujarat/636/dang 23/02/2023
5 Mohpada (Galkund) F/617/DANG 23/02/2023 Gujarat/634/dang 23/02/2023
6 Vanar F/609/DANG 04/02/2023 Gujarat/626/dang 04/02/2023
7 Ambalia F/615/DANG 04/02/2023 Gujarat/632/dang 04/02/2023
8 Umarya F/610/DANG 04/02/2023 Gujarat/627/dang 04/02/2023
9 Wanki F/618/DANG 23/02/2023 Gujarat/635/dang 23/02/2023
10 Payarpada F/613/DANG 04/02/2023 Gujarat/630/dang 04/02/2023
11 Ranpada F/611/DANG 04/02/2023 Gujarat/628/dang 04/02/2023
12 Bhapkhal F/614/DANG 04/02/2023 Gujarat/631/dang 04/02/2023
13 Bhurapani F/616/DANG 04/02/2023 Gujarat/633/dang 04/02/2023
GST અંગે સ ૂચના
તા. ૦૧/૦૭/૨૦૧૭ થક GST કરમા્ખ ું અમમાું આવે છે . જે અનમાર મદર કામમાું GSTમાું દશાણવ્મા
સ ૂચના આપવામાું આવે છે . જે ધ્માને ઈ GSTનાું નવા કરમા્ખા અનમાર ટન્ડર ભરવાના રહશે.
ટન્ડરમાું ભર ભાવો GST તથા અન્મ ટક્ષ મહીતનાું ગણવામાું આવશે પાછ્થક ટન્ડરમાું GSTનાું
૪. ટેન્ડર ફીની રકિન ડીિાુંડ ડ્રાફ્ટ (Payableat.........................)
૫. ાનાની રકિન એફડડીડઇર(Payableat.............................) (પ્રથમ પેઇિમાું દશાણવ્મા મિબ હેમ નું.૮)
> .-એફડડીડઇરડ (e-FDR) ચલાિિાિાું ઇિ્ે નરેિં,
૭. GST રજી્રસશનન ું પ્રમાણ પર.
૧૧. WDT સમસવ ઇિનેર/WDT ગ્રકકલચર ક્સમપટણ નક સચના પ્રમાણે કામ કરાવવાના િથ્થાને
૧૮. કામગકરીન ું આખરી બક MDT સમસવ ઇિનેર દ્વારા ચકામણક કમાણ બાદ CC આપવાન ું રહશે.
૨૪. જબનક રકમમાુંથક કપાતપાર બનતક હશે, તે TDS તથા અન્મ િરૂરી કરનક રકમ જબમાુંથક
૨૬. સવવાદનક બાબતમાું પ્રોજેકટ ડામરક્સટર્ક, DWDU-ડાુંગ અને ચેરમેન્ક,DWDU- ડાુંગ, જિલા
કામ પહાનાું ેવ તથા T.B.M વગેર WDT ઈિનેર પામે ખરાઈ કરાવક ેવા.
૨૯. કામ પ ૂણણ થમા બાદનાું ફાઈન ેવ અને માપ કોન્્રસાક્સટર WDT ઈિનેર/માથે રહી ેવાનાું
રહશે. WDT ઈિનેર દ્વારા ેવામાું આવે માપો માન્મ રહશે અને મમમ મમાણદામાું
MDTઈિનેરદ્વારા ેવામાું આવે માપો માન્મ રહશે.
ઓદફમર અને WDT ઈિનેર પામેથક પ્રમાણકત કમાણ બાદ જે આગ્નક કામગકરી હાથ ધરવાનક
૩૬. કામગકરી માટ જે – તે ખાતાનાું SOR ેવામાું આવ્મા છે , તે આઈટમ માટ જે- તે ખાતાનાું
૪૭. મુંજર થમે ટન્ડરના કામોનો જાણવણક (MAINTANANCE)નો મમમગા્ો બે વર્ણનો રહશે.
5&P ;\A\lWT V[Hg;L T[G[ ;F\[5[, SFDULZL lGIT U]6J¿F;EZ VG[ ;DIDIF"NFDF\
SZJFDF\ lGQO/ HX[ TF[ H[ T[ V[Hg;LG[ GF[8LX VF%IF AFN TFtSF,LS V;ZYL SFDULZL
5ZYL N]Z SZLG[ lGIDF[G];FZ H[ V[Hg;L VF NZYL SFDULZL SZJF ;\DT CX[ TF[ T[G[
;]lRAwW SZL SFDULZL ;F\[5JFDF\ VFJX[P ;DI VG[ U]6J¿FGF[ VD,GF\ SFDF[ DF8[
B]A H DCTJ5}6" CF[I T[DF\ SF[.56 ;\HF[UF[DF\ AF\WKF[0 R,FJL ,[JFDF\ VFJX[ GCLP
U]6JTF V\U[GF[ VFBZL lG6"I H[ T[ ;\A\lWT 5|FIMHGF lGIFDSzLGL 5]lQ8GL XZT[
5*P YI[, SFDULZLGL R]SJ6L YIF 5KL T[GL U]6JTF VYJF HyYFDF\ SF[. 1FlT HF[JF D/X[
TF[ V[Hg;LG[ N\0 SZJFDF\ VFJX[ VG[ H~ZL H6FI TF[ T[G[ V;]lRAwW SZJFDF\ VFJX[P
5(P SFDULZL JW] ;FZL ZLT[ Y. XS[ T[ DF8[ XZTF[ VG[ lGIDF[GF\ VY"W8G V\U[GF[ VAFlWT
CSS 5|FIMHGF lGIFDSzLGF[ ZC[X[ VG[ H[ T[ V[Hg;LG[ T[ A\WGSTF" ZC[X[P
5)P .HFZNFZ[ DMS,[, V[OP0LPVFZP SFDGL ZSDGF !@ CMJL HM.V[4 V[OP0LPVFZPGM
;DIUF/M ! JQF"GM CMJM HM.V[4 GF D\H]Z YI[, .HFZNFZGL V[OP0LPVFZPq.PV[DP0LP
V+[ YL D]ST ccZL,Lhcc SZJFDF\ VFJX[P
&_P .vV[OP0LPVFZP R,FJFDF\ VFJX[ GlC\4 VG[ V[OP0LPVFZPq.PV[DP0LP 5|YD 5[.HDF\
H6FjIF D]HAGF GFDGL CMJL HM.V[P
&!P 8[g0Z GM8L;DF\ lGWF"lZT SZ[, TFZLB[ VlGJFI" ;\HMUMGF SFZ6[ HM H[ T[ ;DI[ BM,L G
XSFI TM ALÒ TFZLB OF/JJFDF\ VFJX[P
&ZP jIlSTUT VF5[, ,FE CMI TM T[ SFDGL 5CM\R D[/JL ,[JFGL ZC[X[P
પ્ર જેકટન ુંુ નાિઃ WDC 2.O/02/2021-22કાુંચનધાટપ્ર જેકટ િાલકુ ઃ ઇેિા,ઇેિા
SFDGM SFDMGL WDC 2.0 C[9/ ZSD
S|D SFDGM C[0 UFDG]\ GFD SFDG]\ GFD
5|SFZ ;\bIF s,FBDF\f
1 H/;\HIGF SFDM 5FIFZ5F0F B[TT,FJ0L G\U 4
2 ;\Z1F6GF SFDM
5FIFZ5F0F lO<0 VFp8,[8 G\U 2
3 ;\Z1F6GF SFDM
5FIFZ5F0F U[A[IG :8=SRZ G\U 11
sV\S[ ~l5IF AFZ ,FB V[STF,L; CHFZ A;M GjJF6]\ 5]ZFf
5}ZS 0LP5LPVFZPJQF" o Z_Z5vZ&4 lJUTJFZ SFDMGL lJUT
S|D UFDG]\ ;J[" SFDGL TF\l+S D\H]ZLGL
SFDG]\ GFD ,FEFYL"G]\ GFD
G\P GFD G\AZ ;\bIF ZSD
1 5FIZ5F0F B[TT,FJ0L ZD[EF. A\0]EF. 5F0JL 115 1
2 5FIZ5F0F B[TT,FJ0L ,1D6EF. D,FZL UFlJT 106 1
3 5FIZ5F0F B[TT,FJ0L ;]Z[XEF. DMTLZFDEF. 5JFZ 67 1
4 5FIZ5F0F B[TT,FJ0L V[:IFEF. UM\0]EF. UJ/L 201 1
5 5FIZ5F0F U[A[IG :8=SRZ ;FD}lCS SMTZ 1
6 5FIZ5F0F U[A[IG :8=SRZ ;FD}lCS SMTZ 1
7 5FIZ5F0F U[A[IG :8=SRZ ;FD}lCS SMTZ 1
8 5FIZ5F0F U[A[IG :8=SRZ ;FD}lCS SMTZ 1
9 5FIZ5F0F U[A[IG :8=SRZ ;FD}lCS SMTZ 1
10 5FIZ5F0F U[A[IG :8=SRZ ;FD}lCS SMTZ 1
11 5FIZ5F0F U[A[IG :8=SRZ ;FD}lCS SMTZ 1
12 5FIZ5F0F U[A[IG :8=SRZ ;FD}lCS SMTZ 1
13 5FIZ5F0F U[A[IG :8=SRZ ;FD}lCS SMTZ 1
14 5FIZ5F0F U[A[IG :8=SRZ ;FD}lCS SMTZ 1
15 5FIZ5F0F U[A[IG :8=SRZ ;FD}lCS SMTZ 1
16 5FIZ5F0F lO<0 VFp8,[8 TFGFÒEF. ,FCG]EF. UFlJT 1
17 5FIZ5F0F lO<0 VFp8,[8 5|SFXEF. ZFD]EF. UJ/L 1
sV\S[ ~l5IF AFZ ,FB V[STF,L; CHFZ A;M GjJF6]\ 5]ZFf
8[g0Z V[,P! TZLS[ D?IF AFN .HFZNFZ[ ZH] SZJFGL lJUTP
:JrK VG[ ;]NŸ0 JF\RL XSFI T[JF :5Q8 V\U|[Ò S[5[8, V1FZMDF\ .HFZNFZ wJFZF GLR[ D]HAGF
5+SDF\ JS"VM0"Z D?IF AFN V[Hg;LV[ ,[8Z5[0 p5Z DFlCTL lNGoZ DF\ V+[GL SR[ZLV[
lC;FAL XFBFDF\ ZH] SZJFGL ZC[ K[P
.HFZNFZqV[Hg;LGM AFIM0[8F
VF 5+S ;FY[ s!f A[gS V[SFpg8 5F;A]S VYJF K[<,L A[gS :8[8D[g8GL h[ZM1F sZf
ÒPV[;P8LP ;8L"lOS[8 s#f ZÒ:8=[XG s$f 5FGSF0" SM5L ;lCql;SSF ;FY[ ZH] SZJLP
!P .HFZNFZG]\ GFD s5]Z[
ZP V[Hg;LG]\ GFD sW\WFG]\
#P ;ZGFD] D]PPPPPPPPPPPPPPPPPPPPP 5MP PPPPPPPPPPPPPP
O/LI] PPPPPPPPPPPPPPPPPPPP TFPPPPPPPPPPPPPP
ÒPPPPPPPPPPPPPPPPPPP 5LG SM0PPPPPPPPPPPPP
5P 5FGSF0" G\AZ
&P DMAF., G\AZ D]bI DMPG\P o !PPPPPPPPPPPPPPPPPPPPPPPPPPPP
V<8ZG[8 DMPG\Po ZP
PPPPPPPPPPPPPPPPPPPPPPPP
(P .HFZNFZqV[Hg;LG]\ H[ o
A[gSDF\ SZ\8 V[SFpg8
)P A[gS V[SFpg8 G\AZ o
VF.PV[OPV[;P ;LP
!!P VFWFZSF0" G\AZ o
TFZLB o ;lCql;SSF
8[g0Z V[,P! TZLS[ SFD 5}6" YIF AFN .HFZNFZ[ AL, ;FY[ ZH] SZJFGL lJUTP
s!f VF.P0LP JFZ vOM<0Z AGFJLv UFDJFZ4 SFDJFZ SFD X~4 RF,] SFD4 5}6" YI[,
SFDGM OM8MU|FO; OZÒIFT ÒP5LPV[;P ,MS[XG N[BFI T[ ZLT[ OM8MU|FO; ;MO8
SM5LDF\ VG[ CF0"SM5LDF\ V[D AgG[ 5|SFZ[ V+[ ZH] SZJFGF ZC[X[P
sZf SFDGF OM8MU|FO; A[J0FI G HFI T[G]\ wIFG ZFBJFG]\ ZC[X[4 H[GM VD, R]:T56[
s#f AL, ;FY[ OZÒIFT p5Z D]HAGM .HFZNFZ AFIM0[8F V+[GL SR[ZLDF\ lC;FAL
XFBFDF\ ZH] SZJFGF ZC[X[P
s$f jIlSTUT YI[, SFD[ VF5[, ;FWG ;CFI V\U[GL 5CM\R4 JM8ZX[0 ;lDlT VG[
.HFZNFZGL ;\I}ST ;lC YL D[/JL AL, ;FY[ ZH] SZJFGL ZC[X[P
Farmpond Activity No.
SR No. Descriptions Unit Rate Amount
Item No:- 2 Excavation for Foundationin in
all Sorts of soil including,Yellow,
Sandy,Gravelly Soil soft &Hard
Murrum,etc.dry condition including the 280.00 Cu.m 81.50
excaveted stuff in uniform layersin blanksor
1 as directed etc.Complete forlead up to1.0
Km.and all lifts.(By Machinery)
SOR( S.G.) N.W.R.W.S &K.DEPARTMENT.
Item No:- 2 Excavation for Foundationin soft
Rock including disposting the excaveted
stuff as and where directed etc.complete for
lead up to 1 k.m.and all lifts(By Machinery )
SOR( S.G.) N.W.R.W.S &K.DEPARTMENT.
Item No :- 3 Deta board (Bord 0.60m x
0.40m.)Angle40 mmx40mmx6mm 1.00 Nos. 2571.25
3 SOR( S.G.) N.W.R.W.S &K.DEPARTMENT.
P.P.Woven U.V.Staibilised fabric 220 GSM 676.00 Sq.m 86.29
Drawing Activity No.
Name of Activity : Gabian Structure
Qty. Particulars Rate Per Amount
Item No:- (1) Excavation for trialpits, trenches and
quarry expleration in all sorts of soil in cluding
yellow, sandy and gravelly soils, soft murrum in
luding is posing of the excavated stuff as and
where directed etc. complete without dewatering.
S.O.R. N.W.R.W.S & K DEPARTEMENT S.r. No.1 (a)
Item no : (2) Suplying and Laying trap Rubble
stone of UP to10 kg in weight for toe and core
filling including conveying and stacking to
required line m level slope section including all
leads and lifts. Conveyingmaterials from stacks
and laying etc complete.
S.O.R. N.W.R.W.S & K DEPARTEMENT Ch.No.
Item no :- (3) Gabion 1.00mx 1.00m x 0.60m P.P.
Woven 9 mm dia.(100 mmx 100 mm Mesh size)
S.O.R. N.W.R.W.S & K DEPARTEMENT Statement
Item no :-(4) Data board (Board 0.45mx
m,Angle 40 mmx 40mm x 6 mm)
1.00 S.O.R. N.W.R.W.S & K DEPARTEMENT Statement 1172.32 Nos.
Gabian Structure, Drawing Activity No.
Gabian Structure, Activity No.6
Qty. Particulars Rate Per Amount
Item No:- (1) Excavation for trialpits,
trenches and quarry expleration in all
sorts of soil in cluding yellow, sandy and
gravelly soils, soft murrum in luding is
posing of the excavated stuff as and
where directed etc. complete without
S.O.R. N.W.R.W.S & K DEPARTEMENT S.r.
Item no :( 2) Suplying and Laying trap
Rubble stone of 10 to 50 kg in weight for
toe and core filling including conveying
and stacking to required line m level slope
section including all leads and lifts.
Conveyingmaterials from stacks and
laying etc complete.
S.O.R. N.W.R.W.S & K DEPARTEMENT
Item no :- (3) Gabion 1.00mx 1.00m x
0.60m P.P. Woven 9 mm dia.(100 mmx
S.O.R. N.W.R.W.S & K DEPARTEMENT
Statement : 2S.r. No.298 Pg.No.77
Item no :-(4) Data board (Board 0.60mx
0.45 m,Angle 40 mmx 40mm x 6 mm)
1.00 S.O.R. N.W.R.W.S & K DEPARTEMENT 1172.32 Nos.
Statement : 2S.r. No.256 Pg.No.76
Gabian Structure, Drawing Activity No.6 Payarpada
Gabian Structure, Activity No.
Qty. Particulars Rate Per Amount
Item No:- (1) Excavation for trialpits,
trenches and quarry expleration in all sorts
of soil in cluding yellow, sandy and
gravelly soils, soft murrum in luding is
posing of the excavated stuff as and where
directed etc. complete without dewatering.
S.O.R. N.W.R.W.S & K DEPARTEMENT S.r.
Item no : (2) Suplying and Laying trap
Rubble stone of 10 to 50 kg in weight for
toe and core filling including conveying
and stacking to required line m level slope
section including all leads and lifts.
Conveyingmaterials from stacks and laying
S.O.R. N.W.R.W.S & K DEPARTEMENT
Item no :- (3) Gabion 1.00mx 1.00m x 0.60m
P.P. Woven 9 mm dia.(100 mmx 100 mm
S.O.R. N.W.R.W.S & K DEPARTEMENT
Statement : 2S.r. No.298 Pg.No.77
Item no :-(4) Data board (Board 0.60mx
m,Angle 40 mmx 40mm x 6 mm)
1.00 S.O.R. N.W.R.W.S & K DEPARTEMENT 1172.32 Nos.
Statement : 2S.r. No.256 Pg.No.76
Gabian Structure, Drawing Activity No.
Gabian Structure, Activity No.11
Qty. Particulars Rate Per Amount
Item No:- (1) Excavation for trialpits,
trenches and quarry expleration in all
sorts of soil in cluding yellow, sandy and
gravelly soils, soft murrum in luding is
posing of the excavated stuff as and
where directed etc. complete without
S.O.R. N.W.R.W.S & K DEPARTEMENT S.r.
Item no :( 2) Suplying and Laying trap
Rubble stone of 10 to 50 kg in weight for
toe and core filling including conveying
and stacking to required line m level slope
section including all leads and lifts.
Conveyingmaterials from stacks and
laying etc complete.
S.O.R. N.W.R.W.S & K DEPARTEMENT
Item no :- (3) Gabion 1.00mx 1.00m x
0.60m P.P. Woven 9 mm dia.(100 mmx
S.O.R. N.W.R.W.S & K DEPARTEMENT
Statement : 2S.r. No.298 Pg.No.77
Item no :-(4) Data board (Board 0.60mx
0.45 m,Angle 40 mmx 40mm x 6 mm)
1.00 S.O.R. N.W.R.W.S & K DEPARTEMENT 1172.32 Nos.
Statement : 2S.r. No.256 Pg.No.76
Gabian Structure, Drawing Activity No.11 Payarpada
Gabian Structure, Activity No.
Qty. Particulars Rate Per Amount
Item No:- (1) Excavation for trialpits,
trenches and quarry expleration in all sorts
of soil in cluding yellow, sandy and
gravelly soils, soft murrum in luding is
posing of the excavated stuff as and where
directed etc. complete without dewatering.
S.O.R. N.W.R.W.S & K DEPARTEMENT S.r.
Item no : (2) Suplying and Laying trap
Rubble stone of 10 to 50 kg in weight for
toe and core filling including conveying
and stacking to required line m level slope
section including all leads and lifts.
Conveyingmaterials from stacks and laying
S.O.R. N.W.R.W.S & K DEPARTEMENT
Item no :- (3) Gabion 1.00mx 1.00m x 0.60m
P.P. Woven 9 mm dia.(100 mmx 100 mm
S.O.R. N.W.R.W.S & K DEPARTEMENT
Statement : 2S.r. No.298 Pg.No.77
Item no :-(4) Data board (Board 0.60mx
m,Angle 40 mmx 40mm x 6 mm)
1.00 S.O.R. N.W.R.W.S & K DEPARTEMENT 1172.32 Nos.
Statement : 2S.r. No.256 Pg.No.76
Gabian Structure, Drawing Activity No. 12,13,14,15, Payarpada
Field Outlet Activity No.16, Payarpada
No Descriptions Qty.
Unit Rate Amount
Item No:- 1 Excavation for trial pits, trenches
and quarry explerationin all sorts of soil
including yellow, sandyan dgravellys oils, soft
murrum including disposing of the excavateds
1 tuffasandwheredirected etc. complete
without dewatering.
SOR N.W.R.W.S &K.DEPARTMENT.
(a) 0 to 1.50 meter.
Item No:- 2 Providing and laying
Plain/Reinforced cement concrete of
cement, sand and Metal (20 mm to 25 mm
size) in following Proporation liad and situ
including centering,shuttering
2 temping,Smoodh Finishing curing etc.
Complete as directed for all lead and
lift.(Manually with convertional Mixer )
SOR N.W.R.W.S &K.DEPARTMENT.
S.r. No. 18(A) Foundation(ii) Pg.No.
Item No:- 3 Providing and laying uncoarsed
rubble masonary in ordinary portland cement
mortar 1:5 proportion in foundation including
3 curing etc. complete for all lead and lifts.
SOR N.W.R.W.S &K.DEPARTMENT.
Item No:- 4 Providing cement plaster in
various thickness and proportion including
smooth finishing, curing, scaffolding etc.
4 complete for all lead and lifts as under.
SOR N.W.R.W.S &K.DEPARTMENT.
(i) 20 mm thick.
Item No:- 5 Marble Plate Takti (As per Market
Field Outlet, Drawing Activity No. 16 Payarpada
Field Outlet Activity No.17 Payarpada
No Descriptions Qty.
Unit Rate Amount
Item No:- 1 Excavation for trial pits, trenches and
quarry explerationin all sorts of soil including
yellow, sandyan dgravellys oils, soft murrum
including disposing of the excavateds 4.27 Cu.mt 134.20
tuffasandwheredirected etc. complete without
SOR N.W.R.W.S &K.DEPARTMENT.
(a) 0 to 1.50 meter.
Item No:- 2 Providing and laying
Plain/Reinforced cement concrete of cement,
sand and Metal (20 mm to 25 mm size) in
following Proporation liad and situ including
centering,shuttering temping,Smoodh Finishing
2 curing etc. Complete as directed for all lead and
lift.(Manually with convertional Mixer )
SOR N.W.R.W.S &K.DEPARTMENT.
S.r. No. 18(A) Foundation(ii) Pg.No.
Item No:- 3 Providing and laying uncoarsed
rubble masonary in ordinary portland cement
mortar 1:5 proportion in foundation including
3 curing etc. complete for all lead and lifts.
SOR N.W.R.W.S &K.DEPARTMENT.
Item No:- 4 Providing cement plaster in various
thickness and proportion including smooth
finishing, curing, scaffolding etc. complete
4 for all lead and lifts as under.
SOR N.W.R.W.S &K.DEPARTMENT.
(i) 20 mm thick.
5 Item No:- 5 Marble Plate Takti (As per Market Rate) 1.00 Nos 800.00
Drawing Activity No. 17 Field Outlet, Payarpada
Technical Specification
Excavation in all sort of soil strata and formations including depositing the unuseful
excavated stuff as and where directed incl. sorting & stacking useful materials as
required and up to lead of 200mt. and all lifts etc. complete including dewatering.
Specifications and requirement laid down in general technical specification for EARTH
WORK shall apply.
The scope of this item of work includes back filling by quarrying, transporting the
suitable materials from borrow areas or suitable excavated stuff with all lead, all lift and
laying, spreading in specified layer with necessary dressing, finishing, ramming and
consolidation by hand tamping etc. complete.
Specifications laid down in general technical specification for EARTH WORK shall apply.
Suitable materials shall be stacked in piles and same shall only be spread after approval
of department. Spreading in specified layer can be performed by suitable machinery or
by manually. Embankment material shall be free from all perishable or unsuitable
material; if found shall be removed during embankment operation and embankment
shall be cleaned. The bond between old and new earth work/embankment shall be
carried out by loosened the old embankment surface by means plough, ripper or other
suitable method or providing steps as per site condition.
The work shall have to carry out with best workmanship manner with the use of modern
earth work machineries as specified in general technical specifications.
MEARSUREMENT AND PAYMENT:
The payment of this item shall be made on cubic meter basis of the completed work in
all respect. The mode of arriving at quantities payable under this item shall be governed
as mention in general technical specification for earth work.
Providing and laying position” NOMINAL MIX” cement concrete using cement, sand and
H. B. METAL by mass and machine mix for PCC including necessary form works
compaction ramming, curring as directed with all lead & lift etc. complete for
Foundation Concrete other general purpose 2(a) M-10 Metal size 40 to 63mm.
i)CEMENT: Specification m-2 of specification of material section shall apply. ii) WATER:
Specification m-1 of specification of material section shall apply. iii) SAND: Specification
m-3 of specification of material section shall apply. Sand shall be used after proper
screening only.
iv) STONE: Specification m-5 of material section shall apply.
General technical specifications for concrete works shall apply here also. Concrete mix
shall be “NOMINAL MIX” or as decided by engineer in charge, and is to be design by
preliminary tests in the laboratory. The proportions for ingredients shall be by mass
only except for water. The grade of concrete shall be M-7.5 (1:4:8) with M.S.A. 40 or
The scope of work under this item includes doing C.C. at various work locations and
compartments as classified under the item including providing and supplying all
materials labours and use of equipment machinery with providing, erecting and
dismantling of necessary formwork and centring.
The scope of work also incl. laying of concrete in position as directed by machinery or
by manually with compaction by means of needle of surface vibrator together with
finishing the expose surface of concrete work to obtain dense and compact surface,
curing for a specified period etc.
Specifications for workmanship laid down in general technical specifications for
concrete works shall apply here also. The workability of the concrete mix shall be
controlled by maintaining a w/c ratio that is bound to give a concrete mix which is just
sufficiently wet to be placed and compacted without difficulty with the means specified.
MODE OF MEASUREMENT AND PAYMENT:
The rate shall be for a unit of one cubic meter. The consolidated cubical contents of
concrete work as specified in item shall be measured. The concrete laid in excess of
section shown on drawing or as directed shall not be measured. No deduction shall be
i) Ends of beams, girders, joist, steps, posts, etc. of similar materials up to 500 sq.cm. In
section. ii) Opening up to 0.1 sq.mt. in area.
The rate includes cost of all materials, labour, tools and plants required for mixing,
placing in position, vibrating and compacting, finishing, as directed, curing and other
incidental expenses for producing concrete of specified strength. The rate includes cost
Prov. & Laying in position cement concrete using cement, sand and crushed metal
coarse aggregate by mass and machine mix for PCC/RCC including necessary formworks
compaction by vibrator, curing as directed with all lead & lift etc. complete. (Excluding
cost of steel) FOR BODY WALL, APRON, TRAINING WALL, SIDE WALL, SPLAY WALL,
KEY WALL, CUT OF WALL ETC. 4/c Concrete Grade M-15 and MSA-40mm.
i) CEMENT: Specification m-2 of material section shall apply.
ii) WATER: Specification m-1 of material section shall apply.
iii) FINE AGGREGATE: Specification m-3 of material section shall apply.
iv) COARSE AGGREGATE: Specification m-4 of material section shall apply.
General technical specifications for concrete works shall apply here also. Concrete mix
shall be "nominal mix" or design mix as decided by Eng. I/c. and is to be design by
preliminary tests in the laboratory. The proportions for ingredients shall be by mass
only except for water. The grade of concrete shall be M-15 (1:2:4) with size of aggregate
The scope of work under this item incl. doing C.C/ R.C.C. at various work locations and
compartments as classified under the item incl. providing & supplying all materials,
labours and use of equipment machinery with providing erecting and dismantling of
necessary formwork and centeing. The scope of work also incl. laying of concrete in
position as directed by machinery or by manually with compaction by means of needle
of surface vibrator together with finishing the expose surface of concrete work to obtain
dense and compact surface, curing for a specified period of 28 days.
Specifications for workmanship laid down in general technical specifications for
concrete works shall apply here also. The workability of the concrete mix shall be
controlled by maintaining a w/c ratio that is bound to give a concrete mix which is just
sufficiently wet to be placed and compacted without difficulty with the means specified.
MODE OF MEASUREMENT AND PAYMENT:
The rate shall be for a unit of one cubic meter. The consolidated cubical contents of
concrete work as specified in item shall be measured. The concrete laid in excess of
section shown on drawing or as directed shall not be measured.
The rate includes cost of all materials, labour, tools and plants required for mixing,
placing in position, vibrating and compacting, finishing, as directed, curing and other
incidental expenses for producing concrete of specified strength. The rate includes cost
Providing and fixing in position white marble plate of size 45x45x1.8 cm incl. engraving
the letters as per drawing/as directed etc. complete.
MARBLE PLATE:Marble shall be of good quality white of fine grain.
GENERAL: SCOPE OF WORK: WORKMANSHIP:
The scope of item includes providing, engraving letters and fixing marble plate of size
45 X 45x1.80 cm as and where directed with all lead & lift. The work shall be carried out
with best workman like manner. The marble shall be of good quality, fine grained, hard,
uniform and homogeneous in texture. The marble shall have crystalline grain and free
from any defects and cracks. The front face shall be of machine polished one and rear
side shall be rough to provide good bond to cement mortar. The letters of required size,
font and lipi shall be engraved by best artisan as directed by engineer in charge.
The wall surface shall be covered with 10mm thick rough cement mortar 1:3 plaster and
allowed to harden. If it is to be fixed on already plastered surface, then, plaster shall be
roughened by chisel. The rates are inclusive of cement plaster & cement mortar / slurry.
The back of marble plate shall be floated with cement slurry and fixed to the surface by
gentle tapping with wooden hammer. All the four edges shall be flushed with vata. The
work shall be kept wet for seven days.
MODE OF MEASUREMENT AND PAYMENT:
The work shall be paid on number basis of completed work.
GENERAL TECHNICAL SPECIFICATION
1.1 Water shall not he salty or brackish and shall be clean,
reasonably clear from objectionable quantities of silt and
traces of oil and injurious alkalies, salts, organic matter and
other deleterious material which will either weaken the mortar
of concrete or cause efflorescence’s or attack the steel in R.C.C.
the PH value of water shall generally be not less than
Container for transport, storage and handling of water shall be
clean and only potable water shall be use in the work.
1.2 Water for curing, mortar, concrete or masonry should not be too acidic
or too alkaline. It shall be free of elements which significantly affect the
hydration, reaction or otherwise interfere with the hardening of
concrete during curing of those which produce objectionable
stains or other unsightly deposits on concrete or mortar surface.
1.3 Hard and bitter water shall not be used for curing.
1.4 Potable water will be generally found suitable for preparation and
curing of mortar or concrete.
1.5 Testing of water shall be done at Government at his own cost if
directed by Engineer-in-charge.
2.1 The contractor shall have to make his own arrangement to procure the
cement bearing I. S. I. (B.I.S.) mark, directly from the manufacturer or
from the authorized dealers of such manufacturer. For the verification
of such purchases the contractors shall have to produce the bills of
manufacturer or its authorized dealer along with testing details of the
Engineer-in-charge. The cement brought at the site by the Contractor
shall be tested prior to its use in work. For testing of cement one
sample for every lot (one time stacking of cement bag on site of work)
of cement shall be drawn & tested for necessary qualitative
tests, as per I. S. 12269-1987. The cement not satisfying the
criteria, as per I. S. shall be rejected& hence work done by
contractor shall have to remove from the site immediately at his own risk
The cement shall O.P.C. type and shall conform to I.S.I. specifications
cement shall be fresh and stacked at site as directed by Engineer-in-
charge of the work on a dump proof floor and in a weather proof
shed. It shall be stacked on work site to prevent deterioration as
specified, in storage specification of the cement marketing company,
cement which is market from authorized dealer.
2.2 As the cement is available in bags, the contractor shall provide at the
site of work, satisfactory for not less than three months’ average
Consumption on works and shall keep the cement stored in manner
that shall satisfy the Engineer. The arrangement of storage and
utilization shall be such as to ensure the utilization of cement in the
order of its arrival at the storage and the Contractor shall
maintain satisfactory records, which would any time show the dates
of receipt and processed utilization of cement laying in store at site.
2.3 Engineer-ln-charge shall at all time, have an access to the stores at
site and shall authority to check and examine the method of storage,
accounting and security provided by the Contractor. The contractor shall
comply with instruction. The Contractor shall further at all times, satisfy
the Engineer for his demand for the production of records or books or
submission of returns and Performa of other proofs that may be
demanded in order to prove that the cement brought to site being used.
The Contractor shall, at all times keep his records up-to-date to enable
the Engineer to apply such checks as he may desire to impose.
3.1 Sand be natural sand, clean, well graded, hard strong durable and gritty
particles five from injurious amounts of dust clay, kankar, soft or flaky
particles shale, alkali, salts, organic matter, loom, mica or other
substance and shall be got approved from the Engineer-in-charge.
The sand shall not contain more than 5 % of silt as determined by field
test. If necessary, the sand shall be washed to make it clean.
3.2 The fineness modules of sand shall not be less than 2.6 and exceed
3.3 All the fine aggregates shall confirm to I. S.383-1970 as directed by
Engineer-in-charge.
3.4 Sand for use on work shall natural river sand or crushed sand of
crushed gravel of their mixture in specified prescription. The sand shall
consist of hard, dense, uncoated siliceous grains of such fragment and
shall be free from the injurious of amounts of dust, lumps, soft of flaky
particlesshales, alkali, organic matter, looms, mica and deleterious
3.5 IMPURITIES:
3.5.1 Materials passing on No. 200 B.S.S. Sieve 5 by weight for crushed
gravel for sand, 10 % by weight for crushed rock.
Shale 1 percent by weight
Coal 1 percent by weight
Clay lumps 1 percent by weight
Other impurities 2 percent by weight
3.5.2 Deleterious substance such as Alkali, Mika coated grain and soft flaky
particles shall not be used.
3.5.3 The sum of the percentage of all deleterious substances in any cases
shall not exceed 5 percentages by the weight. Sand be free from organic
The sand shall he graded screen analysis shall confirm one of
gradation limit grading zone I to IV specification in I.S. 383-1970 vide
Table No. Mentioned below.
FINE AGGREGATE TABLE NO.
Percentage Passing
Grading Grading Grading Grading
Zone-I Zone-II Zone-III Zone-IV
3.7 Fineness modules
The sand shall have fineness modulus ranging between 2.6 to 3.2 the
fineness modules being computed by adding cumulative percentage of
sand retained on six standard sieves ranging front 4.75 mm 150 micron
incisive & dividing the sum by
The contractor shall have to make his own arrangement to produce
the steel bearing ISI marks directly from the manufacturer or from
authorized dealers of such manufacturer. For verification of such
purchased, the contractor shall have to produce the bill if manufacturer
of authorized dealer along with testing details to the Engineer-in-charge.
In case of doubt of site by the contractor shall be tested by the
Department as per concrete IS Mild Steel bar reinforcement for R. C. C.
work shall confirm to IS 32-1982 and shall be tested quality. In case of
doubt after conducting the necessary qualitative test as per IS 456-
1978. Department will accept the steel.
The steel not satisfying the criteria as per I.S. shall be rejected and
contractor shall have to remove from the immediately at his risk and
5.0 COARSE AGGREGATE
5.1 Course aggregate shall be machine crushed stones of black trap or
equivalent and be hard, strong, dense, durable, clean and free from skin
and coaling which may likely to prevent proper adhesion of mortar.
Coarse aggregate shall consist of uncoated hard, strong, dense and
durable of locally available stone for 1 :4:8 and crushed black trap
stone for 1: 1½: 3, 1:2:4 and 1:3:6. (In the event of some special
work, the hand broken coarseaggregate may have to use)
5.2 The aggregate shall generally he cubical in shape. Unless special stones
of particular quarries are mentioned, aggregates shall be machine
crushed (Maud broken when specified) from the best black trap of
equivalent hard stone as approved by Engineer-in-charge. Aggregate
shall have no deleterious reaction with cement. The size of the
coarse aggregate for plain cement concrete and ordinary
reinforced cement shall generally be as per the table given below.
Percentage passing for single size aggregate of Percentage passing for graded
normal size aggregate to normal size
Note: This percentage may be varied somewhat by Engineer-in-charge
when considered necessary for obtaining better density and strength
5.3 However exact grading required to produce a dense concrete of
specified strength and desired workability shall be decided
by Engineer-in-charge by carrying out be carried accordingly.
5.4 IMPURITIES:
It shall be free from disintegrated stone soft flaky and elongated,
particles,salt alkali,vegetable,matter and other deleterious
materials in such quantities as to reduce strength and durability
of concrete or to attach steelreinforcement it shall be
generally simply with the I.S. 383-1970. Some of the
important requirements of coarse aggregate as specified in I.S. 38.-
1970 issummarized below
The amount of deleterious materials in coarse aggregate
shall not exceed the percentage of limits given below in Table
No.2. When tested by method described inI.S.2383-1963 and the
sum of percentage of all deleterious materials (except mica) shall
not exceed the limit of 5 percentages.
MATERIALS MAXIMUM PERCENTAGE LIMITS BY
(I) DELETERIOUS
Coal and Lignite 1.00
Clay Lumps 1.00
Soft Fragment 3.00 --
Materials passing 75 microns I.S.
CLAUSE DESCRIBED IN APPPAND1X OF I.S. 383-1970
When required by Engineer-in-charge coarse aggregated shall also be
subject to some of following test as he consider necessary in accordance with the
procedure specified in I. S.383-1970.
5.1 The stone shall he of the sped lied variety such as Granite / Quartz / or any
oilier types of good hard locally available stone obtain from quarries as
approved by the Engineer-in-charge. The stone shall be obtained only
from the approval quarry and shall be hard, sound, durable and other
structural defect to like cavities, cracks, sand, holes, flows, injurious veins,
patches of loose or soft material etc. and weathered portion and other
structural defect of imperfection tending to affect their soundness and
strength. The thickness of the stone shall not be less than 15 Cm. The stone
with round surface shall not be used. The stone shall be such as will not
absorb more than 5 % of water. Stone with weathered skin shall not be used.
5.2 The sample of the stone to be used shall be got approval from Engineer-
in-charge before the work started. Testing of stone shall be done at
contractor’s cost if required as specified by Engineer-in-charge.
(B) WORK PROCEDURE
1.0 ACCURACY OF LINES & GRADES:
The various works shall to be clone true to line, level and grade. The periodical
checking of these by the Government staff does not absolve the contractor of
his responsibility, regarding their accuracy. In case of any deviation or
discrepancy in lines, level or grade, the Contractor shall correct the
discrepancy at his own cost and without any compensation for the
additional work if any involved. Wherever such a discrepancy is found to arise
at the junction of work of different contractor, the relative liability to set right
their respective discrepancy shall be fixed by the Engineer whose decision
shall be final and binding to the rectify the contractor concerned. The Engineer
shall, further have the authority if needed to rectify the discrepancies and
recover the costs from the contractor or contractors according to
proportions, as he may consider reasonable.
2.0 TESTING OF MATERIALS:
2.1 All materials before being incorporated in the work shall be inspected and if
necessarytested before approved by the Engineer-ln-charge.
Any work on which such materials are used without prior inspection and without
approval or written permission of the Engineer-ln-charge is liable to
considered as unauthorized, defective and not acceptable.
2.2 The Contractor shall supply all the materials required to be tested and also
make good at his costs as may be directed by Engineer-ln-charge for his
satisfaction. An authorized representative of the contractor shall remain
present at the time when the samples or course etc. are taken and shall
authenticate the facts, if so required. If the contractor’s agent fails to
remain present as aforesaid samples of cores etc., taken by the Engineer
or his representative shall be considered to be authentic. The contractor shall
however, be informed of the details of such samples and cores etc., having
2.3 The various materials and cubes shall be tested periodically as per
requirement at the Government Approved Laboratory or Q.C. sub division
or GERI and the results given thereby shall be considered correct
and authentic to the contractor. The Contractor shall be given
access to operations and tests that may be carried out aforesaid to
that he may satisfy himself regarding the procedure and
methods adopted, it shall be the contractor’s responsibility to
produce on the work, materials and finished items to the
standard based on the standards based on the laboratory design
2.4 The methods of sampling and testing and the procedures and
standard shall be as laid down by the Engineer-ln-charge from time to
2.5 SAMPLES AND TESTS:
Test of materials and also on the work as laid down will be made by
Government.The contractor shall arrange for collecting and
forwarding the samples to Laboratory as his own cost as may be
required by the Engineer-ln-charge and if so directed shall not lake
use or incorporate in the work any materials represented by any of the
samples, until the required tests have made and materials accepted.
The testing changes for all construction materials shall be borne by
the contractor.
3.0 DEWATERING AND DIVERSION WHERE NEEDED:
(1) The rates also include arrangement for the diversion of water during
construction in the fair weather as well in the monsoon during the ending
period of contract. No payment shall be made for any part of work
materials washed away or damage during the monsoon or other
period and it shall have to be made good by the contractor at his own
cost. It is the responsibility of the contractor to make good repair any
Government property materials to utilized for the present work or
completed part of present work damaged during construction period.
(2) The rate is also inclusive of all labour materials and plants necessary
for the purpose of dewatering, and division as required without any
separate payment in any items of this work.
4.0 CLEARING THE SITE OF WORK:
Trees and Dismantled materials shall be the property of the
Government and shall be carted and stacked at suitable places as
directed by Engineer-ln-charge, and all waste materials decided as
such by the Engineer-ln-charge and All waste materials decided as such
by the proposed site so as not to interface with construction operation.
All clearing operations as above shall be considered as included in
the items of excavation embankment etc. and no extra payment shall
he made for clearing the site work.
5.0 EXCAVATION:
5.1 EXCAVATION IN ALL SOILS INCLUDING HARD MURRUM:
This shall include all excavation done in strata other than rock such
as soil marine clay, chickle, sill, sand, gravel, soft murrum stiff clay,
kankar, hard murrum and other similar materials, all kinds of
disintegrated rock or shale, indulated clay, sand or conglomerate
interspersed with boulder larger than one cubic feet sand or and less
than one cubic yard, which do not need blasting and can be removed
with pick bar, shovel, chisel etc. with same difficulty.
5.2 EXCAVATION IN SOFT ROCK:
This shall include all excavation done in strata which is rock but does not
need blasting and can be removed with pick bar and the shovel. But which
does not come under the category of strata covered under. 2.1 above.
5.3 EXCAVATION IN HARD ROCK:
This shall include all excavation done occurring in masses which can be
removed by blasting. This shall also include rock require to be removed
by chiselling where blasting is not permitted. More fact that blasting has
been restored will not qualify for excavation in hard rock.
5.4 THE DECISION:
The decision of the Engineer-in charge for classification of the strata in
case of dispute shall be final and binding to the contractor.
5.5 UTILIZATION OF EXCAVATED STUFF:
The excavated material as found as able in other items of work shall be
the property of the Government and shall be separated by the
contractor as directed be Engineer-in-charge without any extra
Pay line will be as per specified in hereinafter or the actual line of
the excavation, whichever is less.
The pay line be as per the excavation for the foundation shall be
carried out in line, level as per plan. Design or as directed by Engineer-
Overcuts, beyond specified pay of excavation carried out by the
contractor for any purpose or reason, unless by directed by Engineer-
in-charge shall be at the cost of the contractor. Refilling this overcuts
if required shall be contractor or masonry and that shall be at that cost
of the contractor.
Slips in excavation shall be avoided by means of any necessary shorting
and strutting required during excavation. No extra payment shall be
made for any such operation. However, if any slips occur on account
of any reason, Government shall not be responsible for loss of lives
and other damage done on account of such slips or any other reason.
The excavation affected by slips etc. shall promptly restored to stability.
No claim shall be entertained for such slips and their consequences.
The excavation trenches field up due to monsoon or any other reason
shall be cleared by the contractor directed by Engineer-in-charge
without any extra cost to government.
5.8 DISPOSAL OF EXCAVATED STUFF:
All spoil of excavation shall be removed from foundation and deposited
by the contractor as per instruction of Engineer-in-charge. The
deposited of spoil stuff shall be carefully planned so, is obstruct traffic
lines required for transport of the construction materials of flow of the
water and shall be dumped beyond AHFL line or lead 100 Mt. otherwise
specified andsufficiently away from the edges of excavation to avoid
danger in stability, to permit ample space for lorry installation or
lifting and pumping devices, slaking construction materials etc. All
these operations are included in corresponding item of excavation
and no extra payment shall he made for this.
5.9 LEAD AND LIFT:
Excavation material would be deposited within lead and lift as
specified in the item and in spoil or canal hank in particular section
or at a space as directed by Engineer-in-charge.
6.0 CEMENT MORTAR:
6.1 Water: Water shall conform to specification (A)1.0 of this chapter.
6.2 Cement: Cement shall conform to specification (A) 2.0 of this chapter.
6.3 Sand: Sand shall conform to specification (A) 3.0 of this chapter.
6.4 Proportion of mix : Cement and sand be mixed to specified
proportion, sand being measured by measuring boxes. The
proportion of cement will be by volume on the basis of 50 Kg. /Bag
of cement bring equal to 0.034 Cu. M. the mortar may be hand mixed
or machine mixed as directed.
6.5 PREPARATION OF MORTAR:
Hand mixed mortar:
Cement and sand in the specified proportions shall be thoroughly
mixed dry on a clean impervious platform by turning over at least
times or more till a homogenous mixture of uniform colour is
obtained. Mixed platform shall be also arranged that no extraneous
material shall gel mixed with mortar shall flow out. While mixing, the
water shall be gradually added and thoroughly mixed to form a stiff
plastic mass of uniform colour so that each particle of sand shall be
completely covered with a film of wet cement. The water cement
ration shall be adopted as directed. The hand mixing shall be carried
out with prior permission of Executive Engineer subject to use of
10 % additional quantity of cement.
In machine mix mortar:
The mortar shall be mixed in mechanical mixer. The mixing shall be
continued until there uniform distribution of materials and
homogenous, uniform colour of mix is obtained. The mixing shall be
done for at least two minutes after required quantities of cement, sand
and water places in the drum. The mixing time will be increased if
required uniformity and consistency is not obtained in mix.
6.6 The mortar so prepared shall be used within 30 minutes of adding
water. Only such quality of mortar shall be prepared as can be used
within 30 minutes.
7.1 SCOPE OF WORK:
The work covered by this chapter consist furnishing nil materials,
equipment and labour for the manufacture, transport, placing, finishing
& curing of concrete in structure included in these section and
performing all functions necessary and ancillary there toetc. complete.
The item of concrete will have to be split up to several item according
to the class of concrete to be used and its location and will be
measured and paid for accordingly. The general section described
here in after shall however, in relevance, apply to all concrete items.
7.2 COMPOSITION:
Concrete shall compose of cement, fine aggregate (natural sand)
machine crushed coarse aggregate (or Hand broken rock) or natural
and screened gravel, and water, all well mixed in proper proportion and
brought to the power consistency. Whenever so ordered by the
Engineer-in-charge, admixtures shall be added as stated in the special
conditions. The exact proportion of each such type of aggregate will
be determined and adjusted from time to time, on mechanical analysis
of the aggregate.
The specification for cement, fine sand, coarse aggregate and water
shall be strictly adhered to as directed above in material section.
Aggregate size in different mix shall be as follow.
MIX COURSE AGGREGATE
Forms to confine the concrete and shape it to required lines shall be
used wherever necessary. The forms shall have sufficient strength and
rigidity to hold concrete and to with stand the pressure or ramming and
vibration without deflection from the prescribed lines, the more so when
the concrete vibrated. The surface of all forms in contact with concrete
shall be clean, rigid water right and smooth Suitable devices shall be
used to hold corners, adjacent ends and edges of panels or other forms
together in accurate alignment. Forms shall be so constructed as to be
removed in section without moving or damaging surface of concrete.
Bolls & rods shall preferably be used for internal ties and they shall be so
cut as to remain 1" (25 mm) behind the surface.Unless or forms to
round of or level the edges of the concrete. Temporary cleaning and
inspection immediately before depositing the concrete. The design of
cantering and form work shall be got approves before erection by the
Engineer-in-charge.
(a) At any stage, any grooves, set back etc. if ordered to be provided
by Engineer-in-charge shall be provided as per the instruction with
no extra cost. Any angle B.S.J., M.S. bars or any steel piece required to
be kept projecting out of the concrete surface or any structural member
like pipe, nuts, rods etc. required to be kept inside concrete. The same
shall be placed in position in concrete, in line and level as per instruction
of Engineer-in-charge and centring done accordingly with no extra
costof the labour and the materials for cantering.
(b) Subsequent connecting work of block left out earlier for any
reasonsshall bedone to required line and level. Such concreting shall
have to be done havingthe progress of the work as per instruction
of the Engineer-in- charge.
7.4.2 RE-USE OF FORMS ETC.:
Forms to be sued more than once shall be maintained in
serviceable condition and shall be thoroughly cleaned and
smoothened before being re-used. Where metal sheets arc used for
lining forms, the steel shall be placed and maintained on form
with the minimum amount of wrinkles, humps or other
imperfections. The use of steel metal to correct imperfection in
surface that will be permanently exposed to view shall not be
permitted. All forms shall be checked for shape.
7.4.3 ERECTION AND REMOVAL OF FORMS:
Before placing concrete surface all the forms shall be oiled with
suitable non-staining of such as raw linseed oil so as to prevent
slicking of concrete to facilitate the removal of forms. In case of wood
forms oil should be capable of penetrating the wood, and of
remaining sufficiently oily to eliminate sticking or preventing
absorption of water and consequent warping.
The oil shall be covering the form fully & evenly without excess over
drip. Care shall be taken to prevent oil from getting on surface of
construction joints and reinforcement bars. Special care shall be
taken for narrow grooves. So as to prevent swelling of the forms
and consequent damage to concrete prior to or during the
removal of forms. Immediately before concrete is placed
precaution shall be taken to see that all forms are in proper
alignment and this angles and are thoroughly secure and tight.
Where forms for continuous surface are placed in successive units
the forms shall fit lightly over completed surface, so as to prevent
leakage of mortar from concrete and to maintain accurate
alignment of the surface.
MACHINE MIXING:
The concrete shall be composed of water, cement, fine
aggregate and course aggregates. Each material being approved by
the Engineer-in-charge prior of the mixing.
The proportion of cement, sand and aggregate mixed for
concrete shall be as per grade of the concrete (i.e. 1:4:8, 1:3:6, 1:2:4
etc.) by weight or by volume as directed by Engineer-in-charge.
When volume batching the volume of 1 bag cement will be
considered as 0.034 cum. The wooden measuring boxes should be
field in loose with the materials. The ingredient of concrete shall
be properly mixed in mixers, designed, so as topositively ensured
uniform, distribution of all the component material throughout the
mass at the end of the mixing period. The mixing of each batch shall
continue for about one and half to two minutes, or as found best
practice, after all materials expect, the full amount of water is in the
mixer. The minimum mixing period specified above assumed proper
control of the speed of the rotation of mixer and of the introduction
of the materials including water. The mixing time shall be
increased when charging operation sails to produce the required
uniformity of composition and consistency within the batch and from
batch inclusive mixing, requiring additional water to preserve the
required concrete consistency, shall be avoided, if in the mixing, the
changing operations are such that the required uniformity of the
concrete is obtain in shorter mixing time than that of the minimum
specified without disturbing the specified needed workability, the
mixing time may be shortened under orders of the Engineer-in-
charge. The first batch of concrete materials, placed in the mixer in
each working period shall contain sufficient excess of cement, sand
and water at the rate of 10 % to coat the inside of drum in order
that the required mortar content of the mix is not reduced. No extra
claim for this shall be considered by the department.
The following general principles shall be followed in preparation of mixing.
(a) The ingredients shall be fed into the mixer simultaneously.
(b) A portion of water (between 5 to 10 p. c.) shall proceed and an equal
quantity shall follow on introduction of other materials. The
remaining water shall be added uniformly and simultaneously with
the other materials.
(c) Care shall be taken that mixing of concrete in the mixer shall be
(d) The mixer shall not be loaded in excess of its rated capacity.
(e) The minimum mixing speed shall not be less than 4 RPM and
peripheral speed of the drum shall be not more than 225 ft./minutes.
(f) The Executive Engineer shall permit the hand mixing and in that
case, the extra 10 % cement shall he added for which no extra payment
HAND MIXING SHALL BE DONE AS FOLLOWS:
Required quantity of cement should be spread on watertight platform
of steel plate, through in uniform layer on lop of measured quantity of
the fine aggregate, so as to have proportion required for the concrete
volume by. Cement and sand shall then be thoroughly mixed, by turning
over four times to be mix uniform colour, this mixer shall be spread evenly
over required quantity of coarse aggregate meta, so as to have
required proportion by volume and mixed dry by running three times till a
homogeneous mix is obtained. Measured quantity of water shall he
added slowly and entire mass turned over. The turning shall he continued
till homogenous Uniform mix is obtained. The hand mixing shall be
permitted by the Executive Engineer and in that case. The
extra 10 % cement shall be added for which no extra payment shall be
The patch shall be placed in position within 20 minutes of its discharge from
the mixer. Any batch remaining unutilized for more than 20 minutes shall
not be allowed to be used in work.
7.6 PLACING OF CONCRETE:
The contractor shall keep Engineer-in-charge informed as to when the
placing of concrete will be performed. Unless instruction is waived in
specified case as directed in writing from Engineer-in-charge. Placing of
concrete shall be performed only in the presence of the authorized
representative of the Engineer-in charge.
Concrete shall be placed only in locations where authorized and no concrete
or mortar shall be placed unit the form works, preparation of surface &
necessary clean up been done & approved. The rock surface rigid masonry
or concrete surface upon or against which concrete is to be placed shall be
concrete surface with reference to relevant specification starting masonry
over old masonry. Before starting the placing of concrete it should be made
certain that the transportation and placing equipment are cleaned and in
proper repair and the equipment along with operation staff is arranged to
deliver the concrete to the final position without any delay or the
objectionable segregation. If concrete is to be placed at night adequate
lighting arrangement as may be directed by the Engineer-in-Charge shall be
made. The method and equipment used for transporting and placing the
concrete of the required consistency in to the work without the
objectionable, porosity or the excessive loss of the workability. All concrete
shall be placed directly in its final position within 30 minutes after being
mixed. Any concrete, which has become so stiff that proper placing cannot
be assured without re-tempering shall he wasted. Excessive segregation
from what so ever cause shall he minimized in handling and operation by
avoiding or controlling the lateral movement of the concrete as in dumping at
an angle depositing continuously at one point and allowing the concrete to How.
Concrete shall not be dropped from height exceeding 2 meter and free fall
should he kept to minimum. Al! surface of form and metal work that have
become in crushed with dried mortar or grout from concrete previously
placed shall be cleaned of all such mortar or grout before surrounding or
adjacent concrete is placed.
The bottom of the foundation and super-structure shall be trimmed and
levelled before concrete is placed. All loose and soft materials shall remove. The
foundation bed shall be thoroughly cleaned and then the concrete shall be
placed in position. Continuous, horizontal layers of maximum thickness of
cms. Each shall be placed and shall be compacted by wooden or iron rammers
Properly mixed concrete shall be placed in position within 30 minutes after the
water is added to the mixer. The concrete shall be laid gently, so as not permit any
segregation of aggregate. It shall than be compacted with tight wooden template
or vibrator till the slurry is formed at surface and compacted thoroughly, so that
no voids or cavity left and dense concrete is obtained, over vibration shall .be
avoided. Concrete shall be protected from direct heat of sum, it shall be covered
after few hours of initial of selling of cement, with gunny bags or socking and shall
be cured by watering for period of 14 days.
When concrete is to be resumed after lapse of time, the surface on which
further concrete is to be done shall be roughened and scrubbed with brush to
remove laitance and shall be swept clean thoroughly.
If the area to be concreted is to be dewatered before laying concrete the
contractor shall make arrangement for pumping out or bailing out stagnant or
[lowing water from foundation, so as to allow concrete operations to be done in
dry conditions without an^ trouble in almost all the stages till concrete has finally
set in position and nothing shall be paid for this dewatering and pumping or
bailing out water.
The concrete shall be thoroughly compacted by means of wooden or iron rammers
during placing till it causes the mortar to cream up and compacted thoroughly so
that no voids or cavities are in the concrete it is thoroughly dense concrete.
After removal of form work in due time, the concrete surface shall-be made free
from honey combing, air holes or any other defects shall be finished in line and
level with the cement.
The work, after its initial set shall be protected from excessive heat of sun or rain
etc. by covering wet gunny bags or by shallow pools of water as directed by the
Engineer in-charge.
Flooding with water by making mud walls 7.50 cm. high shall cure if or covering
with wet sand or earth and kept damp continuously for 14 days.
In case the contractor fails to make satisfactory arrangements for curing on any
day within curing period, department at the risk and cost of the contractor shall
he the same and this amount shall he recovered from the contractor from his next
7.7 TEST FOR CEMENT CONCRETE;
(a) The compression test of concrete shall be on 6"(15 cm.) cubes whenever
applicable. Concrete for test cube shall be taken immediately, it has been deposited
Whenever this is not possible, samples shall be taken as the concrete id being
placed, to obtain the representative sample. A sufficient number of samples each
enough to make one test cube shall be taken at different points, so that the test
cube made from them will be representative of the concrete placed in that position
of that structures selected for test. One set of test cube per every 50 cum of the
concrete deposited shall be taken. The set of six cubes shall be tested for
compressive strength at 7 days and 28 days.
(b) After proper curing of prescribed period this shall be tested as per I. S. I. and
should give compressive strength of not less than,
a.70 kg/sq. cm. for 7 days and 100 kg/sq.cm. for 28 days for a nominal mix of 1:3:6
b.100 kg/sq.cm. for 7 days and 150 kg/sq.cm. for 28 days for a nominal mix of
c.140kg/sq.cm.for 7 days and 200kg/sq.cm. for 28 days for a nominal mix of
(c) The exact proportion in which the different ingredients are to be used for
pans of the work, shall be determined by the Engineer from time to time, during,
the progress of the work and as analysed and the test are made of samples of
aggregates and resulting concrete. No extra payment or deduction shall be made
in the unit rate for variation in gradation and proportion of coarse and
fineaggregate for maintaining gradation as suggested by the Engineer for
achieving required strength of concrete.
(d) Slight variation in the nominal mix shall be made, it makes the concrete
more, dense in order to make the concrete impervious.
(e) At least 80% of the cubes tested shall give the minimum specified strength. No
cubes shall however, give a strength less than 80 % of the specified,
strength, if the lest shows that the concrete blocks result below the
specified strength, such bad quality of concrete shall be removed and
redone by contractor al his own cost.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SOGAND NAMU.pdf
Tender Annexure _FP GS_Payarpada-_Purak DPR_WDC 2.O_2025-26.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .