Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹17.5 L+₹90,939.50 (5.47%)Rejected-Finance HIMACHAL PRADESH HP | L2 | Rejected-Finance L2 | |
| 3 | L3₹20.9 L+₹4.3 L (25.6%)Rejected-Finance R O V P O DHALOH TEHSIL GHUMARWIN DISTT BILASPUR H P | BILASPUR | HIMACHAL PRADESH | 174001 | L3 | Rejected-Finance L3 | |
| 4 | L4₹20.9 L+₹4.3 L (25.6%)Rejected-Finance CHOKHNA TEHSIL GHUMARWIN DISTT BILASPUR HP | L4 | Rejected-Finance L4 | |
| 5 | L5₹20.9 L+₹4.3 L (26.1%)Rejected-Finance CHOKHNA TEHSIL GHUMARWIN DISTT BILASPUR HP | BILASPUR | HIMACHAL PRADESH | 174001 | L5 | Rejected-Finance L5 |
Tender Value
₹20.2 L
EMD Value
₹38,000
Closing Date
23 Feb 2024, 10:35 amClosed
Executive Engineer
HP.PWD Ghumarwin Division
Hume pipe culvert 900mm dia and P/L stone soling and C.C at R.D 0/300 to 0/800
2024_PWD_86208_1
13282-88
Open Tender
Civil Works - Roads
Item Rate
90 days
Ghumarwi
please refer tender doucments
8 documents required · 8 mandatory
₹500
₹38,000
HP.PWD Ghumarwin Division
29 Apr 2024
16 Feb 2024
23 Feb 2024
16 Feb 2024
23 Feb 2024
16 Feb 2024
22 Feb 2024
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains not exceeding 1.5 m (one point five metre) in width or 10 sqm (ten square metre) on plan, including dressing of sides and ramming of bottoms, lift upto any lead .All kinds of soil as per direction of Engineer-In-Charge with in all leads and lifts and other incidentals. The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same
Providing and laying cement concrete 1:3:6 (one cement : three sand : six graded stone) aggregate 20 mm (twenty millimetre) nominal size with minimum cement contents 250 kg (Two hundred fifty kilogram) per cubic metre and curring complete . including cost of form work for plain /reinforce concrete in retaining walls, breast wall and like structure as per drawing and MORD tecnical specification 2014 Clause 800 and 1200 including carriage of material with in all leads and lifts ,shoring and shuttering and curring complete including pumping or bailing out water (surface and sub soil water) up to all depth and any quantum of water including cleaning of slush which may arise out during dewatering and carriage of machinery, material ,tools equipment safety measures and other incidentals as per the direction of Engineer-in Charge. The rate includes, octroi, royality Malkhana , Toll tax , Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Providing and Laying concrete 1:6:12 (one cement : six sand : twelve crushed stone aggregate) 40mm (forty milimetre) for plain/reinforced concrete in open foundations complete as per drawing and technical specification clauses 802, 803, 1202 and 1203 as per direction of Engineer-In-Charge with in all leads and lifts and other incidentals. The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Providing and Laying cement concrete 1:5:10 nominal mix ( One Cement : five Sand : Ten graded crushed stone aggregrate.) 40mm ( forty milimetre) nominal size with minimum cement contents 130 kg (One hundred thirty kilogram) per cubic metre and curring complete . including cost of form work for plain /reinforce concrete in retaining walls, breast wall as per drawing and MORD tecnical specification 2014 Clause 800 and 1200 including carriage of material with in all leads and lifts ,shoring and shuttering and curring complete including pumping or bailing out water (surface and sub soil water) up to all depth and any quantum of water including cleaning of slush which may arise out during dewatering and carriage of machinery, material ,tools equipment safety measures and other incidentals as per the direction of Engineer-in Charge.The rate includes, octroi, royality Malkhana , Toll tax , Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Providing weep holes in brick masonary /stone masonary / plain reinforced concrete abutment, wing wall, return wall with 100 mm (one hundred millimetre). dia PVC pipe white in colour extending through the full with of the structures with slop of 1(V): 20(H) towards drawing face complete as per HPPWD specification clauses 614,709,1204.3.7 .as per direction of Engineer-In-Charge.The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Providing and laying reinforced cement concrete hume pipe NP2 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 (One Cement: two Sand) but excluding cost of excavation, protection work, back filling ,concrete and masonary work in head walls and parapet as per MORD Technical Specification 2014 Clause 1108. 900mm dia ( Nine hundred millimetre) dia including entire carriage of materials , within all leads and lifts and other incidentals as per direction of Engineer-in-charge. The rate includes octroi, royality, Malkana toll tax, Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Stone soling properly hand-packed filling interstices with Kharanja stone and consolidating with power road roller to the requested gradient and comber including spreading watering and rolling of binding materials moorum or earth etc. complete as per HP.PWD specification. 100 mm spread thickness (finished work including materials and labour)The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering - All work up to plinth level. 1:1.5 :3(One cement : One point five coarse sand : three graded stone aggregate 20 mm (Twenty milimetre) nominal size).The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Babli Gautam
ROHAN KARTIK MAHAJAN
Amar Singh
Surjeet Singh
HUKAM CHAND
Narender
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .