| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.5 LRejected-Finance | L1 | Rejected-Finance Govt has not yet approved the above sanction amount. Firm period has expired the contractor has not willing to proceed the work and requested to release the EMD. |
| Sl No | Description | Qty | Unit | MUHAMMED AFSAL L1 |
|---|---|---|---|---|
| 1.00Reconstruction of Culvert | ||||
| 1.00 | 2.5.2.A:Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately Bituminous course - By Mechanical Means | 13.35 | cum | 684.57 ₹9,139.01 Lowest |
| 1.00 | OD257224/2025-2026: Engaging mazdoor for clearing drains , lifting slabs, other works directed by the engineer in charge etc. completed | 12 | each | 1,465.57 ₹17,586.84 Lowest |
| 1.00 | OD257244/2025-2026:Arranging tipper /truck for removal of debris , excavated waste etc away from site(driver and fuel charges included) | 17 | hour | 1,065.1 ₹18,106.7 Lowest |
| 1.00 | OD257245/2025-2026:Hire and running charges of hydraulic excavator (driver and fuel charges included) for removing waste in culverts and drains | 15 | hour | 1,988.17 ₹29,822.55 Lowest |
| 1.00 | 2.4.2.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Prestressed / reinforced cement concrete grade M-20 & above - By Mechanical Means | 40.05 | cum | 2,017.33 ₹80,794.07 Lowest |
| 1.01 | 2.4.2.A:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres <br> Cement Concrete Grade M-15 & M-20 - By Mechanical Means <br> | 5.76 | cum | 1,007.71 ₹5,804.41 Lowest |
| 1.01 | 2.4.4.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Stone Masonry - Rubble stone masonry in cement mortar. | 2.49 | cum | 1,042.3 ₹2,595.33 Lowest |
| 1.01 | 12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means | 447.3 | cum | 102.62 ₹45,901.93 Lowest |
| 1.01 | OD214480/2025-2026:D.R packing for the bed using the deptl rubble obtained from the existing abutment | 69.12 | cum | 2,451.02 ₹1,69,414.5 Lowest |
Tender Value
₹37.5 L
EMD Value
₹50,000
Closing Date
17 Mar 2026, 5:00 pmClosed
Executive Engineer
O/o Executive Engineer, PWD NH Division, Kollam
NH 66 Traffic Safety Work Reconstruction of Culvert at Madannada Ch 499 400 and Polayathodu Ch 498 800 DSoR 2021
2025_PWD_823453_6
WD/NH/TR/923/2024_5_2_2/1
Open Tender
Civil Works - Highways
Item Rate
180 days
Kollam
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
₹50,000
Yes
1 Aug 2026
9 Mar 2026
19 Mar 2026
9 Mar 2026
17 Mar 2026
9 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Reconstruction of Culvert | |||||
| 1.001 | 2.5.2.A:Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately Bituminous course - By Mechanical Means | 1 | cum | - | - |
| 1.002 | OD257224/2025-2026: Engaging mazdoor for clearing drains , lifting slabs, other works directed by the engineer in charge etc. completed | - | each | - | - |
| 1.003 | OD257244/2025-2026:Arranging tipper /truck for removal of debris , excavated waste etc away from site(driver and fuel charges included) | - | hour | - | - |
| 1.004 | OD257245/2025-2026:Hire and running charges of hydraulic excavator (driver and fuel charges included) for removing waste in culverts and drains | - | hour | - | - |
| 1.005 | 2.4.2.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Prestressed / reinforced cement concrete grade M-20 & above - By Mechanical Means | 1 | cum | - | - |
| 1.006 | 2.4.2.A:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres <br> Cement Concrete Grade M-15 & M-20 - By Mechanical Means <br> | 1 | cum | - | - |
| 1.007 | 2.4.4.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Stone Masonry - Rubble stone masonry in cement mortar. | - | cum | - | - |
| 1.008 | 12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means | - | cum | - | - |
| 1.009 | OD214480/2025-2026:D.R packing for the bed using the deptl rubble obtained from the existing abutment | - | cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1428221.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
NIT.pdf
Additional Documents • 0.03 MB
SBD.pdf
Tender Documents • 3.57 MB
BOQ_1428221.xls
BOQ • 0.31 MB
date.pdf
PDF • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .