Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAccepted-AOC | ₹2.2 Cr | L1 | Accepted-AOC below rate |
| 2 | L2₹2.3 CrRejected-AOC N A | ₹2.3 Cr | L2 | Rejected-AOC above rate |
| Sl No | Description | Qty | Unit | V.POOBATHI & CO L2 | K VENKATACHALAM L1 |
|---|---|---|---|---|---|
| 1.00 | ChippingofconcreteandrougheningthesurfaceandClearingawayfromthesiteetccompleteasper standard specification Complete as per PWD SOR 2025-26, page no.30 Unique Code W-0036 | 4,605 | M3 | 44 ₹2.0 L | 43 ₹2.0 L |
| 2.00 | Vibrated Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site form work and centering soft water labour charges for mixing, transporting, vibrating and compacting finishing and curing concrete, working at heights, hire charges forHire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for CC Pavement | 461 | M2 | 7,150 ₹33.0 L | 6,972.5 ₹32.1 L |
| 3.00 | ProvidingandfixingBitumenPadforExpansionjointinbetweenpavementslabsto12mmthickandfixedasshowninthedrawingincludingcostandconveyenceofexpansionjointsincludingshalimarpad and joint sealent etc, complete as per standard specification | 93 | M3 | 491 ₹45,663 | 478.5 ₹44,500.50 |
| 4.00 | Preparing the Existing surface to laying the road to Proper Gradient and remove the loose soil without damage the Water Supply and other Pipe lines. The Rate inclusive of all charges such as Earth work and remove the same away from the site etc, complete as per standard specifications. | 577 | M3 | 136 ₹78,472 | 132.5 ₹76,452.50 |
| 5.00 | Providing of Granular Sub base using Grade I materials of table 400 -1 of Morth with minimum CBR 30 spreading in uniform layers with motor grader on prepared surface, mix in by palce method at OMC and compacting with Vibratory Roller to achieve the desired density including all labourcharges etc, complete as per technical specification and as directed by the departmental officers. Morth - Rev V No. 111,112,401,900 | 346 | M3 | 1,932 ₹6.7 L | 1,883.5 ₹6.5 L |
| 6.00 | Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. | 231 | M3 | 2,496 ₹5.8 L | 2,433.5 ₹5.6 L |
| 7.00 | Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion (SS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev-5 Specifications | 2,306 | M2 | 89 ₹2.1 L | 86.9 ₹2.0 L |
| 8.00 | Providing and laying tack coat of 2.5 kgs/10 sqm over the WMM surface treated with binder using 2.5 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev-5 Specifications | 2,306 | M2 | 21 ₹48,426 | 20 ₹46,120 |
| 9.00 | Advance Patch work 13.20mm Providing Advancve Patch work using 50mm consolidated Thickness by using 1 m3 of 13.20mm IRC Metal with 44kg of Bittumen per 1 m3 of Metal For Pre Mixing For existing surface advance Patch work including cost and conveyance of materials to the work site and stacking them to the departmental metric guage for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 60-70KN power roller for premix carpet and seal coat seperately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet, including labour charges for spreading seal coat seperately over premix carpet etc. including higher charges and fuel charges for , bitumen boiler and all other tools and plant employed etc. complete as per of MoRTH Rev - V Specifications | 280 | M3 | 4,944 ₹13.8 L | 4,821 ₹13.5 L |
| 10.00 | Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications | 27,125.5 | M3 | 30 ₹8.1 L | 28.9 ₹7.8 L |
Updated dates
Tender Value
₹2.7 Cr
EMD Value
₹2.7 L
Closing Date
28 Jan 2026, 3:00 pmClosed
Commissioner
Azad Road, Karur
Karur Corporation_TURIP 2025-26_Improvement of BT Road in Kamadenu nagar Main Road W-E, Saibaba Nagar East -I, Pukara theru 2nd E-W, Anna nagar kurukku theru, in Ward No.18,19,38,40,41 and 42 in Karur City Municipal Corporation. Zone 3 Package 7
2026_MAWS_642792_7
E1/8427/2025
Open Tender
Civil Works
90 days
KCMC
Please refer Tender Documents
3 documents required · 3 mandatory
₹10,000
₹2.7 L
Karur
7 Apr 2026
13 Jan 2026
28 Jan 2026
13 Jan 2026
28 Jan 2026
13 Jan 2026
13 Jan 2026 - 28 Jan 2026
14 Jan 2026
ChippingofconcreteandrougheningthesurfaceandClearingawayfromthesiteetccompleteasper standard specification Complete as per PWD SOR 2025-26, page no.30 Unique Code W-0036
Vibrated Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site form work and centering soft water labour charges for mixing, transporting, vibrating and compacting finishing and curing concrete, working at heights, hire charges forHire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for CC Pavement
ProvidingandfixingBitumenPadforExpansionjointinbetweenpavementslabsto12mmthickandfixedasshowninthedrawingincludingcostandconveyenceofexpansionjointsincludingshalimarpad and joint sealent etc, complete as per standard specification
Preparing the Existing surface to laying the road to Proper Gradient and remove the loose soil without damage the Water Supply and other Pipe lines. The Rate inclusive of all charges such as Earth work and remove the same away from the site etc, complete as per standard specifications.
Providing of Granular Sub base using Grade I materials of table 400 -1 of Morth with minimum CBR 30 spreading in uniform layers with motor grader on prepared surface, mix in by palce method at OMC and compacting with Vibratory Roller to achieve the desired density including all labourcharges etc, complete as per technical specification and as directed by the departmental officers. Morth - Rev V No. 111,112,401,900
Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications.
Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion (SS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev-5 Specifications
Providing and laying tack coat of 2.5 kgs/10 sqm over the WMM surface treated with binder using 2.5 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev-5 Specifications
Advance Patch work 13.20mm Providing Advancve Patch work using 50mm consolidated Thickness by using 1 m3 of 13.20mm IRC Metal with 44kg of Bittumen per 1 m3 of Metal For Pre Mixing For existing surface advance Patch work including cost and conveyance of materials to the work site and stacking them to the departmental metric guage for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 60-70KN power roller for premix carpet and seal coat seperately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet, including labour charges for spreading seal coat seperately over premix carpet etc. including higher charges and fuel charges for , bitumen boiler and all other tools and plant employed etc. complete as per of MoRTH Rev - V Specifications
Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications
Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24 cum of 26.50-13.20mm, 0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm & below and with 53.20 kgs of VG30 bitumen for premixing per 10 sqm including cost and conveyance of all materilas to CMP site including labour for attending to paver at site etc., including hire charges and fuel charges for 20-30 CMP with bitumen boiler tipper trucks , Paver finisher , Vibratory / pneumatic rollers and all other tools and plant required , including fuel and all other tools and plant required , including fuel and other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH
Providing and laying Bituminous concrete to 30/40mm thick using 0.13 cum of 19.00-9.50 mm graded metal and 0.17 cum of 9.50-2.36 mm graded metal and 0.26 cum of 2.36 mm & below metal with 47.28 kgs of 60/70 bitumen & 3.02Kg of Plastic waste (Total-50.30 kg) and for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 40mm / 30mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc., including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks, paver finisher, Vibratory rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 507 of MORTH Rev-5 specifications.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
techsummary_770495.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
BID7U.pdf
Tender Documents • 0.26 MB
BOQ_770495.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid