| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 CrAdmitted-Finance | -22.79% | ₹1.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.7 Cr+₹29.1 L (20.7%)Admitted-Finance | -6.78% | ₹1.7 Cr+₹29.1 L (20.7%) | L2 | Admitted-Finance |
| 3 | L3₹1.7 Cr+₹32.6 L (23.2%)Admitted-Finance | -4.86% | ₹1.7 Cr+₹32.6 L (23.2%) | L3 | Admitted-Finance |
| 4 | L4₹1.8 Cr+₹38.8 L (27.6%)Admitted-Finance | -1.50% | ₹1.8 Cr+₹38.8 L (27.6%) | L4 | Admitted-Finance |
| 5 | L5₹1.8 Cr+₹39.5 L (28.1%)Admitted-Finance | -1.11% | ₹1.8 Cr+₹39.5 L (28.1%) | L5 | Admitted-Finance |
Tender Value
₹1.8 Cr
EMD Value
₹4.3 L
Closing Date
25 May 2026, 5:00 pmClosed
GM-CIVIL
Main Administrative Building Sector-6 Noida
M/o Drain (Raising, Covering of Main Drain and Repair of Interlocking tiles along with Sector 70 and 71 on Kailash Road) Noida
2026_NOIDA_1146910_1
33/GM/SM(WC-05)/2026-27
Open Tender
Civil Works
Fixed-rate
180 days
NOIDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,310
NOIDA
₹4.3 L
30 Jul 2026
8 May 2026
26 May 2026
8 May 2026
25 May 2026
8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates
and similar works | 1,202 | kg | 92.34 | ₹1,10,992.68 |
| 2 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 10,849 | kg | 82.81 | ₹8,98,405.69 |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses,
plinth and string courses etc. | 568 | sqm | 335.55 | ₹1,90,592.4 |
| 4 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum.Excess/less cement used as per design mix is payable/recoverable separately). All works upto plinth level | 87 | cum | 7,912.32 | ₹6,88,371.84 |
| 5 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in over area ( exceeding 30cm in depth, 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.. All kinds of soil. The contrector has to detect different utilites like sewer line water supply line elecctric cable telephone cable gas pipe line etc. using utility detecting machine before start of excavetion and shall start excavetion only after getting permission of Engineer -in Charge . | 420 | cum | 136 | ₹57,120 |
| 6 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | 3,975 | sqm | 50 | ₹1,98,750 |
| 7 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: 6.1.1 Cement mortar 1:4 (1 cement : 4 coarse sand) | 95 | cum | 5,214.8 | ₹4,95,406 |
| 8 | 12 mm cement plaster of mix : 1:4 (1 cement: 4 coarse sand ) | 1,103 | sqm | 176.77 | ₹1,94,977.31 |
| 9 | Neat cement punning | 1,103 | sqm | 39.13 | ₹43,160.39 |
| 10 | Laying old cement cocrete interlocking paver blocks of any design/ shape laid in required line, level, curvature, colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineerin-charge. (Old CC paver blocks shall be supplied by the department free of cost) | 1,590 | sqm | 241.95 | ₹3,84,700.5 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
BOQ_2144908.xls
BOQ • 0.29 MB
Capability.xls
Additional Documents • 0.04 MB
TD.pdf
Tender Documents • 12.94 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .