Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹40.2 L+₹3.8 L (10.3%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | JABEER.U L2 | Sinil Jose A L1 |
|---|---|---|---|---|---|
| 1.00 | Welding by gas or electric plant including transportation of plant at site etc. complete. | 5,400 | Cm | 70 ₹3,78,000 | 4.04 ₹21,816 Lowest |
| 2.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means
over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 15.12 | m3 | 400 ₹6,048 | 245.25 ₹3,708.18 Lowest |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 15.12 | m3 | 8,900 ₹1,34,568 Lowest | 8,965.04 ₹1,35,551.4 |
| 4.00 | Providing and fixing bolts including nuts and washers complete. Net Total 119.250kg @164.04/kg | 119.25 | Kg | 150 ₹17,887.5 Lowest | 167.32 ₹19,952.91 |
| 5.00 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed
work, including cutting, hoisting, fixing in position and applying a priming coat of
approved steel primer all complete. | 4,576.88 | Kg | 160 ₹7,32,300 | 141.53 ₹6,47,765.12 Lowest |
| 6.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means
over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)
including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil. | 128 | Hr | 1,800 ₹2,30,400 | 1,703.48 ₹2,18,045.44 Lowest |
| 7.00 | Painting with synthetic enamel paint of approved brand and manufacture of required
colour to give an even shade :One or more coats on old work | 22,106.25 | m2 | 105 ₹23,21,156.25 Lowest | 110.43 ₹24,41,193.19 |
| 8.00 | Applying priming coat:With ready mixed red oxide zinc chromate primer of approved
brand and manufacture on steel galvanised iron /steel works | 2,229 | m2 | 90 ₹2,00,610 | 70.16 ₹1,56,386.64 Lowest |
Tender Value
₹40 L
EMD Value
₹50,000
Closing Date
18 Sept 2026, 6:00 pmClosed
Deputy Conservator of Forests and Wildlife Warden
Wayanad Wildlife Division Sulthan Bathery P O Wayanad Dist. Kerala Pin 673592
MAINTENANCE OF RAIL FENCING UNDER KUPPADY FOREST STATION IN KURICHIAT RANGE
2026_FD_865779_2
W6-26689/2026
Open Tender
Civil Works - Others
Item Rate
Sulthan Bathery
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,500
Yes
₹50,000
Yes
23 Sept 2026
10 Sept 2026
21 Sept 2026
10 Sept 2026
18 Sept 2026
10 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Welding by gas or electric plant including transportation of plant at site etc. complete. | 5,400 | Cm | - | - |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means
over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 15.12 | m3 | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 15.12 | m3 | - | - |
| 4 | Providing and fixing bolts including nuts and washers complete. Net Total 119.250kg @164.04/kg | 119.25 | Kg | - | - |
| 5 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed
work, including cutting, hoisting, fixing in position and applying a priming coat of
approved steel primer all complete. | 4,576.88 | Kg | - | - |
| 6 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means
over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)
including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil. | 128 | Hr | - | - |
| 7 | Painting with synthetic enamel paint of approved brand and manufacture of required
colour to give an even shade :One or more coats on old work | 22,106.25 | m2 | - | - |
| 8 | Applying priming coat:With ready mixed red oxide zinc chromate primer of approved
brand and manufacture on steel galvanised iron /steel works | 2,229 | m2 | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BOQ_1471911.xls
BOQ • 0.27 MB
DOC.pdf
Tender Documents • 1.13 MB
ep.pdf
Other Document • 0.11 MB
preagreement_2026.pdf
Other Document • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .