Tender Value
₹3.7 Cr
EMD Value
₹7.4 L
Closing Date
3 Oct 2026, 4:00 pm7d left
Xen RnB Division Kargil
Office of the Executive Engineer RnB Division Kargil
Construction of Playground at Kako Shilikchey Kargil. Under SDP
2026_PWD_19566_1
E tender 36 of 2026-27 PW RnB Division 2nd Kargil
Open Tender
Civil Works - Buildings
Percentage
240 days
Kargil
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,700
Xen RnB Division Kargil
₹7.4 L
16 Sept 2026
16 Sept 2026
5 Oct 2026
16 Sept 2026
3 Oct 2026
16 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. | |||||
| 1.01 | ALL KINDS OF SOIL 30% | 2,117.8 | Cum | 202.8 | ₹4,29,489.71 |
| 1.02 | ORDINARY ROCK 30% | 2,117.8 | Cum | 373.54 | ₹7,91,082.77 |
| 1.03 | HARD ROCK(BP) 40% | 2,823.73 | Cum | 1,065.88 | ₹30,09,759.98 |
| 2Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: | |||||
| 2.01 | ALL KINDS OF SOIL 40% | 306.95 | Cum | 270.59 | ₹83,056.79 |
| 2.02 | ORDINARY ROCK 40% | 306.95 | Cum | 490.88 | ₹1,50,674.24 |
| 2.03 | HARD ROCK(BP) 20% | 153.47 | Cum | 1,183.23 | ₹1,81,590.31 |
| 3 | Filling available excavated earth (excluding rock) in trenches plinth, sides of foundation etc in layer not exceeding 20cm in depth consolidating each deposited layer by ramming and watering, lead upto 50cm and lead up to 50 m and lift upto 1.5 mtr. | 1,123.37 | cum | 214.46 | ₹2,40,918.41 |
| 4 | Backfilling Dumping stone excluding cost of stones in Horizontal on level | 1,976.61 | cum | 226.41 | ₹4,47,524.89 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
BOQ_46305.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .