Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
18 Jul 2026, 6:00 pm
Addl. Chief Engineer (P), DGVCL, Corporate Office
Supply, installation, commissioning and testing of a Load Break Switch (LBS) for a DTR rating of up to 200 KVA
121538
DGVCL/SP/2455/S.I.T.C of 11 KV Load Break Switch (LBS)
Open
Electrical Goods/Equipment
Surat
22 documents required · 22 mandatory
₹8,850
Yes
DGVCL, Surat
₹1.2 L
Yes
30 Oct 2024
30 Oct 2024
20 Jul 2026
30 Oct 2024
18 Jul 2026
30 Oct 2024
documents, as mentioned in Schedule-A (given here under), should be uploaded in online
electronic form. Bidder has to pay Tender fee & EMD (up to Rs. 3 Lac) by
RTGS/NEFT/Online.
If the EMD amount is more than Rs. 3 Lac, it should be paid either by RTGS/NEFT/Online
or Demand Draft or Banker’s Cheque or Pay Order or Bank Guarantee Otherwise, it should
be paid in either in cash (up to 10,000/- only) at Cash counter of corporate office, DGVCL
during working days between 10:30 A.M. to 04:00 P.M. before the due date and time for
submission of tender or by RTGS/NEFT/Online.
All bidders, in respect of tender items must have valid vendor registration with the GUVNL
or its subsidiary companies viz. DGVCL/ MGVCL/ UGVCL/ PGVCL/ GETCO/GSECL prior to the
date of opening of technical bid of the tender. However, if the bidder is not having valid
vendor registration and has applied for new vendor registration or renewal of the same
prior to the date of publication of Tender in the Newspaper, the self-attested
photocopy of money receipt for payment of vendor registration charges must be uploaded in
online electronic form at preliminary stage. Such bidders must have to produce valid
vendor registration certificate before opening of price bid otherwise their bid will
be rejected and their price bids will not be opened.
However, the process of tender shall not be delayed by the Company merely because of
vendor application of a bidder is in process.
1] It is mandatory for all bidders to upload scanned copies of original (Notarized/Self-
Attested copies of original as specified in tender document) documents in online
electronic forms (e-tendering) in scheduled time with bid and physical documents not
2] Bidders have to upload their tender/s documents in online electronic forms (e-
tendering) on http://tender.nprocure.com
Tender Last Date
Tender No. Item Description Fee of On Line
Supply, installation,
commissioning and 8850.00 26.11.2024 27.11.2024
Tender No.: DGVCL/SP/2455/
testing of a Load (Incl. At
S.I.T.C of 11 KV Load Break Up to
Break Switch (LBS) for 18%
Switch (LBS) 11:00 Hrs.
a DTR rating of up to GST) 18:00Hrs.
Note: Bidders should be in touch with the above websites for information regarding
revision/ corrigendum/Amendment in tender till due date of online submission and
thereafter. No separate information shall be sent in this regards.
Addl. Chief Engineer (P)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2455_NIT.pdf
2455_Load Break Switch tech specification.pdf
2455_Tender Document LBS.pdf
CTC and Check list.pdf
2455-Corrigendum-1.pdf
2455-Corrigendum-2.pdf
2455-Corrigendum-3.pdf
2455-Corrigendum-4.pdf
2455-Corrigendum-5.pdf
2455-Corrigendum-6.pdf
2455-Corrigendum-7.pdf
2455-Corrigendum-8.pdf
2455-Corrigendum-9.pdf
2455-Corrigendum-10.pdf
2455-Corrigendum-11.pdf
2455-Corrigendum-12.pdf
2455-Corrigendum-13.pdf
Corrigendum-14.pdf
2455-Corrigendum-15.pdf
2455-Corrigendum-16.pdf
2455-Corrigendum-21.pdf
CORRIGENDUM
2455-Corrigendum-15.pdf
CORRIGENDUM
2455-Corrigendum-5.pdf
CORRIGENDUM
2455-Corrigendum-11.pdf
CORRIGENDUM
2455-Corrigendum-17.pdf
CORRIGENDUM
2455-Corrigendum-4.pdf
CORRIGENDUM
2455-Corrigendum-3.pdf
CORRIGENDUM
2455-Corrigendum-1.pdf
CORRIGENDUM
2455-Corrigendum-2.pdf
CORRIGENDUM
2455-Corrigendum-19.pdf
CORRIGENDUM
2455-Corrigendum-13.pdf
CORRIGENDUM
2455-Corrigendum-18.pdf
CORRIGENDUM
2455-Corrigendum-7.pdf
CORRIGENDUM
2455_NIT.pdf
CORRIGENDUM
Corrigendum-14.pdf
CORRIGENDUM
2455-Corrigendum-20.pdf
CORRIGENDUM
CTC and Check list.pdf
CORRIGENDUM
2455-Corrigendum-16.pdf
CORRIGENDUM
2455_Tender Document LBS.pdf
CORRIGENDUM
2455_Load Break Switch tech specification.pdf
CORRIGENDUM
2455-Corrigendum-8.pdf
CORRIGENDUM
2455-Corrigendum-10.pdf
CORRIGENDUM
2455-Corrigendum-6.pdf
CORRIGENDUM
2455-Corrigendum-12.pdf
CORRIGENDUM
2455-Corrigendum-9.pdf
CORRIGENDUM
2455-Corrigendum-15.pdf
CORRIGENDUM
2455-Corrigendum-5.pdf
CORRIGENDUM
2455-Corrigendum-11.pdf
CORRIGENDUM
2455-Corrigendum-17.pdf
CORRIGENDUM
2455-Corrigendum-4.pdf
CORRIGENDUM
2455-Corrigendum-3.pdf
CORRIGENDUM
2455-Corrigendum-1.pdf
CORRIGENDUM
2455-Corrigendum-2.pdf
CORRIGENDUM
2455-Corrigendum-19.pdf
CORRIGENDUM
2455-Corrigendum-13.pdf
CORRIGENDUM
2455-Corrigendum-18.pdf
CORRIGENDUM
2455-Corrigendum-7.pdf
CORRIGENDUM
2455_NIT.pdf
CORRIGENDUM
Corrigendum-14.pdf
CORRIGENDUM
CTC and Check list.pdf
CORRIGENDUM
2455-Corrigendum-16.pdf
CORRIGENDUM
2455_Tender Document LBS.pdf
CORRIGENDUM
2455_Load Break Switch tech specification.pdf
CORRIGENDUM
2455-Corrigendum-8.pdf
CORRIGENDUM
2455-Corrigendum-10.pdf
CORRIGENDUM
2455-Corrigendum-6.pdf
CORRIGENDUM
2455-Corrigendum-12.pdf
CORRIGENDUM
2455-Corrigendum-9.pdf
CORRIGENDUM
2455-Corrigendum-15.pdf
CORRIGENDUM
2455-Corrigendum-5.pdf
CORRIGENDUM
2455-Corrigendum-11.pdf
CORRIGENDUM
2455-Corrigendum-17.pdf
CORRIGENDUM
2455-Corrigendum-4.pdf
CORRIGENDUM
2455-Corrigendum-3.pdf
CORRIGENDUM
2455-Corrigendum-1.pdf
CORRIGENDUM
2455-Corrigendum-2.pdf
CORRIGENDUM
2455-Corrigendum-13.pdf
CORRIGENDUM
2455-Corrigendum-18.pdf
CORRIGENDUM
2455-Corrigendum-7.pdf
CORRIGENDUM
2455_NIT.pdf
CORRIGENDUM
Corrigendum-14.pdf
CORRIGENDUM
CTC and Check list.pdf
CORRIGENDUM
2455-Corrigendum-16.pdf
CORRIGENDUM
2455_Tender Document LBS.pdf
CORRIGENDUM
2455_Load Break Switch tech specification.pdf
CORRIGENDUM
2455-Corrigendum-8.pdf
CORRIGENDUM
2455-Corrigendum-10.pdf
CORRIGENDUM
2455-Corrigendum-6.pdf
CORRIGENDUM
2455-Corrigendum-12.pdf
CORRIGENDUM
2455-Corrigendum-9.pdf
CORRIGENDUM
2455-Corrigendum-15.pdf
CORRIGENDUM
2455-Corrigendum-5.pdf
CORRIGENDUM
2455-Corrigendum-11.pdf
CORRIGENDUM
2455-Corrigendum-17.pdf
CORRIGENDUM
2455-Corrigendum-4.pdf
CORRIGENDUM
2455-Corrigendum-3.pdf
CORRIGENDUM
2455-Corrigendum-1.pdf
CORRIGENDUM
2455-Corrigendum-2.pdf
CORRIGENDUM
2455-Corrigendum-13.pdf
CORRIGENDUM
2455-Corrigendum-7.pdf
CORRIGENDUM
2455_NIT.pdf
CORRIGENDUM
Corrigendum-14.pdf
CORRIGENDUM
CTC and Check list.pdf
CORRIGENDUM
2455-Corrigendum-16.pdf
CORRIGENDUM
2455_Tender Document LBS.pdf
CORRIGENDUM
2455_Load Break Switch tech specification.pdf
CORRIGENDUM
2455-Corrigendum-8.pdf
CORRIGENDUM
2455-Corrigendum-10.pdf
CORRIGENDUM
2455-Corrigendum-6.pdf
CORRIGENDUM
2455-Corrigendum-12.pdf
CORRIGENDUM
2455-Corrigendum-9.pdf
CORRIGENDUM
2455-Corrigendum-15.pdf
CORRIGENDUM
2455-Corrigendum-5.pdf
CORRIGENDUM
2455-Corrigendum-11.pdf
CORRIGENDUM
2455-Corrigendum-4.pdf
CORRIGENDUM
2455-Corrigendum-3.pdf
CORRIGENDUM
2455-Corrigendum-1.pdf
CORRIGENDUM
2455-Corrigendum-2.pdf
CORRIGENDUM
2455-Corrigendum-13.pdf
CORRIGENDUM
2455-Corrigendum-7.pdf
CORRIGENDUM
2455_NIT.pdf
CORRIGENDUM
Corrigendum-14.pdf
CORRIGENDUM
CTC and Check list.pdf
CORRIGENDUM
2455-Corrigendum-16.pdf
CORRIGENDUM
2455_Tender Document LBS.pdf
CORRIGENDUM
2455_Load Break Switch tech specification.pdf
CORRIGENDUM
2455-Corrigendum-8.pdf
CORRIGENDUM
2455-Corrigendum-10.pdf
CORRIGENDUM
2455-Corrigendum-6.pdf
CORRIGENDUM
2455-Corrigendum-12.pdf
CORRIGENDUM
2455-Corrigendum-9.pdf
CORRIGENDUM
2455-Corrigendum-15.pdf
CORRIGENDUM
2455-Corrigendum-5.pdf
CORRIGENDUM
2455-Corrigendum-11.pdf
CORRIGENDUM
2455-Corrigendum-4.pdf
CORRIGENDUM
2455-Corrigendum-3.pdf
CORRIGENDUM
2455-Corrigendum-1.pdf
CORRIGENDUM
2455-Corrigendum-2.pdf
CORRIGENDUM
2455-Corrigendum-13.pdf
CORRIGENDUM
2455-Corrigendum-7.pdf
CORRIGENDUM
2455_NIT.pdf
CORRIGENDUM
Corrigendum-14.pdf
CORRIGENDUM
CTC and Check list.pdf
CORRIGENDUM
2455_Tender Document LBS.pdf
CORRIGENDUM
2455_Load Break Switch tech specification.pdf
CORRIGENDUM
2455-Corrigendum-8.pdf
CORRIGENDUM
2455-Corrigendum-10.pdf
CORRIGENDUM
2455-Corrigendum-6.pdf
CORRIGENDUM
2455-Corrigendum-12.pdf
CORRIGENDUM
2455-Corrigendum-9.pdf
CORRIGENDUM
2455-Corrigendum-5.pdf
CORRIGENDUM
2455-Corrigendum-11.pdf
CORRIGENDUM
2455-Corrigendum-4.pdf
CORRIGENDUM
2455-Corrigendum-3.pdf
CORRIGENDUM
2455-Corrigendum-1.pdf
CORRIGENDUM
2455-Corrigendum-2.pdf
CORRIGENDUM
2455-Corrigendum-13.pdf
CORRIGENDUM
2455-Corrigendum-7.pdf
CORRIGENDUM
2455_NIT.pdf
CORRIGENDUM
Corrigendum-14.pdf
CORRIGENDUM
CTC and Check list.pdf
CORRIGENDUM
2455_Tender Document LBS.pdf
CORRIGENDUM
2455_Load Break Switch tech specification.pdf
CORRIGENDUM
2455-Corrigendum-8.pdf
CORRIGENDUM
2455-Corrigendum-10.pdf
CORRIGENDUM
2455-Corrigendum-6.pdf
CORRIGENDUM
2455-Corrigendum-12.pdf
CORRIGENDUM
2455-Corrigendum-9.pdf
CORRIGENDUM
2455-Corrigendum-5.pdf
CORRIGENDUM
2455-Corrigendum-11.pdf
CORRIGENDUM
2455-Corrigendum-4.pdf
CORRIGENDUM
2455-Corrigendum-3.pdf
CORRIGENDUM
2455-Corrigendum-1.pdf
CORRIGENDUM
2455-Corrigendum-2.pdf
CORRIGENDUM
2455-Corrigendum-13.pdf
CORRIGENDUM
2455-Corrigendum-7.pdf
CORRIGENDUM
2455_NIT.pdf
CORRIGENDUM
CTC and Check list.pdf
CORRIGENDUM
2455_Tender Document LBS.pdf
CORRIGENDUM
2455_Load Break Switch tech specification.pdf
CORRIGENDUM
2455-Corrigendum-8.pdf
CORRIGENDUM
2455-Corrigendum-10.pdf
CORRIGENDUM
2455-Corrigendum-6.pdf
CORRIGENDUM
2455-Corrigendum-12.pdf
CORRIGENDUM
2455-Corrigendum-9.pdf
CORRIGENDUM
2455-Corrigendum-5.pdf
CORRIGENDUM
2455-Corrigendum-11.pdf
CORRIGENDUM
2455-Corrigendum-4.pdf
CORRIGENDUM
2455-Corrigendum-3.pdf
CORRIGENDUM
2455-Corrigendum-1.pdf
CORRIGENDUM
2455-Corrigendum-2.pdf
CORRIGENDUM
2455-Corrigendum-7.pdf
CORRIGENDUM
2455_NIT.pdf
CORRIGENDUM
CTC and Check list.pdf
CORRIGENDUM
2455_Tender Document LBS.pdf
CORRIGENDUM
2455_Load Break Switch tech specification.pdf
CORRIGENDUM
2455-Corrigendum-8.pdf
CORRIGENDUM
2455-Corrigendum-10.pdf
CORRIGENDUM
2455-Corrigendum-6.pdf
CORRIGENDUM
2455-Corrigendum-12.pdf
CORRIGENDUM
2455-Corrigendum-9.pdf
CORRIGENDUM
2455-Corrigendum-5.pdf
CORRIGENDUM
2455-Corrigendum-11.pdf
CORRIGENDUM
2455-Corrigendum-4.pdf
CORRIGENDUM
2455-Corrigendum-3.pdf
CORRIGENDUM
2455-Corrigendum-1.pdf
CORRIGENDUM
2455-Corrigendum-2.pdf
CORRIGENDUM
2455-Corrigendum-7.pdf
CORRIGENDUM
2455_NIT.pdf
CORRIGENDUM
CTC and Check list.pdf
CORRIGENDUM
2455_Tender Document LBS.pdf
CORRIGENDUM
2455_Load Break Switch tech specification.pdf
CORRIGENDUM
2455-Corrigendum-8.pdf
CORRIGENDUM
2455-Corrigendum-10.pdf
CORRIGENDUM
2455-Corrigendum-6.pdf
CORRIGENDUM
2455-Corrigendum-9.pdf
CORRIGENDUM
2455-Corrigendum-5.pdf
CORRIGENDUM
2455-Corrigendum-4.pdf
CORRIGENDUM
2455-Corrigendum-3.pdf
CORRIGENDUM
2455-Corrigendum-1.pdf
CORRIGENDUM
2455-Corrigendum-2.pdf
CORRIGENDUM
2455-Corrigendum-7.pdf
CORRIGENDUM
2455_NIT.pdf
CORRIGENDUM
CTC and Check list.pdf
CORRIGENDUM
2455_Tender Document LBS.pdf
CORRIGENDUM
2455_Load Break Switch tech specification.pdf
CORRIGENDUM
2455-Corrigendum-8.pdf
CORRIGENDUM
2455-Corrigendum-10.pdf
CORRIGENDUM
2455-Corrigendum-6.pdf
CORRIGENDUM
2455-Corrigendum-9.pdf
CORRIGENDUM
2455-Corrigendum-5.pdf
CORRIGENDUM
2455-Corrigendum-4.pdf
CORRIGENDUM
2455-Corrigendum-3.pdf
CORRIGENDUM
2455-Corrigendum-1.pdf
CORRIGENDUM
2455-Corrigendum-2.pdf
CORRIGENDUM
2455-Corrigendum-7.pdf
CORRIGENDUM
2455_NIT.pdf
CORRIGENDUM
CTC and Check list.pdf
CORRIGENDUM
2455_Tender Document LBS.pdf
CORRIGENDUM
2455_Load Break Switch tech specification.pdf
CORRIGENDUM
2455-Corrigendum-8.pdf
CORRIGENDUM
2455-Corrigendum-6.pdf
CORRIGENDUM
2455-Corrigendum-9.pdf
CORRIGENDUM
2455_NIT.pdf
CORRIGENDUM
2455-Corrigendum-5.pdf
CORRIGENDUM
CTC and Check list.pdf
CORRIGENDUM
2455_Tender Document LBS.pdf
CORRIGENDUM
2455-Corrigendum-4.pdf
CORRIGENDUM
2455_Load Break Switch tech specification.pdf
CORRIGENDUM
2455-Corrigendum-8.pdf
CORRIGENDUM
2455-Corrigendum-3.pdf
CORRIGENDUM
2455-Corrigendum-1.pdf
CORRIGENDUM
2455-Corrigendum-2.pdf
CORRIGENDUM
2455-Corrigendum-6.pdf
CORRIGENDUM
2455-Corrigendum-7.pdf
CORRIGENDUM
2455_NIT.pdf
CORRIGENDUM
2455-Corrigendum-5.pdf
CORRIGENDUM
CTC and Check list.pdf
CORRIGENDUM
2455_Tender Document LBS.pdf
CORRIGENDUM
2455-Corrigendum-4.pdf
CORRIGENDUM
2455_Load Break Switch tech specification.pdf
CORRIGENDUM
2455-Corrigendum-3.pdf
CORRIGENDUM
2455-Corrigendum-1.pdf
CORRIGENDUM
2455-Corrigendum-2.pdf
CORRIGENDUM
2455-Corrigendum-6.pdf
CORRIGENDUM
2455-Corrigendum-7.pdf
CORRIGENDUM
2455_NIT.pdf
CORRIGENDUM
2455-Corrigendum-5.pdf
CORRIGENDUM
CTC and Check list.pdf
CORRIGENDUM
2455_Tender Document LBS.pdf
CORRIGENDUM
2455-Corrigendum-4.pdf
CORRIGENDUM
2455_Load Break Switch tech specification.pdf
CORRIGENDUM
2455-Corrigendum-3.pdf
CORRIGENDUM
2455-Corrigendum-1.pdf
CORRIGENDUM
2455-Corrigendum-2.pdf
CORRIGENDUM
2455-Corrigendum-6.pdf
CORRIGENDUM
2455_NIT.pdf
CORRIGENDUM
2455-Corrigendum-5.pdf
CORRIGENDUM
CTC and Check list.pdf
CORRIGENDUM
2455_Tender Document LBS.pdf
CORRIGENDUM
2455-Corrigendum-4.pdf
CORRIGENDUM
2455_Load Break Switch tech specification.pdf
CORRIGENDUM
2455-Corrigendum-3.pdf
CORRIGENDUM
2455-Corrigendum-1.pdf
CORRIGENDUM
2455-Corrigendum-2.pdf
CORRIGENDUM
2455_NIT.pdf
CORRIGENDUM
CTC and Check list.pdf
CORRIGENDUM
2455_Tender Document LBS.pdf
CORRIGENDUM
2455-Corrigendum-4.pdf
CORRIGENDUM
2455_Load Break Switch tech specification.pdf
CORRIGENDUM
2455-Corrigendum-3.pdf
CORRIGENDUM
2455-Corrigendum-1.pdf
CORRIGENDUM
2455-Corrigendum-2.pdf
CORRIGENDUM
2455_NIT.pdf
CORRIGENDUM
CTC and Check list.pdf
CORRIGENDUM
2455_Tender Document LBS.pdf
CORRIGENDUM
2455_Load Break Switch tech specification.pdf
CORRIGENDUM
2455-Corrigendum-3.pdf
CORRIGENDUM
2455-Corrigendum-1.pdf
CORRIGENDUM
2455-Corrigendum-2.pdf
CORRIGENDUM
2455_NIT.pdf
CORRIGENDUM
CTC and Check list.pdf
CORRIGENDUM
2455_Tender Document LBS.pdf
CORRIGENDUM
2455_Load Break Switch tech specification.pdf
CORRIGENDUM
2455-Corrigendum-1.pdf
CORRIGENDUM
2455-Corrigendum-2.pdf
CORRIGENDUM
2455_NIT.pdf
CORRIGENDUM
CTC and Check list.pdf
CORRIGENDUM
2455_Tender Document LBS.pdf
CORRIGENDUM
2455_Load Break Switch tech specification.pdf
CORRIGENDUM
2455-Corrigendum-1.pdf
CORRIGENDUM
Download all tender documents and submit your bid