| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.3 LAccepted-Finance | ₹7.3 L | L1 | Accepted-Finance Financially fit |
| 2 | L2₹7.4 LAccepted-Finance | ₹7.4 L | L2 | Accepted-Finance Financially fit |
Tender Value
₹6.2 L
EMD Value
₹15,400
Closing Date
25 Mar 2026, 4:30 pmClosed
Executive Engineer PMU Sreekandapuram
Office of The Executive Engineer ,KSEBL, PMU Sreekandapuram
HT INTERLINKING WORK TOWN FEEDER TO VELLARAMPARA
2026_KSEB_838560_2
TENDER/2025-26/6159/89 dt. 20-02-2026
Open Tender
Electrical Works
60 days
Karimbam
Refer tender document
6 documents required · 6 mandatory
₹1,534
Yes
₹15,400
Yes
4 May 2026
16 Mar 2026
27 Mar 2026
16 Mar 2026
25 Mar 2026
16 Mar 2026
16 Mar 2026 - 25 Mar 2026
Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP including conveyance of materials.
Drilling hole of various sizes on existing Channel/Cross Arm.
Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges.
Erection of Anchor clamp / dead end clamp for 11kV ABC of any size
Fitting and erecting one HT Double Pole Structure using A type pole in position including fitting 2 No. channel cross arm, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing).
Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle).
Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil.
Stringing of 11 kV Aerial bunched cable of size 3 x 150 + 1 x 120 sqmm with bare/insulated Messenger through existing poles
Erection of suspension clamp for 11KV ABC of any size
Dismantling (without damage) one 11kV A type pole after disconnecting stays, strut etc. attached thereon and stacking the same.
Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole including conveyance of materials.
Providing concrete muffing of size 0.45x0. 45x1.5m (0.5m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5sides.
Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same.
Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same.
Fitting and providing one Strut using A type pole, including digging and back filling pit in ordinary soil.
Additional rate for excavation of Pit for A type pole in Hard Laterite.
Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work.
Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work.
Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole including disconnecting and reconnecting wires.
Fitting and providing one Strut using HT PSC pole including digging and back filling pit in ordinary soil.
Stringing of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles
Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite.
Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing.
Providing WP support with PSC pole including digging & back filling pit in ordinary soil. excluding transportation of poles.
Labour charges for loading LT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle).
Dismantling (without damage) one km 11kV line (three conductors) including dismantling cross arm, insulators, disc, disconnecting jumper connection, rolling the conductor and stacking the materials.
Dismantling (without damage) one km LT three phase 4 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly.
Dismantling (without damage) one km LT single phase 2 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly.
Dismantling (without damage) one km LT additional conductor line by dismantling cross arms, insulators and stacking the conductors in rolls properly.
Fiting One No MVT on existing cross arm excluding termination work (for One phase) of any rating for 11 kV AB Cable
Doing one cable end termination on HT ABC of sizes Up to 3x150+1x120 sqmm and connecting to existing MVT or other terminals,using the cable end termination kit supplied departmentally including charges for cable jointer etc. complete as per the direction of the departmental officers.
Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle).
Additional rate for excavation of one Earth Pit (2.5m depth) in Hard Laterite.
Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at a minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil & backfilling.
Fitting one set (3No.) 11kV LA and giving connections excluding earthing.
Transferring LT single phase 2/3 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete.
Transferring LT three phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete.
Additional rate for excavation of one Pit for HT Pole/HT Stay in Soft Rock.
Providing Cable Tie
Erecting 9m PSC pole as support pole for ABC stringing work-New
Erecting HT A-Type pole as support pole for ABC stringing work -New
Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling.
Additional rate for excavation of Pit for A type pole in Laterite.
Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite.
Additional rate for excavation of one Earth Pit (2.5m depth) in Laterite.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1431841.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
BidDocumentretender.pdf
Tender Documents • 2.12 MB
BOQ_1431841.xls
BOQ • 0.34 MB
GSTregistertion.pdf
Other Document • 0.01 MB
Download all tender documents and submit your bid