Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAccepted-AOC PALAJI CHADAYAMANGALAM | L1 | Accepted-AOC L1 | |
| 2 | L2₹8.5 L+₹6,605.46 (0.79%)Rejected-AOC THENOOR VILLAGE OFFICE ROAD IN WARD 7 | PALAKKAD | KERALA | 678001 | L2 | Rejected-AOC L2 |
Tender Value
₹8.5 L
EMD Value
₹21,183
Closing Date
10 Oct 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant engineer
Assistant engineer LID and EW Pangode Gp
Manakkod Thazhepangode chekkitta mukk Road Retaring and side concreting
2022_LSGD_510931_1
115/AE/LSGD/PGD/22_23
Open Tender
Civil Works - Roads
Item Rate
150 days
Pangode Gp
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,870
Yes
₹21,183
Yes
5 Jan 2023
28 Sept 2022
12 Oct 2022
28 Sept 2022
10 Oct 2022
28 Sept 2022
30 days
Amount
RE-TARRING
5.5.B.2a:Modified Penetration Macadam 75 mm thick using Bitumen S-65 <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. <br> (B) 75 mm thick :- (II) Bitumen (S-65)
5.2.1a:Tack Coat<br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
75.5.9.2.2.Pa:Plastic Roads - Bitumen S-65 <br> 20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder <br> Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508 (with 7% of bitumen replaced by shredded waste plastic) <br> Case - I By Manual Means <br> (II) Bitumen (S-65) (VG - 30)
75.5.12.A.3.2Z:Seal Coat - Manual Means - Type C - Bitumen S-65 and Antistripping Agent <br> Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 <br> A. By Manual Means <br> Case - III : Type C <br> (II) Bitumen (S-65)
BERM CONCRETE
OD95297/2022-2023:Surface dressing of the ground including removing vegitation and in equalities not exceeding 15cm deep and disposal of rubbish ,lead upto 50m and lift upto 1.5m
75.8.1.1.A:Providing Plain cement concrete for wearing coat CC 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to required slope as required including compaction, finishingand tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixedin concrete mixer etc complete as per specification (i) Nominal mix (1:2:4)
RECONCRETE
75.8.1.1.A:Providing Plain cement concrete for wearing coat CC 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to required slope as required including compaction, finishingand tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixedin concrete mixer etc complete as per specification (i) Nominal mix (1:2:4)
SIDE WALL CONSTRUCTION
11.1.1.1:Excavation for Structures <br> Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. <br> I. Ordinary soil <br> (i) Upto 3 m depth
75.7.1:DRY RUBBLE MASONRY with hard stone, including Through/Bond stone in foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications.
75.8.1.1:Providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate) forsubstructure as per drawings and technical specifications Clause 802, 803, 1202 & 1203as required including compaction, finishing and tamping etc .complete. Max. size ofcourse aggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
Name board
OD95825/2022-2023:Supplying and fixing in position Name boards of required size as specified by the engineer in charge made in MS pipes and MS sheet and painted with enamel paint and lettering as specified by the engineer in charge.(Payment to made against the actual bill) (For Grama Panchayath)
GALAXY CONSTRUCTION
Bidder Name
SAJEEM A
GALAXY CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_731887.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .