Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.2 LAccepted-AOC CHAKKALAYIL THIRUVANCHOOR KOTTAYAM | KOTTAYAM | KOTTAYAM | KERALA | L1 | Accepted-AOC Being first lowest | |
| 2 | L2₹10.5 L+₹32,509.41 (3.19%)Rejected-AOC 206 CARMEL TOWER WADI AMRAVATI ROAD WADI WADI NAGPUR MAHARASHTRA 440023 UDYAM MH 20 0008098 | NAGPUR | MAHARASHTRA | 440023 | L2 | Rejected-AOC Being second lowest |
Tender Value
₹9.5 L
EMD Value
₹23,750
Closing Date
12 Mar 2024, 5:00 pmClosed
The Managing Director
Kerala State Warehousing Corporation, Head Office Ernakulam, P.B.No.1727, Warehousing Corporation Road, Kochi-682016
Construction of toilet block, gate and painting of KSBC office building and other maintenance works at State Warehouse SH Mount in Kottayam District
2024_KSWC_656128_1
KSWC/Constn/RM/SW/SH Mount/2023-24
Open Tender
Repair and Maintenance Works
Item Rate
90 days
State Warehouse S.H. Mount
Please refer Tender documents
9 documents required · 9 mandatory
₹2,242
Yes
₹23,750
Yes
29 Jul 2024
19 Feb 2024
14 Mar 2024
19 Feb 2024
12 Mar 2024
19 Feb 2024
19 Feb 2024 - 12 Mar 2024
Amount
Painting
Wall painting with acrylic emulsion paint, having VOC (Volatile Organic Compound) content less than 50 grams/ litre, of approved brand and manufacture including applying additional coats wherever required, to achieve even shade and colour.Two coats. After preparing the surface by using wirebrush or emery paper,all works including cost and conveyance of all materials,labour charges, scaffolding etc. complete as required.
White washing with lime to give an even shade :Old work (two or more coats). After preparing the surface by using wirebrush or emery paper,all works including cost and conveyance of all materials,labour charges, scaffolding etc. complete as required.
Painting with synthetic enamel paint of approved brand and manufacture ofrequired colour to give an even shade :Two or more coats on old work. After preparing the surface by using wirebrush or emery paper,all works including cost and conveyance of all materials,labour charges, scaffolding etc. complete as required.
Providing and fixing 200mm (or nearest greater available size) PVC half split square type eave gutter all works including cost of all necessary fittings (PVC down pipe to be paid separately) cost and conveyance of all materials,labour charges, scaffolding etc. complete as required.
Bird protection mesh fixing
Steel work in built up tubular (round, square or rectangular hollow tubes etc.-minimum thickness 2.00 mm) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer after preparing the surface by using wirebrush or emery paper, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes.All works including cost and conveyance of all materials,labour charges, scaffolding etc. complete as required.
Supplying and fixing welded mesh 25 x 25mm square 14 guage including cost and conveyance of all materials required and all labour charges etc. complete.
12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand). All works including cost and conveyance of all materials,labour charges, scaffolding etc. complete as required.
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work all works including cost and conveyance of all materials,labour charges, scaffolding etc. complete as required.
Toilet Block
Clearing grass and removal of the rubbish up to a distance of 500 m outside the periphery of the area cleared.
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 500 m. All kinds of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing. All works including cost and conveyance of all materials,labour charges, scaffolding etc. complete as required.
Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15cm in: CM 1:6 ( 1 cement :6 coarse sand) etc complete
Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position andbinding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand). All works including cost and conveyance of all materials,labour charges, scaffolding etc. complete as required.
Supply and fixing precast ventilator of size 600x400 mm with shutters. All works including cost and conveyance of all materials,labour charges, scaffolding etc. complete as required.
Supplying and fixing PVC door of size 0.75 x 2.10 M using door frame 50 x 47 x 5mm reinforced with 19 x 19 mm x 19 gauge. M .S square tube, 30 mm thick shutter solid PVC door reinforced with 19 x 19 x 19 gauge M S square tube for the shutter in single leaf including 18 Nos 50mm screws fixed in walls including all door fittings cost and conveyance of all materials required etc. complete as per instruction of Engineer-in-charge during execution.
Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), including pointing the joints with white cement and matching pigment etc., complete.
Providing and fixing I st quality ceramic glazed wall tiles conforming to IS : 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer -in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3 kg per sqm, including pointing in white cement mixed with pigment of matching shade complete.
White washing with White cement to give an even shade: New work (one or more coats). After preparing the surface by using wirebrush or emery paper,all works including cost and conveyance of all materials,labour charges, scaffolding etc. complete as required.
Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade:Two or more coats on new work all works including cost and conveyance of all materials,labour charges, scaffolding etc. complete as required.
Providing and fixing white vitreous china pedestal type water closet (European type W.C. pan) with seat and lid, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever), conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required: W.C. pan with ISI marked black solid plastic seat and lid
Providing and fixing white vitreous china flat back or wall corner type lipped front urinal basin of 430x260x350 mm and 340x410x265 mm sizes respectively with automatic flushing cistern with standard flush pipe and C.P. brass spreaders with brass unions and G.I. clamps complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required:One urinal basin with 5 litre white P.V.C. automatic flushing cistern
Providing and fixing wash basin with C.I. brackets, 15 mm steel pillar taps, 32 mm steel waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require:<br>White Vitreous China Wash basin size 550x400 mm with a 15 mm steel pillar taps
Supplying and fixing steel long bog body tap including cost of material and labour charges as per the direction of engineer in charge.
Supplying and fixing Stainless steel soap dish including cost of materials and labour charges etc complete as per the direction of site Engineer-in-charge.
Supplying and fixing CP Towel rod 60cm or nearest available length including cost of materials and labour charges etc complete as per the direction of site Engineer-in-charge.
Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 32 mm dia 10Kgf/cm2- Internal work - Exposed on wall. All works including cost of materials and labour charges etc complete as per the direction of site Engineer-in-charge.
Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge. Concealed work, including cutting chases and making good the wall etc. 20 mm pipe 10 Kgf/ cm2. All works including cost of materials and labour charges etc complete as per the direction of site Engineer-in-charge.
Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge. Concealed work, including cutting chases and making good the wall etc. 50 mm pipe 6 kgf/cm2. All works including cost of materials and labour charges etc complete as per the direction of site Engineer-in-charge.
Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge. Concealed work, including cutting chases and making good the wall etc. 75 mm pipe 6 Kgf/cm2. All works including cost of materials and labour charges etc complete as per the direction of site Engineer-in-charge.
Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge. Concealed work, including cutting chased and making good the wall etc. 110 mm pipe 6kgf/cm2. All works including cost of materials and labour charges etc complete as per the direction of site Engineer-in-charge.
Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement - 75 mm dia Vent cowl. All works including cost of materials and labour charges etc complete as per the direction of site Engineer-in-charge.
Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement- 110 mm dia Bend. All works including cost of materials and labour charges etc complete as per the direction of site Engineer-in-charge.
Providing and fixing PVC moulded fittings/accessories for Rigid PVC pipes, including jointing with PVC solvent cement - 110x110x110 mm dia Door tee. All works including cost of materials and labour charges etc complete as per the direction of site Engineer-in-charge.
Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement - 110x110x75 mm dia Door Tee. All works including cost of materials and labour charges etc complete as per the direction of site Engineer-in-charge.
Supplying and installing ready made PVC Septic tank including the cost of carriage, trenching, placing at the level below ground level as specified as per the direction of engineer in charge (The rate shall quoted inclusive of provision for CC/RCC/Sand/06mm aggregate for the preparation of bed )15 to below 25 flush capacity. All works including cost of materials and labour charges etc complete as per the direction of site Engineer-in-charge.
Providing and fixing floor trap of approved quality & make as per the direction of engineer in charge. All works including cost of materials and labour charges etc complete as per the direction of site Engineer-in-charge.
Providing and fixing 100 mm stainless steel grating for gully trap of approved quality & make as per the direction of engineer in charge. All works including cost of materials and labour charges etc complete as per the direction of site Engineer-in-charge.
Supplying and fixing steel health faucet including all charges etc complete. All works including cost of materials and labour charges etc complete as per the direction of site Engineer-in-charge.
Steel work in built up tubular (round, square or rectangular hollow tubes etc.-minimum thickness 2.00 mm) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer after preparing the surface by using wirebrush or emery paper, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes.All works including cost and conveyance of all materials,labour charges, scaffolding etc. complete as required.
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade:Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture all works including cost and conveyance of all materials,labour charges, scaffolding etc. complete as required.
Providing silicon compound covering to G.I. bolts over roof all works including cost and conveyance of all materials,labour charges, scaffolding etc. complete as required.
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Steel work in built up tubular (round, square or rectangular hollow tubes etc.-minimum thickness 2.00 mm) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer after preparing the surface by using wirebrush or emery paper, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes.All works including cost and conveyance of all materials,labour charges, scaffolding etc. complete as required.
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work, painting over the existing structure after preparing the surface by using wirebrush or emery paper,all works including cost and conveyance of all materials,labour charges, scaffolding etc. complete as required.
carmel builders and fibrotech industries pvt ltd
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .