Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.2 LAccepted-AOC | ₹1.2 L | 1 | Accepted-AOC L1 |
| 2 | 2₹1.3 LRejected-AOC | ₹1.3 L | 2 | Rejected-AOC L2 |
| 3 | 3₹1.3 LRejected-Finance | ₹1.3 L | 3 | Rejected-Finance L3 |
Tender Value
₹1.3 L
EMD Value
₹3,314
Closing Date
30 Jan 2026, 6:00 pmClosed
Executive Engineer (Civil)
Office of the Executive Engineer (Civil) Engineering Department University of Calicut Calicut University P O Malappuram District Kerala 673635
Reconstruction of compound wall to H37A Quarters
2026_UoC_830075_1
D2/50/2026
Open Tender
Civil Works - Others
30 days
Calicut University Campus Thenjippalam
Please refer Tender documents.
7 documents required · 7 mandatory
₹590
Yes
₹3,314
Yes
30 Mar 2026
23 Jan 2026
2 Feb 2026
23 Jan 2026
30 Jan 2026
23 Jan 2026
15.7.3 : Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge. In lime mortar
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil
7.1.1 : Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
13.33.1 : Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
50.6.7.2 : Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc.
13.4.1 12 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand)
10.25.2 : Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
13.61.1 : Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1394319.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.73 MB
DECLARATION.pdf
Additional Documents • 0.12 MB
epaymentform.pdf
Additional Documents • 0.01 MB
PreliminaryAgreement.pdf
Additional Documents • 0.03 MB
TenderdocumentsH37A.pdf
Tender Documents • 1.74 MB
BOQ_1394319.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid