Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1 L
Closing Date
20 Sept 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive engineer REW Ganderbal
Executive engineer REW Ganderbal
Construction of Foot culvert Near L/O Nazir Ahmad Khatana at Poshkar. BLOCK kANGAN
2021_RDPR_138084_7
e-NIT No.39/2021-22
Open Tender
Civil Works
Item Rate
30 days
RD AND PR
Please refer Tender documents.
2 documents required · 2 mandatory
₹100
Yes
Executive engineer REW Ganderbal
Exempted
21 Sept 2021
7 Sept 2021
21 Sept 2021
7 Sept 2021
20 Sept 2021
7 Sept 2021
120 days
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soils
Supply and laying of stone soling (hand packed ) in trenches of foundation including consolidation watering and ramming and all consequential and incidental costs like all leads,lifts,carriages but excluding head load by manual labour or by ponnies.
centering and shuttering including strutting,propping etc and removal of forms including all consequential and incidental costs like all leads,lifts,carriages and scaffolding etc complete job.
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level :Mild steel and medium tensile steel bars
Photographs/Signboard.
M/S ZAHOOR AHMAD MAGRAY
ABDUL AHAD MAGRAY
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .