| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.6 CrAdmitted-Finance BERWAR KISHTWAR | KISHTWAR | JAMMU AND KASHMIR | 182132 | ₹11.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹14.5 CrAdmitted-Finance 306 B 2 SOUTH BLOCK BAHU PLAZA JAMMU J K 180004 | JAMMU | JAMMU AND KASHMIR | 180004 | ₹14.5 Cr | L2 | Admitted-Finance |
| 3 | Rejected-Technical H NO 4 ANAND VIHAR KANSAPUR ROAD YAMUNA NAGAR HARYANA | YAMUNANAGAR | HARYANA | 133103 | - | - | Rejected-Technical Technically not qualified |
| Sl No | Description | Qty | Unit | M/S Abdul Rashid Bhat and Sons L1 | M/S SHIVAM BUILD CON ASSOCIATES L2 |
|---|---|---|---|---|---|
| 1.00Part-I : PROVIDING, LAYING SPREADING AND COMPACTION OF WET MIX MACADAM (WMM) 100 MM THICK CONSOLIDATED IN SINGLE LAYER , WMM 150 MM THICK CONSOLIDATED (IN TWO LAYERS EACH 75 MM THICK CONSOLIDATED) , DENSE BITUMINOUS MACADAM (DBM) 60 MM THICK CONSOLIDATED AND BC 30 MM THICK CONSOLIDATED INCLUDING CLEANING OF ROAD SURFACE APPLYING PRIME COAT AND TACK COAT AND ROAD MARKING WITH THERMOPLASTIC PAINT 2.5 MM THICK ALL AS PER PARTICULAR SPECIFICATION/MORT&H SPECIFICATION ( FIFTH REVISION ) BETWEEN KM 58.875 TO KM 62.00 (NET LENGTH 3.125) ON GALHAR-SANSARI RPAD IN 118 RCC SECTOR UNDER 35 BRTF/PROJECT SAMPARKIN J&K (UT)(Job No 248/57) | |||||
| 1.01 | Providing, laying, spreading and compaction of WMM 75 mm thick layer Consolidated all as per MORT&H specification (Vth Revision) and as specified at particular specification. | 27,065.5 | Sqm | 110 ₹29.8 L | 250 ₹67.7 L |
| 1.02 | Providing, laying, spreading and compaction of WMM 100 mm thick layer Consolidated all as per MORT&H specification (Vth Revision) and as specified at particular specification. | 22,495.7 | Sqm | 160 ₹36.0 L | 300 ₹67.5 L |
| 1.03 | Application of Prime Coat all as specified in particular specifications using Bitumen Emulsion at the rate of 7.5 Kg/10 Sqm | 21,571.2 | Sqm | 25 ₹5.4 L | 50 ₹10.8 L |
| 1.04 | Providing, laying, spreading and compaction of DBM 60 mm thick layer Consolidated all as per MORT&H specification (Vth Revision) and as specified at particular specification. | 21,571.2 | Sqm | 540 ₹1.2 Cr | 460 ₹99.2 L |
| 1.05 | Application of Tack Coat all as specified in particular specifications using Emulsion at the rate of 2.5 Kg/10 Sqm | 21,571.2 | Sqm | 25 ₹5.4 L | 30 ₹6.5 L |
| 1.06 | Providing, laying, spreading and compaction of BC 30 mm thick layer Consolidated as per MORT&H specification (Vth Revision) and as specified at particular specification. | 21,571.2 | Sqm | 330 ₹71.2 L | 400 ₹86.3 L |
| 1.07 | Road Marking with Thermoplastic Paint (at least 2.5 mm thick) confirming to Clause 803.4 of MORT&H (Vth Revision) and as specified at particular specification including preparation of surface and application. | 1,047.9 | Sqm | 550 ₹5.8 L | 500 ₹5.2 L |
| 2.00PART-II :PROVIDING, LAYING, SPREADING AND COMPACTION OF WET MIX MACADAM (WMM) 100 MM THICK CONSOLIDATED (TWO LAYER OF 100 MM THICK EACH), DENSE BITUMINOUS MACADAM (DBM) 50 MM THICK CONSOLIDATED AND BC 30 MM THICK CONSOLIDATED INCLUDING CLEANING OF ROAD SURFACE APPLYING PRIME COAT AND TACK COAT AND ROAD MARKING WITH THERMOPLASTIC PAINT 2.5 MM THICK ALL AS PER PARTICULAR SPECIFICATION/MORT&H SPECIFICATION (FIFTH REVISION) BETWEEN KM 55.00 TO 58.875 REALIGNMENT STRERCHES TAKE OFF POINT KM 55.10 (KM0.00) AND MEETING POINT KM 58.775 (KM 10.925) (PART –II) ON GALHAR-SANSARI ROAD IN 118 RCC SECTOR UNDER 35 BRTF/PROJECT SAMAPRK IN J&K (UT) PART-II (Job No 248/59) | |||||
| 2.01 | Providing, laying, spreading and compaction of WMM 100 mm thick layer Consolidated all as per MORT&H specification (Vth Revision) and as specified at particular specification.(02 Layers ) | 1,30,912.24 | Sqm | 170 ₹2.2 Cr | 295 ₹3.9 Cr |
Tender Value
₹13.4 Cr
EMD Value
₹10.0 L
Closing Date
30 Oct 2023, 12:00 pmClosed
Chief Engineer Project Sampark
HQ Chief Engineer Project Sampark Near Peer Baba Kunjwani Chowk Jammu
SURF WKS BETWEEN KM 58.875 TO 62.00 (NET 3.125 km) (PART-I) AND KM 55.00 TO 58.875 REALIGNMENT TAKE OFF POINT KM 55.10 (KM0.00) AND MEETING POINT KM 58.775 (KM 10.925) (PART II) ON GALHAR-SANSARI ROAD IN 118 RCC SECTOR UNDER 35 BRTF/PROJECT SAMAPR
2023_BRO_621245_1
CE(P) SPK/05/2023-24
Open Tender
Civil Works - Roads
365 days
GALHAR-SANSARI ROAD IN 118 RCC
As per tender documents
9 documents required · 9 mandatory
₹0
₹10.0 L
Yes
HQ Chief Engineer Project Sampark
29 Nov 2023
30 Sept 2023
31 Oct 2023
30 Sept 2023
30 Oct 2023
9 Oct 2023
3 Oct 2023 - 5 Oct 2023
7 Oct 2023
Amount
Part-I : PROVIDING, LAYING SPREADING AND COMPACTION OF WET MIX MACADAM (WMM) 100 MM THICK CONSOLIDATED IN SINGLE LAYER , WMM 150 MM THICK CONSOLIDATED (IN TWO LAYERS EACH 75 MM THICK CONSOLIDATED) , DENSE BITUMINOUS MACADAM (DBM) 60 MM THICK CONSOLIDATED AND BC 30 MM THICK CONSOLIDATED INCLUDING CLEANING OF ROAD SURFACE APPLYING PRIME COAT AND TACK COAT AND ROAD MARKING WITH THERMOPLASTIC PAINT 2.5 MM THICK ALL AS PER PARTICULAR SPECIFICATION/MORT&H SPECIFICATION ( FIFTH REVISION ) BETWEEN KM 58.875 TO KM 62.00 (NET LENGTH 3.125) ON GALHAR-SANSARI RPAD IN 118 RCC SECTOR UNDER 35 BRTF/PROJECT SAMPARKIN J&K (UT)(Job No 248/57)
Providing, laying, spreading and compaction of WMM 75 mm thick layer Consolidated all as per MORT&H specification (Vth Revision) and as specified at particular specification.
Providing, laying, spreading and compaction of WMM 100 mm thick layer Consolidated all as per MORT&H specification (Vth Revision) and as specified at particular specification.
Application of Prime Coat all as specified in particular specifications using Bitumen Emulsion at the rate of 7.5 Kg/10 Sqm
Providing, laying, spreading and compaction of DBM 60 mm thick layer Consolidated all as per MORT&H specification (Vth Revision) and as specified at particular specification.
Application of Tack Coat all as specified in particular specifications using Emulsion at the rate of 2.5 Kg/10 Sqm
Providing, laying, spreading and compaction of BC 30 mm thick layer Consolidated as per MORT&H specification (Vth Revision) and as specified at particular specification.
Road Marking with Thermoplastic Paint (at least 2.5 mm thick) confirming to Clause 803.4 of MORT&H (Vth Revision) and as specified at particular specification including preparation of surface and application.
PART-II :PROVIDING, LAYING, SPREADING AND COMPACTION OF WET MIX MACADAM (WMM) 100 MM THICK CONSOLIDATED (TWO LAYER OF 100 MM THICK EACH), DENSE BITUMINOUS MACADAM (DBM) 50 MM THICK CONSOLIDATED AND BC 30 MM THICK CONSOLIDATED INCLUDING CLEANING OF ROAD SURFACE APPLYING PRIME COAT AND TACK COAT AND ROAD MARKING WITH THERMOPLASTIC PAINT 2.5 MM THICK ALL AS PER PARTICULAR SPECIFICATION/MORT&H SPECIFICATION (FIFTH REVISION) BETWEEN KM 55.00 TO 58.875 REALIGNMENT STRERCHES TAKE OFF POINT KM 55.10 (KM0.00) AND MEETING POINT KM 58.775 (KM 10.925) (PART –II) ON GALHAR-SANSARI ROAD IN 118 RCC SECTOR UNDER 35 BRTF/PROJECT SAMAPRK IN J&K (UT) PART-II (Job No 248/59)
Providing, laying, spreading and compaction of WMM 100 mm thick layer Consolidated all as per MORT&H specification (Vth Revision) and as specified at particular specification.(02 Layers )
Application of Prime Coat all as specified in particular specifications using Bitumen Emulsion at the rate of 7.5 Kg/10 Sqm
Providing, laying, spreading and compaction of DBM 50 mm thick layer Consolidated all as per MORT&H specification (Vth Revision) and as specified at particular specification.
Application of Tack Coat all as specified in particular specifications using Emulsion at the rate of 2.5 Kg/10 Sqm
Providing, laying, spreading and compaction of BC 30 mm thick layer Consolidated as per MORT&H specification (Vth Revision) and as specified at particular specification.
Road Marking with Thermoplastic Paint (at least 2.5 mm thick) confirming to Clause 803.4 of MORT&H (Vth Revision) and as specified at particular specification including preparation of surface and application.
M/S SHIVAM BUILD CON ASSOCIATES
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
TenderofGS.pdf
Tender Documents • 1.29 MB
BOQ_695573.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid