Tender Value
₹8.0 L
EMD Value
₹15,900
Closing Date
31 Aug 2026, 6:00 pm7d left
Executive Engineer
Office Of The Executive Engineer REW Samba
Please Refer as per BOQ
2026_RDPR_321100_11
72 REW samba of 2026-27, Dated 17.08.2026
Open Tender
Civil Works
Percentage
30 days
Samba
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer REW samba
₹15,900
17 Aug 2026
17 Aug 2026
1 Sept 2026
17 Aug 2026
31 Aug 2026
17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface excavation not exceeding 30cm in depth but exceeding 1.5m in width as well as 10sqm on plan including disposal of excavated earth upto 1m from cutting edge in all kinds of soil. | 176 | sqm | 91.75 | ₹16,148 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 16.5 | cum | 4,826.5 | ₹79,637.25 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 21.5 | cum | 7,788.4 | ₹1,67,450.6 |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 1,300 | kg | 123.2 | ₹1,60,160 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work | 6.1 | cum | 286.35 | ₹1,746.74 |
| 6 | Providing and laying of synthetic coating to smoothen surface in eight layers, a) two layer resurfacer , b) four layers of cushioning (rubberised ), c) two layers of colour coating acrylic rubber paint, d) line marking of ISO 9001 & 2015 certified make including ITF approved certification under 1 star rating | 220 | point | 1,500 | ₹3,30,000 |
| 7 | supply & fixing of height adjustable goal post with net incl. all fixtures complete job as per direction of engineer in charge (To be paid as per actual LMR) | 1 | set | 20,000 | ₹20,000 |
| 8 | Carriage of material from source to site of work M.T including loading & unloading complete | 51.9 | cum | 279 | ₹14,480.1 |
| 9 | Add Provision for writing, Painting incl.CIB | 1 | no. | 6,000 | ₹6,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.96 MB
BOQ_1070684.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].