Chief Construction Engineer
Rural Works Circle, Sunabeda, At-Sunabeda-1, Near Jagannath Temple, PIN-763001, Dist-Koraput
Construction of H.L Bridge over Local Nallah at 2.600 Km on Nabarangpur to Ambadola Road in the District of Nabarangpur under SBY for the year 2024-25.
2026_CERWI_143082_1
CCERWCSBD-Online-33/2026-27
National Competitive Bid
Civil Works - Bridges
Percentage
330 days
Nabarangapur
4 documents required · 4 mandatory
₹10,000
₹5.1 L
Yes
9 Oct 2026
9 Oct 2026
31 Oct 2026
9 Oct 2026
30 Oct 2026
9 Oct 2026
9 Oct 2026 - 29 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing & constructing service road as per direction of Engineer in Charge. | 102 | rm | 2,778 | ₹2,83,356 |
| 2 | Earthwork in excavation in foundation in all kinds of soil within initial lead of 50m. and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3 mtr in depth etc complete as per the direction of the Enngineer in Charge. | 340.09 | cum | 259.6 | ₹88,286.84 |
| 3 | Providing and Laying Cutting edge of Mild Steel weighing 40 kg per metre including cladding for Well foundation etc. complete as per drawing and technical specifications. | 294.81 | qtl | 11,872.48 | ₹35,00,125.83 |
| 4 | Labour for sinking in all kinds of soil other than rock in lines plumb etc complete. Upto 10.00 mtr depth
For 7.50 mtr dia Well
Abutment Left 98.000 to 91.440 mtr
Abutment Right 98.000 to 93.674 mtr | 10.89 | rm | 28,422.79 | ₹3,09,410.49 |
| 5 | Labour for sinking in all kinds of soil other than rock in lines plumb etc complete. Upto 10.00 mtr depth
For 7.50 mtr dia Well
Pier 96.334 to 92.66 mtr | 3.67 | rm | 28,422.79 | ₹1,04,425.33 |
| 6 | Construction of 6m. Dia R.C.C well sinking in soft rock to lines levels & plumb by scooping out from inside and below the steining including cost of hire and running charges of tools and plants and supplying & working of pumps bailing out of water and removal of all materials and obstacle from inside the well by divers etc. including precaution against shifting and lifting disposal of the soil with all leads and lift etc. complete as directed by the Engineer-in-charges.
For 7.50 mtr dia Well
Abutment Left 91.440 to 89.54 mtr
Abutment Right 93.674 to 92.774 mtr | 2.8 | rm | 3,34,469.5 | ₹9,36,514.6 |
| 7 | Construction of 6m. Dia R.C.C well sinking in soft rock to lines levels & plumb by scooping out from inside and below the steining including cost of hire and running charges of tools and plants and supplying & working of pumps bailing out of water and removal of all materials and obstacle from inside the well by divers etc. including precaution against shifting and lifting disposal of the soil with all leads and lift etc. complete as directed by the Engineer-in-charges.
For 7.50 mtr dia Well
Pier P1 92.660 to 90.76 mtr | 1.9 | rm | 3,34,469.5 | ₹6,35,492.05 |
| 8 | Construction of 6m. Dia R.C.C well sinking in Hard rock to lines levels & plumb by scooping out from inside and below the steining including cost of hire and running charges of tools and plants and supplying & working of pumps bailing out of water and removal of all materials and obstacle from inside the well by divers etc. including precaution against shifting and lifting disposal of the soil with all leads and lift etc. complete as directed by the Engineer-in-charges.
For 7.50 mtr dia Well
Abutment Left 89.54 to 88.94 mtr
Abutment Right 92.774 to 92.174 mtr | 1.2 | rm | 6,68,232.67 | ₹8,01,879.2 |
| 9 | Construction of 6m. Dia R.C.C well sinking in Hard rock to lines levels & plumb by scooping out from inside and below the steining including cost of hire and running charges of tools and plants and supplying & working of pumps bailing out of water and removal of all materials and obstacle from inside the well by divers etc. including precaution against shifting and lifting disposal of the soil with all leads and lift etc. complete as directed by the Engineer-in-charges.
For 7.50 mtr dia Well
Pier P1 90.760 to 90.16 mtr | 0.6 | rm | 6,68,232.67 | ₹4,00,939.6 |
| 10 | Plain Cement Concrete M 15 Grade using 20mm down graded chips in Foundation and Plinth
Bottom Plugging | 206.78 | cum | 5,847.16 | ₹12,09,058.2 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_3.pdf
PDF • 0.91 MB
Tendernotice_2.pdf
PDF • 0.36 MB
Tendernotice_1.pdf
PDF • 3.26 MB
BOQ_613205.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .