Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.4 LAccepted-AOC | ₹9.4 L | 1 | Accepted-AOC R1-Lowest Amount Quoted Bidder |
| 2 | 2₹10.1 L+₹67,596.19 (7.15%)Rejected-AOC LSGD SECTION SOORANAD NORTH | KOTTAYAM | KERALA | 686001 | ₹10.1 L+₹67,596.19 (7.15%) | 2 | Rejected-AOC R2-Highest Amount quoted Bidder |
Tender Value
₹10.6 L
EMD Value
₹26,600
Closing Date
5 Oct 2019, 5:00 pmClosed
Assistant Executiv Engineer
Assistant Executive Engineer, KIP(RB) Sub Division No.26, Karunagappally
Rectification Work
2019_Irrig_303968_1
24/AEE/KIP/KPY/201-20
Open Tender
Civil Works - Canal
Item Rate
120 days
Thaarakkulam and Sooranad
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,400
Yes
online
₹26,600
Yes
10 Jan 2020
27 Sept 2019
10 Oct 2019
27 Sept 2019
5 Oct 2019
27 Sept 2019
Amount
Scheme 1; Rectification work of Anayadi Distributory between chainage 1200 m to 1270 m)
od34266/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed in all kinds of soil for clearing the canal bed by desilting
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
od34269/2019_2020/P2 : Cement concrete 1:4:7 using 20mm metal to lines and levels including proper compacting curing , watering etc. complete with all leads and lift etc. complete as per specification or as directed by Engineer in chaege
od34270/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.
scheme 2: (Rectification work of Anayadi distributory between chainage 1270 m to 1340 m)
od34266/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed in all kinds of soil for clearing the canal bed by desilting
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
od34269/2019_2020/P2 : Cement concrete 1:4:7 using 20mm metal to lines and levels including proper compacting curing , watering etc. complete with all leads and lift etc. complete as per specification or as directed by Engineer in chaege
od34270/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.
scheme 3: ( Rctification work of Anayadi distributry between chainage 1350 m to 1420 m
od34278/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth upto 50 m and lift upto 1.5m , disposed soil to be levelled and neatly dressed in all kinds of soil to be levelled and neatly dressed in all kinds of soil for clearing the canal bed by desilting
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
od34279/2019_2020/P2 : Cement concrete 1:4:7 using 20mm metal to line and levels including proper compacting,curing, watering etc complete with all leads lift etc complete as per specification or as directed by departmental officers at site
od34270/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.
Scheme 4: (Rectificatio of Anayadi distributory between chainage 1420 m to 1500 m
od34278/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth upto 50 m and lift upto 1.5m , disposed soil to be levelled and neatly dressed in all kinds of soil to be levelled and neatly dressed in all kinds of soil for clearing the canal bed by desilting
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
od34269/2019_2020/P2 : Cement concrete 1:4:7 using 20mm metal to lines and levels including proper compacting curing , watering etc. complete with all leads and lift etc. complete as per specification or as directed by Engineer in chaege
od34270/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.
Scheme 5: (Rectificatio of Anayadi distributory between chainage 1500 m to 1580 m)
od34278/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth upto 50 m and lift upto 1.5m , disposed soil to be levelled and neatly dressed in all kinds of soil to be levelled and neatly dressed in all kinds of soil for clearing the canal bed by desilting
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
od34269/2019_2020/P2 : Cement concrete 1:4:7 using 20mm metal to lines and levels including proper compacting curing , watering etc. complete with all leads and lift etc. complete as per specification or as directed by Engineer in chaege
od34270/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.
Scheme 6: (Rectificatio of Anayadi distributory between chainage 1580 m to 1640 m)
od34278/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth upto 50 m and lift upto 1.5m , disposed soil to be levelled and neatly dressed in all kinds of soil to be levelled and neatly dressed in all kinds of soil for clearing the canal bed by desilting
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
od34269/2019_2020/P2 : Cement concrete 1:4:7 using 20mm metal to lines and levels including proper compacting curing , watering etc. complete with all leads and lift etc. complete as per specification or as directed by Engineer in chaege
od34270/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.
Scheme 7: (Rectificatio of Anayadi distributory between chainage 1650 m to 1720 m)
od34278/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth upto 50 m and lift upto 1.5m , disposed soil to be levelled and neatly dressed in all kinds of soil to be levelled and neatly dressed in all kinds of soil for clearing the canal bed by desilting
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
od34269/2019_2020/P2 : Cement concrete 1:4:7 using 20mm metal to lines and levels including proper compacting curing , watering etc. complete with all leads and lift etc. complete as per specification or as directed by Engineer in chaege
od34270/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.
Scheme 8: (Rectificatio of Anayadi distributory between chainage 1720 m to 1780 m)
10.1 : Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
od34278/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth upto 50 m and lift upto 1.5m , disposed soil to be levelled and neatly dressed in all kinds of soil to be levelled and neatly dressed in all kinds of soil for clearing the canal bed by desilting
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
od34269/2019_2020/P2 : Cement concrete 1:4:7 using 20mm metal to lines and levels including proper compacting curing , watering etc. complete with all leads and lift etc. complete as per specification or as directed by Engineer in chaege
od34270/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.
M FAIZAL
Bidder Name
M FAIZAL
V. KRISHNANKUTTY
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .