Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.1 LAdmitted-Finance | -24.99% | ₹1.1 L | L1 | Admitted-Finance |
Tender Value
₹1.5 L
EMD Value
₹3,000
Closing Date
30 Dec 2025, 4:00 pmClosed
EXECUTIVE ENGINEER REW RAJOURI
OFFICE OF EXECUTIVE ENGINEER REW RAJOURI
Please Refer BOQ
2025_RDPR_298942_2
e-NIT No. 228 REW Rajouri of 2025 Dated 23-12-2025
Open Tender
Civil Works
90 days
RAJOURI
Please Refer Tender Documents
2 documents required · 2 mandatory
₹500
Executive Engineer REW Rajouri
₹3,000
28 Jan 2026
23 Dec 2025
31 Dec 2025
24 Dec 2025
30 Dec 2025
24 Dec 2025
Earth Work in Excavation by manual labour in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.All kinds of soil.
Providing & laying of dry solling hand packing, in foundation & Trecnhes incl all carraiges
Providing and lying in position cement concrete 1 cement:5fine sand:10 graded crushed stone aggregates 40mm size.excludingthe cost of centring and shuttering all work upto plinth Level
Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level.
Brick work with F.P.S. bricks of class designation 75 in foundation and plinth in:1cement : 6 coarse sand mortar.
Centring and shuttering including strutting, propping etc and removal of the formwork. A.Foundation,Footing,Base of Columns etc
B. Suspended Floor, Roofs ,Landing,etc
C, Edges of slab
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15 degree, landing balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding cost of centring, shuttering, finishing and reinforcement.1 cement: 1.5 coarse sand : 3 graded stone aggregates 20mm nominal size.
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete .
P/F of mild steel door/window frames and shutters complete job
6mm cement plaster to ceiling of mix 1:3
12mm thick cement plaster of 1 cement: 6 fine sand mix.
Cement concrete flooring 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete 50 mm thick with 20 mm nominal size stone aggregate.
Distempering with dry distemper of approved brand and manufacture (two or more coats) and of required shade on new work, over and including water thinnable priming coat to give an even shade
Providing and placing on terrace (at all floor levels) polyethylene water storage tank ISI : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank
Sand & bajri for an avg. lead of 30 Kms by MT and 100 m HL
Cement & steel for an avg. lead of 15 Kms by MT and 100 m HL
Bricks for an avg. lead of 80 Kms by MT and 100 m HL
Add Cost Of Sanitary fittings (all complete)
Installation of CIB
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.11 MB
BOQ_969553.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid