| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹16.1 LAccepted-AOC | 1 | Accepted-AOC Lowest bidder | |
| 2 | 1₹17.7 LRejected-AOC KAVIKKUNNEL H KUNNACKAL P O MUVATTUPUZHA | MUVATTUPUZHA | KERALA | 1 | Rejected-AOC Second lowest bidder | |
| 3 | 2₹19.4 L+₹1.7 L (9.66%)Rejected-AOC | 2 | Rejected-AOC Third lowest bidder | |
| 4 | 3₹22.7 L+₹5.0 L (28.3%)Rejected-AOC | 3 | Rejected-AOC Highest bidder |
Tender Value
₹20.1 L
EMD Value
₹50,000
Closing Date
25 Oct 2019, 5:00 pmClosed
Executive Engineer
Executive Engineer Additional irrigation Division Thrissur
SDRF Desilting of Wadakkanchery River in Wadakkanchery Municipality
2019_Irrig_310715_1
6/EE/2019-2020Retender
Open Tender
Civil Works - Others
Item Rate
120 days
Wadakkanchery
Please refer Tender documents.
6 documents required · 6 mandatory
₹3,024
online
₹50,000
7 Jan 2020
18 Oct 2019
28 Oct 2019
18 Oct 2019
25 Oct 2019
18 Oct 2019
Amount
SCHEME 1-Up stream of Attampatta Chira
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil as per the direction of department officers at site.
SCHEME 2 - Down stream of Attampatta Chira
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil as per the direction of department officers at site.
SCHEME 3 -Up Stream of Peringiri Chira
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil as per the direction of department officers at site.
SCHEME 4 - Up Stream of Pallimanna Palam
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil as per the direction of department officers at site.
SCHEME 5 - Down Stream of pallimanna Palam
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil as per the direction of department officers at site.
SCHEME 6 - Up Stream of Chalipadam Palam
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil as per the direction of department officers at site.
SCHEME 7- Down Stream of Chalipadam Palam
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil as per the direction of department officers at site.
SCHEME 8- Up Stream of Kalamkund Valiya Palam
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil as per the direction of department officers at site.
SCHEME 9 - Down Stream of kialamkund Valiya Palam
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil as per the direction of department officers at site.
SCHEME 10 - Down Stream of Niliyara Chira
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil as per the direction of department officers at site.
SCHEME 11- Down Stream of Neliyara Chira
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil as per the direction of department officers at site.
SCHEME 12 Down stream of Neliyara Chira
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil as per the direction of department officers at site.
SCHEME 13 Down Stream of Neliyara chira
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil as per the direction of department officers at site.
SCHEME 14 - Down Stream of Neliyara Chira
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil as per the direction of department officers at site.
George Kutty
ccg constructions
OPUS CONSTRUCTIONS
Bidder Name
ccg constructions
George Kutty
P.C TOMY
OPUS CONSTRUCTIONS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_427148.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .