| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹10.0 L+₹538.67 (0.05%)Admitted-Finance POLICE LINE ROAD KUMOUR PITHORAGARH | L2 | Admitted-Finance | |
| 3 | Rejected-Technical | - | Rejected-Technical TQR not Qualified |
| Sl No | Description | Qty | Unit | Saun Engineering and Construction Co P Ltd L2 | M/s Kashnyal Engineers L1 |
|---|---|---|---|---|---|
| 1.00Excavation of foundation pits including all Earthworks Backfilling ,Leveling etc. | |||||
| 1.10 | DFR/SFR | 9.5 | cum | 8,312.5 ₹9,808.75 | 8,265 ₹9,752.7 Lowest |
| 1.20 | Ordinary Soil | 10 | cum | 6,900 ₹8,142 | 6,800 ₹8,024 Lowest |
| 2.00 | Random rubble masonary with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement:6 coarse sand:12 graded stone gregate 20 mm nominal size) upto plingth level with: cement mortor 1:6 (1 cement :6 corse sand) cost of all other material i.e cement, sand, stone etc. labour and T&P, leveling etc. making of weep hole . | 16 | Cum | 1,58,400 ₹1,86,912 Lowest | 1,59,072 ₹1,87,704.96 |
| 3.00 | Providing and laying in position specified grade of cement concrete including the cost of centering,shuttering, finishing all work up to plinth level 1:4:8(1cement:4Coasesand:8 Graded stone agreegate 20mm nominal size) for bottom pad | 4.95 | Cum | 56,925 ₹67,171.5 Lowest | 57,024 ₹67,288.32 |
| 4.00 | Providing and laying in position specified grade of cement concrete including the cost of centering,shuttering, finishing all work up to plinth level 1:2:4 (1cement:2Coase sand:4Graded stone agreegate 20mm nominal size) for apron work and top pad | 17.5 | Cum | 2,80,770 ₹3,31,308.6 | 2,80,350 ₹3,30,813 Lowest |
| 5.00Making a drain around the top of retaining wall to easy flow of rainy water accumulated on tower foundation for prevention of tower to extra water. | |||||
| 5.10 | Random rubble masonary with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12(1 cement:6 coarse sand:12 graded stone aggregate 20 mm nominal size) upto plingth level with: cement mortor 1:6(1 cement :6 corse sand) cost of all other material i.e cement, sand, stone etc. labour and T&P, leveling etc 60*0.5*0.5) | 15 | Cum | 1,49,100 ₹1,75,938 Lowest | 1,49,160 ₹1,76,008.8 |
| 5.20 | CC in ratio 1:4:8(1.7*0.15*30) | 6.75 | Cum | 77,962.5 ₹91,995.75 | 77,692.5 ₹91,677.15 Lowest |
| 5.30 | CC in ratio 1:2:4 (1.0*0.15*30) | 4.5 | Cum | 72,225 ₹85,225.5 | 72,135 ₹85,119.3 Lowest |
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
30 Oct 2025, 5:00 pmClosed
SE(OandM)Haldwani
SE(OandM)Office Haldwani
Work of Construction of Retaining Wall, Drain and Apron Work At Tower Location no 112 of 132 KV Chandak Lohaghat Line under 132 KV OandM Division, PTCUL, Almora
2025_PTC13_87629_1
05/2025-26
Open Tender
Electrical Works
Item Rate
180 days
Almora
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
Yes
Executive Engineer, OandM Division, PTCUL, Almora
₹30,000
Yes
SE(OandM)Office Haldwani
28 Nov 2025
10 Oct 2025
31 Oct 2025
10 Oct 2025
30 Oct 2025
10 Oct 2025
17 Oct 2025
Excavation of foundation pits including all Earthworks Backfilling ,Leveling etc.
DFR/SFR
Ordinary Soil
Random rubble masonary with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement:6 coarse sand:12 graded stone gregate 20 mm nominal size) upto plingth level with: cement mortor 1:6 (1 cement :6 corse sand) cost of all other material i.e cement, sand, stone etc. labour and T&P, leveling etc. making of weep hole .
Providing and laying in position specified grade of cement concrete including the cost of centering,shuttering, finishing all work up to plinth level 1:4:8(1cement:4Coasesand:8 Graded stone agreegate 20mm nominal size) for bottom pad
Providing and laying in position specified grade of cement concrete including the cost of centering,shuttering, finishing all work up to plinth level 1:2:4 (1cement:2Coase sand:4Graded stone agreegate 20mm nominal size) for apron work and top pad
Making a drain around the top of retaining wall to easy flow of rainy water accumulated on tower foundation for prevention of tower to extra water.
Random rubble masonary with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12(1 cement:6 coarse sand:12 graded stone aggregate 20 mm nominal size) upto plingth level with: cement mortor 1:6(1 cement :6 corse sand) cost of all other material i.e cement, sand, stone etc. labour and T&P, leveling etc 60*0.5*0.5)
CC in ratio 1:4:8(1.7*0.15*30)
CC in ratio 1:2:4 (1.0*0.15*30)
12 mm cement Plaster of mix 1:4 (1 Cement : 4 Coarse sand
Saun Engineering and Construction Co P Ltd (BID ID -404609)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
BOQ_104131.xls
BOQ • 0.28 MB
PQR5.xls
Other Document • 0.16 MB
TenderDoc05.pdf
Tender Documents • 1.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .