Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 LAccepted-AOC | ₹8.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹8.1 L+₹5,936.24 (0.74%)Rejected-AOC | ₹8.1 L+₹5,936.24 (0.74%) | L2 | Rejected-AOC L2 |
| 3 | L3₹8.1 L+₹8,315.39 (1.04%)Rejected-AOC | ₹8.1 L+₹8,315.39 (1.04%) | L3 | Rejected-AOC L3 |
| 4 | L4₹8.4 L+₹35,586.58 (4.43%)Rejected-Finance KARULAI GP | ₹8.4 L+₹35,586.58 (4.43%) | L4 | Rejected-Finance L4 |
| 5 | L5₹8.9 L+₹86,420.47 (10.8%)Rejected-Finance | ₹8.9 L+₹86,420.47 (10.8%) | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | ABOOBACKER A V L5 | SUDEVAN T L3 | E. ARAVINDAKSHAN L2 | A.V. MOOSAKUTTY L1 | ABDUL LATHEEF L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00pre monsoon works 2026 | ||||||||
| 1.00 | 55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface. | 1.03 | cum | 12,573.12 ₹12,937.74 | 1,165 ₹1,198.79 Lowest | 11,435.55 ₹11,767.18 | 11,351.73 ₹11,680.93 | 11,854.66 ₹12,198.45 |
| 1.00 | 55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface. | 5.55 | cum | 5,586.6 ₹31,005.63 | 5,165 ₹28,665.75 | 5,081.14 ₹28,200.33 | 5,043.9 ₹27,993.65 Lowest | 5,267.36 ₹29,233.85 |
| 1.00 | 55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a) | 1.03 | cum | 2,552.03 ₹2,626.04 | 2,359 ₹2,427.41 | 2,321.13 ₹2,388.44 | 2,304.11 ₹2,370.93 Lowest | 2,406.2 ₹2,475.98 |
| 1.00 | 55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement. | 5.07 | cum | 2,467.74 ₹12,511.44 | 2,282 ₹11,569.74 | 2,244.47 ₹11,379.46 | 2,228.01 ₹11,296.01 Lowest | 2,326.73 ₹11,796.52 |
| 1.00 | OD43538/2026-2027:Engaging Man Mazdoor for lifting , removing and replacing the cover slabs for
clearing the chocked culvert and drains etc. complete | 144 | each | 1,087.28 ₹1,56,568.32 | 1,005 ₹1,44,720 | 988.9 ₹1,42,401.6 | 981.65 ₹1,41,357.6 Lowest | 1,025.15 ₹1,47,621.6 |
| 1.01 | OD43577/2026-2027:Filling up potholes with bituminous ready mix compound (25kg) and compacting by ramming to get a compact surface including of cost of material, laying charges, transportation to site etc complete Rate is arrived for a bag of 25kg | 25 | each | 839.01 ₹20,975.25 | 776 ₹19,400 | 763.1 ₹19,077.5 | 757.5 ₹18,937.5 Lowest | 791.07 ₹19,776.75 |
| 1.01 | OD43539/2026-2027:Engaging hydraulic excavator for earth removal including fuel and staff charge. | 150 | hour | 1,474.99 ₹2,21,248.5 | 1,364 ₹2,04,600 | 1,341.54 ₹2,01,231 | 1,331.7 ₹1,99,755 Lowest | 1,390.7 ₹2,08,605 |
| 1.01 | OD43540/2026-2027:Engaging tipper (5 cum) for loading and unloading materials. (Hourly basis) | 150 | cum | 790.18 ₹1,18,527 | 730 ₹1,09,500 | 718.69 ₹1,07,803.5 | 713.41 ₹1,07,011.5 Lowest | 745.02 ₹1,11,753 |
| 1.01 | OD43541/2026-2027:Cutting of grass and light jungle using brush cutter with all expenses | 199 | hour | 381.15 ₹75,848.85 | 352 ₹70,048 | 346.67 ₹68,987.33 | 344.12 ₹68,479.88 Lowest | 359.37 ₹71,514.63 |
Tender Value
₹8.5 L
EMD Value
₹21,180
Closing Date
25 Jun 2026, 2:00 pmClosed
ASSISTANT EXECUTIVE ENGINEER , PWD ROADS SUBDIVI
ASSISTANT EXECUTIVE ENGINEER , PWD ROADS SUBDIVISION PONNANI
Pre monsoon works
2026_PWD_856481_1
PWD/RB/TR/8848/2026_5_1_1/1
Open Tender
Civil Works - Roads
Item Rate
30 days
PONNANI
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,870
Yes
₹21,180
Yes
3 Aug 2026
18 Jun 2026
27 Jun 2026
18 Jun 2026
25 Jun 2026
18 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1pre monsoon works 2026 | |||||
| 1.001 | 55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface. | 1 | cum | - | - |
| 1.002 | 55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface. | 1 | cum | - | - |
| 1.003 | 55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a) | 1 | cum | - | - |
| 1.004 | 55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement. | - | cum | - | - |
| 1.005 | OD43538/2026-2027:Engaging Man Mazdoor for lifting , removing and replacing the cover slabs for
clearing the chocked culvert and drains etc. complete | - | each | - | - |
| 1.006 | OD43577/2026-2027:Filling up potholes with bituminous ready mix compound (25kg) and compacting by ramming to get a compact surface including of cost of material, laying charges, transportation to site etc complete Rate is arrived for a bag of 25kg | - | each | - | - |
| 1.007 | OD43539/2026-2027:Engaging hydraulic excavator for earth removal including fuel and staff charge. | - | hour | - | - |
| 1.008 | OD43540/2026-2027:Engaging tipper (5 cum) for loading and unloading materials. (Hourly basis) | - | cum | - | - |
| 1.009 | OD43541/2026-2027:Cutting of grass and light jungle using brush cutter with all expenses | - | hour | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1447673.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
SBD.pdf
Tender Documents • 1.64 MB
BOQ_1447673.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .