Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LAccepted-AOC HIMACHAL PRADESH HP | LAHUL AND SPITI | HIMACHAL PRADESH | 175133 | ₹1.2 L | L1 | Accepted-AOC aoc |
| 2 | L2₹1.5 LRejected-AOC R O VILL POST OFFICE MUMTA TEHSIL NAGROTA BAGWAN | ₹1.5 L | L2 | Rejected-AOC REJECTED |
| 3 | L3₹1.5 LRejected-AOC VPO BAGLI TEHSIL DHARAMSHALA DISTT KANGRA H P | DHARAMSHALA | KANGRA | HIMACHAL PRADESH | ₹1.5 L | L3 | Rejected-AOC rejected |
| 4 | L4₹1.5 LRejected-AOC | ₹1.5 L | L4 | Rejected-AOC rejected |
Tender Value
₹1.5 L
EMD Value
₹1,495
Closing Date
16 Mar 2026, 10:00 amClosed
Sr. Executive Engineer, ED, HPSEBL Palampur
O/o Sr. Executive Engineer, ED, HPSEBL Palampur
Tender for A. Providing SOP to WSS Service Tank Padehar by providing 3 Phase LT Line in E Section Parour under Electrical Sub Division, HPSEBL Maranda.B. Providing SOP to WSS Service Tank at GSSS Parour by providing 3 Phase LT Line in E Section
2026_HPSEB_130861_1
PED-120/2025-26
Open Tender
Electrical Works
90 days
Palampur
Please refer tender documents
4 documents required · 4 mandatory
₹590
₹1,495
30 May 2026
9 Mar 2026
17 Mar 2026
9 Mar 2026
16 Mar 2026
9 Mar 2026
Erection of LT Line
Steel Tubular Pole 8 Mtr. Long
RCC Muff
Prov. Shackle insulator with D-Iron
Prov. Egg Insulator
Prov. Eye Hook Bolt
LT Earthing Complete
LT Stay Set Complete
Stay Wire 7/3.15mm @ 6.0Kg.Per Stay Set
Prov. AAAC 7/3.15 mm (55mm2)
Prov. LT cable 3.5C 35 mm2 Havells MR with 30% discount
Prov. LTAC Three Phase kWH Meter (10-60A)
Prov. Full Clamp
M.S Nuts & Bolts (off sizes)
Prov. Aluminium Paint
Add Dismantling charges of off size conductor i.e de-string removal of conductor from insulator and rolling of conductor for 0.090x4=0.360 km
Add Earthing of Pole
Add Erection charges of ST Pole 8 Mtr. Long
Add Erection charges of LT Stay Set
Add Erection charges of AAAC 7/3.15 mm sq i.e string & sagging, binding with insulator for 0.100x4=0.400 km
Add Erection charges of LT cable 0.010 mtr
Add Transportation Charges
Steel Tubular Pole 8 Mtr. Long
RCC Muff
Prov. Egg Insulator
Prov. Eye Hook Bolt
LT Stay Set Complete
Stay Wire 7/3.15mm @ 6.0Kg.Per Stay Set
Prov. LT AB Cable 3.5x35 mm2 Havells MR with 30% discount
Prov. LTAC Three Phase kWH Meter (10-60A)
LT Earthing Complete
Prov. Anchoring assemby
Prov. Suspension assembly
Prov. façade hooks
Prov. full clamp for stay wire
M.S Nuts & Bolts (off sizes)
Prov. Aluminium Paint
Add Erection charges of 3.5 core 35 mm2 LT Power Cable for 0.060 km
Add Transportation Charges
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
tbidddd.rar
Tender Documents • 1.91 MB
BOQ_193501.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid