Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹104.1 CrAccepted-AOC | ₹104.1 Cr | L1 | Accepted-AOC Below rate |
| 2 | L2₹111.2 Cr+₹7.1 Cr (6.81%)Rejected-AOC PLAT NO 943 54TH STREET T V S COLONY ANNANAGAR WEST EXTENSION CHENNAI PIN 600 101 | CHENNAI | CHENNAI | TAMIL NADU | 600101 | ₹111.2 Cr+₹7.1 Cr (6.81%) | L2 | Rejected-AOC Above rate |
| 3 | L3₹120.6 Cr+₹16.4 Cr (15.7%)Rejected-AOC PLOT NO 64 DOOR NO 2 4TH EAST STREET KAMARAJ NAGAR THIRUVANMIYUR CHENNAI 600 041 | CHENNAI | THIRUVANMIYUR | TAMIL NADU | 600041 | ₹120.6 Cr+₹16.4 Cr (15.7%) | L3 | Rejected-AOC Above rate |
| 4 | L4₹132.3 Cr+₹28.2 Cr (27.1%)Rejected-AOC | ₹132.3 Cr+₹28.2 Cr (27.1%) | L4 | Rejected-AOC Above rate |
| 5 | L5₹132.6 Cr+₹28.5 Cr (27.3%)Rejected-AOC 155 A KAIKATTIPUDUR TIRUPPUR ROAD AVINASHI 641654 | AVINASHI | TIRUPPUR | TAMIL NADU | 641654 | ₹132.6 Cr+₹28.5 Cr (27.3%) | L5 | Rejected-AOC Above rate |
| Sl No | Description | Qty | Unit | Koya and Company Construction Limited L4 | ECO PROTECTION ENGINEERS PVT LTD L2 | KEYEM INFRA PROJECT PRIVATE LIMITED L3 | SRI VENKATACHALAPATHY CONSTRUCTIONS PRIVATE LIMITED L1 | VR WATER INFRA COMPANY L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00Schedule - 1 - Distribution System | ||||||||
| 1.01Earthwork - excavating and depositing on bank with an initial lead of 10 m including bailing out water with lifts indicated below including guarding and lighting in trenches for laying of pipes in Hard stiff clay, stiff black cotton, hard red earth, shales, murram gravel, stoney earth and earth mixed with small boulders and hard gravelly soil (Ordinary soil) etc SS20 B. all complete as per standard specifications and as directed by the Departmental Officers. | ||||||||
| 1.02 | 110mm | 65,000.25 | M³ | 290 ₹1,88,50,072.5 | 73 ₹47,45,018.25 Lowest | 250 ₹1,62,50,062.5 | 300 ₹1,95,00,075 | 316.1 ₹2,05,46,579.03 |
| 1.03 | 125mm | 5,781.04 | M³ | 290 ₹16,76,501.6 | 80 ₹4,62,483.2 Lowest | 250 ₹14,45,260 | 300 ₹17,34,312 | 316.1 ₹18,27,386.74 |
| 1.04 | 140mm | 2,891.7 | M³ | 290 ₹8,38,593 | 80 ₹2,31,336 Lowest | 250 ₹7,22,925 | 300 ₹8,67,510 | 316.1 ₹9,14,066.37 |
| 1.05 | 160mm | 3,800.48 | M³ | 290 ₹11,02,139.2 | 80 ₹3,04,038.4 Lowest | 250 ₹9,50,120 | 300 ₹11,40,144 | 316.1 ₹12,01,331.73 |
| 1.06 | 180mm | 1,533 | M³ | 290 ₹4,44,570 | 100 ₹1,53,300 Lowest | 250 ₹3,83,250 | 300 ₹4,59,900 | 316.1 ₹4,84,581.3 |
| 1.07 | 200mm | 3,782.24 | M³ | 290 ₹10,96,849.6 | 112 ₹4,23,610.88 Lowest | 250 ₹9,45,560 | 300 ₹11,34,672 | 316.1 ₹11,95,566.06 |
| 1.08 | 225mm | 682.56 | M³ | 290 ₹1,97,942.4 | 112 ₹76,446.72 Lowest | 250 ₹1,70,640 | 300 ₹2,04,768 | 316.1 ₹2,15,757.22 |
| 1.09 | 250mm | 5,426.88 | M³ | 290 ₹15,73,795.2 | 112 ₹6,07,810.56 Lowest | 250 ₹13,56,720 | 300 ₹16,28,064 | 316.1 ₹17,15,436.77 |
Tender Value
₹114.5 Cr
EMD Value
₹1.1 Cr
Closing Date
5 Mar 2026, 3:00 pmClosed
Commissioner
Azad Road,Karur
Karur City Municipal Corporation_KFW Scheme_Providing Comprehensive Intergrated Water Supply System to Karur Corporation with operation and maintenance for the period of 5 years package 2
2026_MAWS_652444_2
E1/6051/2025
Open Tender
Civil Works
Item Rate
730 days
KCMC
Please Refer Tender Documents
5 documents required · 5 mandatory
₹0
₹1.1 Cr
Karur
9 Sept 2026
9 Feb 2026
5 Mar 2026
9 Feb 2026
5 Mar 2026
20 Feb 2026
9 Feb 2026 - 5 Mar 2026
9 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Schedule - 1 - Distribution System | |||||
| 1.01 | Earthwork - excavating and depositing on bank with an initial lead of 10 m including bailing out water with lifts indicated below including guarding and lighting in trenches for laying of pipes in Hard stiff clay, stiff black cotton, hard red earth, shales, murram gravel, stoney earth and earth mixed with small boulders and hard gravelly soil (Ordinary soil) etc SS20 B. all complete as per standard specifications and as directed by the Departmental Officers. | - | - | - | - |
| 1.02 | 110mm | 65,000.25 | M³ | - | - |
| 1.03 | 125mm | 5,781.04 | M³ | - | - |
| 1.04 | 140mm | 2,891.7 | M³ | - | - |
| 1.05 | 160mm | 3,800.48 | M³ | - | - |
| 1.06 | 180mm | 1,533 | M³ | - | - |
| 1.07 | 200mm | 3,782.24 | M³ | - | - |
| 1.08 | 225mm | 682.56 | M³ | - | - |
| 1.09 | 250mm | 5,426.88 | M³ | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 3.96 MB
BIDDocumentVol1P2.pdf
Tender Documents • 2.79 MB
Drawingvolume4P2.pdf
Tender Documents • 34.18 MB
BIDDocumentVol5EASAP2.pdf
Tender Documents • 11.57 MB
SPECIAL.pdf
Tender Documents • 0.07 MB
BIDDocumentVol2P2.pdf
Tender Documents • 1.18 MB
BOQ_783058.xls
BOQ • 0.81 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .