Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.7 LAccepted-AOC NEAR NEELAMMA VEPACHETTU ASSAM GARDENS VISAKHAPATNAM 530 020 | VISAKHAPATANAM | ANDHRA PRADESH | 530020 | L1 | Accepted-AOC Being L1 bidder | |
| 2 | L2₹26.7 L+₹3,900 (0.15%)Rejected-Finance DOOR NO 15 1 141 BHAVANA ENCLAVE 1 NEAR HOTEL GRAND BAY MAHARANIPETA NOWAROJI ROAD VISAKHAPATNAM 530002 | VISAKHAPATNAM | VISAKHAPATNAM | ANDHRA PRADESH | 530002 | L2 | Rejected-Finance Being not L1 bidder | |
| 3 | L3₹27.0 L+₹26,506.55 (0.99%)Rejected-Finance | L3 | Rejected-Finance Being not L1 bidder | |
| 4 | L4₹27.3 L+₹58,022.22 (2.17%)Rejected-Finance D NO LIG 98 RAJEEV NAGAR KURMANNAPALEM VISAKHAPATNAM 530 048 | VISAKHAPATANAM | ANDHRA PRADESH | 530048 | L4 | Rejected-Finance Being not L1 bidder | |
| 5 | L5₹28.8 L+₹2.1 L (7.96%)Rejected-Finance D NO 38 39 86 3 4 SAIKRUPA RESIDENCY 104 AREA BAPUJI NAGAR MARRIPALEM VISAKHAPATNAM 530 007 | VISAKHAPATANAM | ANDHRA PRADESH | 530007 | L5 | Rejected-Finance Being not L1 bidder |
| Sl No | Description | Qty | Unit | VENKATESWARA ENGINEERS AND CONTRACTORS L5 | Bhuvaneswari Electrical Works L1 | MSN ENGINEERING WORKS L6 | GVR ENGINEERING WORKS L3 | SRIESWARI ENTERPRISES L2 | RATNA ENTERPRISES L8 | MONITOR ENGINEERING WORKS L4 | ALPHA ENGINEERING CONSTRUCTIONS L7 | M/s SS Engineering Enterprises L9 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches, not exc 1.5 m wide and not exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out all excavated material in soft / loose soil complete all as specified and directed. | 450.07 | Cum | 160 ₹72,011.2 Lowest | 180 ₹81,012.6 | 190 ₹85,513.3 | 190 ₹85,513.3 | 210 ₹94,514.7 | 200 ₹90,014 | 183 ₹82,362.81 | 200 ₹90,014 | 200 ₹90,014 |
| 2.00 | All as per Sl item No. 1.00 above but exc 1.5 m & not exc 3.0 m in depth | 0.38 | Cum | 320 ₹121.6 | 200 ₹76 | 250 ₹95 | 200 ₹76 | 300 ₹114 | 200 ₹76 | 193 ₹73.34 Lowest | 220 ₹83.6 | 320 ₹121.6 |
| 3.00 | Returning, filling in trenching with soil and including spreading, levelling, watering and well ramming in layers not exceeding 25 cm thick complete all as specified and as directed. | 245.62 | Cum | 100 ₹24,562 | 60 ₹14,737.2 | 100 ₹24,562 | 40 ₹9,824.8 | 100 ₹24,562 | 120 ₹29,474.4 | 33 ₹8,105.46 Lowest | 100 ₹24,562 | 65 ₹15,965.3 |
| 4.00 | Removing of excavated surplus soil to a distance not exc 50 m and depositing where directed at a level n. exc. 1.5 m above the starting point complete all as specified and directed. | 208.61 | Cum | 120 ₹25,033.2 | 120 ₹25,033.2 | 100 ₹20,861 | 45 ₹9,387.45 | 100 ₹20,861 | 120 ₹25,033.2 | 43 ₹8,970.23 Lowest | 120 ₹25,033.2 | 100 ₹20,861 |
| 5.00 | M&L sand cushioning with clean and dry stone crushed stone dust in trenches for protection of UG cable and including punning down complete all as specified and directed.
Note:- Punned thickness of stone dust coushioning shall only measured and paid. | 146.06 | Cum | 950 ₹1,38,757 | 700 ₹1,02,242 | 1,000 ₹1,46,060 | 600 ₹87,636 Lowest | 600 ₹87,636 Lowest | 700 ₹1,02,242 | 603 ₹88,074.18 | 800 ₹1,16,848 | 1,500 ₹2,19,090 |
| 6.00 | Supply & laying sub class 'B', class designation 75 bricks of old size, laid over sand cushioning along alignment of cable as protection to cable in trenches including taking out old bricks complete all as specified and directed.
Note : Sand cushioning will measured and paid seperately. | 15,680 | Each | 6 ₹94,080 | 5 ₹78,400 Lowest | 6 ₹94,080 | 5.6 ₹87,808 | 7 ₹1,09,760 | 6 ₹94,080 | 6 ₹94,080 | 6 ₹94,080 | 10 ₹1,56,800 |
| 7.00 | S&F for GI pipe light grade 50 mm bore galvanised steel tubing, light grade with necessary fittings, laid under road crossing, for cable protection including taking down existing un-serviceable GI pipe of any description complete all as specified and directed. | 24 | RM | 650 ₹15,600 | 250 ₹6,000 Lowest | 500 ₹12,000 | 345 ₹8,280 | 500 ₹12,000 | 350 ₹8,400 | 323 ₹7,752 | 300 ₹7,200 | 650 ₹15,600 |
| 8.00 | All as per Sl. Item No. 7.00 here in before but of size 80 mm | 24 | RM | 750 ₹18,000 | 450 ₹10,800 Lowest | 750 ₹18,000 | 545 ₹13,080 | 750 ₹18,000 | 750 ₹18,000 | 553 ₹13,272 | 700 ₹16,800 | 1,000 ₹24,000 |
| 9.00 | M&L for cutting the tarmac / hard standings in road and excavating trenches across the road in size not exceeding 0.45 m wide and 0.6 m depth for laying cable including refilling earth & making good top surface of the disturbed portion with 100mm thick PCC 1:3:6 or bituminous mix as per existing & matching with the surroundings complete all as specified and directed.
Note : Rate quoted shall deemed to inclusive of road cutting of any description, earth work excavation and making good on top with 100 thick PCC complete. | 11 | RM | 400 ₹4,400 | 1,600 ₹17,600 | 4,500 ₹49,500 | 250 ₹2,750 | 150 ₹1,650 Lowest | 1,500 ₹16,500 | 1,123 ₹12,353 | 300 ₹3,300 | 1,000 ₹11,000 |
| 10.00 | Supply & laying LT XLPE insulated, armoured heavy duty electric cable with alumimium conductor, 1100 volts grade, cross sectional area 25 Sqmm x 4 Core, laid in trenches / duct / on pole including taking down existing un-serviceable cable complete all as specified and directed. | 400 | RM | 235 ₹94,000 | 170 ₹68,000 | 110 ₹44,000 Lowest | 190 ₹76,000 | 200 ₹80,000 | 240 ₹96,000 | 193 ₹77,200 | 220 ₹88,000 | 235 ₹94,000 |
Tender Value
₹42 L
EMD Value
₹84,000
Closing Date
15 Sept 2025, 6:00 pmClosed
Garrison Engineer Utility-I Visakhapatnam
Garrison Engineer Utility-I Near Samudrika Naval Base Post Visakhapatnam -530 014
REPAIR/ MAINT OF LT FEEDER PILLAR BOXES, LT UG CABLES AND CONNECTED WKS OF LT DISTR SYSTEM INCL ATTENDING FUSE OFF CALL AT 9IRSD, ASHOKA PARK, MPETTA, NSV AND NSB AREA UNDER AGE E/M NO-II OF GE (U-I) VISAKHAPATNAM
2025_MES_727605_1
8780/E8
Open Tender
Electrical and Maintenance Works
Item Rate
270 days
Garrison Engineer Utility-I Visakhapatnam
As per NIT
7 documents required · 7 mandatory
₹500
Garrison Engineer Utility-I
₹84,000
Yes
17 Nov 2025
23 Aug 2025
17 Sept 2025
23 Aug 2025
15 Sept 2025
9 Sept 2025
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .