| 1 | L1₹11.7 LAccepted-AOC | L1 | Accepted-AOC L1 bidder | |
| 2 | L2₹11.8 L+₹10,657.43 (0.91%)Rejected-AOC KERALA KL KERALA | L2 | Rejected-AOC L2 bidder | |
| 3 | L3₹12.4 L+₹76,605 (6.56%)Rejected-AOC KERALA KL KERALA | ALAPPUZHA | KERALA | 686534 | L3 | Rejected-AOC L3 bidder | |
| 4 | L4₹12.9 L+₹1.2 L (10.7%)Rejected-AOC KAYANNA BAZAR KAYANNA P O KOZHIKODE | L4 | Rejected-AOC L4 bidder | |
| 5 | L5₹13.4 L+₹1.7 L (14.3%)Rejected-AOC | L5 | Rejected-AOC L5 bidder |
| Sl No | Description | Qty | Unit | VK BALAN L2 | N.P. KANARAN L3 | KAIRALI LABOUR CONTRACT CO OPERATIVE SOCIETY LIMITED NO D3251 L4 | JOBIN K CHERIYAN L1 | MADATHUMBHAGAM LABOUR CONTRACT CO-OPERATIVE SOCIETY L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00Left bank main canal between ch: 9/600 and 9/800 km | ||||||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 240 | sqm | 12.92 ₹3,100.8 | 13.64 ₹3,273.6 | 14 ₹3,360 | 12.81 ₹3,074.4 Lowest | 14.64 ₹3,513.6 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 226.04 | cum | 183.15 ₹41,398.86 | 193 ₹43,625.33 | 200.35 ₹45,286.71 | 181.5 ₹41,025.9 Lowest | 207.52 ₹46,907.41 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 56.17 | cum | 5,639.75 ₹3,16,812.96 | 5,956 ₹3,34,578.3 | 6,187.5 ₹3,47,582.81 | 5,588.75 ₹3,13,948.03 Lowest | 6,390.26 ₹3,58,972.86 |
| 1.00 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 376.64 | sqm | 596.9 ₹2,24,816.42 | 630 ₹2,37,283.2 | 654.5 ₹2,46,510.88 | 591.5 ₹2,22,782.56 Lowest | 676.33 ₹2,54,732.93 |
| 1.00 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 64.2 | cum | 6,092.08 ₹3,91,111.54 | 6,431 ₹4,12,870.2 | 6,680.75 ₹4,28,904.15 | 6,036.99 ₹3,87,574.76 Lowest | 6,902.79 ₹4,43,159.12 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 17.39 | cum | 6,566.15 ₹1,14,172.22 | 6,933 ₹1,20,551 | 7,200 ₹1,25,193.6 | 6,506.78 ₹1,13,139.89 Lowest | 7,439.97 ₹1,29,366.2 |
| 1.01 | 13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand) | 387.34 | sqm | 225.59 ₹87,380.03 | 238.96 ₹92,558.77 | 248.31 ₹96,180.4 | 223.55 ₹86,589.86 Lowest | 255.62 ₹99,011.85 |
Tender Value
₹15.2 L
EMD Value
₹38,075
Closing Date
22 Aug 2025, 6:55 pmClosed
Executive Engineer
O/ O Executive Engineer KyIP Division Perambra
Rectification of canal
2025_Irrig_786433_1
IRR/PI/TR/3571/2025_5_3_2/1
Open Tender
Civil Works - Canal
Item Rate
180 days
Perambra
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹38,075
Yes
24 Oct 2025
14 Aug 2025
25 Aug 2025
14 Aug 2025
22 Aug 2025
14 Aug 2025
14 Aug 2025 - 22 Aug 2025
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .