Tender Value
₹97.6 L
EMD Value
₹2.0 L
Closing Date
13 Jul 2026, 5:00 pm3d left
EE TA to SE EC
Eastern Circle, Jalsampad Bhawan 8th Floor Kol 91
Protection to the left embankment of River Hooghly near Debdwar Park for a length of 150 m within Ward No. 30 of North Barrackpore Municipality, PS Noapara, District North 24 Parganas
2026_IWD_1028970_1
WBIW/TA/EC/NIT-01(e)/2026-27 (2nd Call)
Open Tender
CIVIL WORKS
Debdwar Park, Noapara
Please refer Tender documents
7 documents required · 7 mandatory
₹2.0 L
Yes
22 Jun 2026
22 Jun 2026
14 Jul 2026
22 Jun 2026
13 Jul 2026
22 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying Jhaw/Eucalyptus bullah piles at work site,including dressing and making one end pointed. Note: Diameter of pile to be measured at a distance of 1.5m from the thicker end.
(iii) 15 cm av. Diameter. | - | Metre | - | - |
| 2 | Labour for driving Jhaw/Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position,protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles.
Note: 1) Payment to be made on the length driven into the ground. Diameter to be measured at 1.5m. from the thicker end.
(iii) 15 cm av. Diameter. | - | Metre | - | - |
| 3 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.
(i) Pakur Variety.Cement:PPC/PSC/OPC 33. | - | Cum. | - | - |
| 4 | Hire and labour charges for shuttering with centering and necessary staging upto 4m using approved stout props and thick hardwood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor).
(f) 25 mm to 30 mm shuttering without staging in foundation | - | Sqm. | - | - |
| 5 | Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. | - | Sqm. | - | - |
| 6 | Supplying, fitting and placing HYSD bar reinforcement in Sub-structure including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications and direction of Engineer-in-charge.Steel Materials . 2(ii)b. Tor Steel rods / HYSD bars / TMT bars (JSW/ JSPL / Shyam / SRMB/ /SSL/ BMASL / Electrosteel)(Fe 415 /Fe 500 /Fe 500D, conforms to IS:1786) | 1 | Tonne | 1 | ₹1 |
| 7 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
(a) Depth of excavation not exceeding 1,500 mm. | - | Hundred Cum. | - | - |
| 8 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of,
E) Beyond 4.00 km and upto 5.00 km
NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking.
Note:-For Compensation for earth for land owned and arranged by the contractor add Rs. 25.00 per cum extra over rate of E/W for land owned/arrenged by the department. Royalty Chages on earth @ Rs.29.00 per Cum and Cesses charges @ Rs.5.30 per Cum(i.e Rs 15.00 per 100 cft),as per Govt.notification,which will be paid on production of necessary documents in support of payment made towards the royaltys and cesses | 1 | Cum. | - | - |
| 9 | SUPPLY OF DIFFERENT MATERIALS AS PER APPROVED SPECIFICATION.
Bricks / Jhama / Bats
Sorted & stacked at site.
Brick bats. | 1 | Cum. | 1 | ₹1 |
| 10 | Supplying at site and laying in position UV stabilized polypropylene woven geotextile of 430 gsm as filter, as per specification, including cost of preparing the bed, placing the geotextile as per profile with at least 15cm lapping, wherever required and anchorage at top, sewing / welding the overlapped portion, storage and transportation by all means, complete as per direction of the Engineer-in-charge. Note: 1. Payment to be made on measurement of finished surface without lapping, but including anchoring length at top. 2. Payment will be made subject to the result of 3rd Party Testing, to be done by the Engineer-in-charge departmentally. | - | Sqm. | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.37 MB
BOQ_2527252.xls
BOQ • 0.36 MB
2911.pdf
Tender Documents • 0.37 MB
Drawing_Serial_01.pdf
Tender Documents • 0.67 MB
BarChart1.pdf
Tender Documents • 0.18 MB
Corrigendum1.pdf
PDF • 0.43 MB
Download all tender documents and submit your bid