Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹17.8 Laccepted-aoc | ₹17.8 L | accepted-aoc |
Tender Value
₹18.5 L
EMD Value
₹18,600
Closing Date
20 Jul 2026, 3:00 pmClosed
Executive Engineer-XIV, Tirupati
Tirupati
Erection and removal of summer pendals and pendals for all festivals and Annual Brahmotsavams and GI sheet roofing for conducting Homa Mahotsavam during Karthika masam at Sri Kapileswara Swamy Temple Tirupati for the year 2026 27
964111
83/EE-XIV/TTD/2026-27
OPEN - NCB
Annual maintenance works
TIRUPATHI
5 documents required · 5 mandatory
₹656
₹18,600
2 Sept 2026
17 Jul 2026
17 Jul 2026
Hire charges for erection and removal of MS pipes Pendals with MS pipes 40 mm dia for veridical, horizontals bracings and roofing. The pendals are firmly fixed with bracings and with necessary frame work/rope etc., and the roof covered with thick white ceiling cloth along with all round frills (jallars) including anchoring to the ropes to the ground with suitable anchoring and necessary watch and ward against theft and fire accidents and incidental charges etc. complete as directed during execution. The rate quoted is including conveyance of all materials (Transportation charges) and labour charges for fixing etc., complete. The rate is for below mentioned calendar days.(The rate for pendals will be paid as per area of pendals measured on covering plan area).
for functions of 1 day
for functions of 3 days
for functions of 10 days
for functions of 30 days
Hire charges for erection and removal of flat/sloped roof M.S pipes pendals using 40mm MS pipes for verticals . horizontals and roof supports etc., fixing with, special type gripper MS clamps ( Nandu clamps) , extra horizontal bracings should be provided from at 2.40 m to roof level and jointing with special type gripper MS clamps ( Nandu clamps)for horizontal bracings and column roofing including earth work excavation in all soils (Except rock requiring blasting) to a depth of 0.40m to 0.60m. The vertical posts are to be fixed strongly with out any shaking. The roof shall be covered with G.I sheet/Aluminium sheet/Galvalume sheet and firmly fixed to the purlins etc., complete as directed during execution .The rate including conveyance and hire charges of all materials such as MS pips, Clamps, G.I sheet/Aluminium sheet/Galvalume sheet etc. and labour charges for fixing and removal etc., complete .
for functions of 1 day
for functions of 3 day
for functions of 10 days
for functions of 30 days
for functions of 120 days
Hire charges for providing White ceiling cloth for decorating the pendals and Mandapam with necessary frame work with decorative frills (jallars) around and border and decorative frills (jallars) at the centre with red or green colour or any other attractive colour wherever necessary etc., complete as directed during execution. The ceiling cloth should be pure white in colour and with out any patches and preferably new or neatly washed and should be in good condition through out the Festival or Ustvam period and should be removed after the same is over and should be repaired or replaced as and when torn out by any means including due to rain with out any extra cost .The rate quoted is including conveyance of all materials and labour charges for fixing etc., complete . The rate is for below mentioned calendar days .
for functions of 1 day
for functions of 3 days
for functions of 10 days
for functions of 30 days
Hire charges for providing Rain proof shelters of different spans with clear height of 16' at the ends and suitable height at centre with central unsupported span of ranging 60' to 80'. The shelter shall be provided with adequate MS girders, MS trusses, MS purlins, bracings, tie rods, anchorages, bolts & nuts etc., suitably designed with necessary anchors to the ground to withstand heavy wind and rain. The shelter shall be firmly tied with cross anchors at all required places using MS strands etc., using necessary bolts, nuts, etc., The entire roof shall be covered suitably with GI sheet/Aluminium sheets/Galvalume sheets firmly fixed to the purlins etc., with necessary bolts/screws, washers etc., so as to have perfect rain proof roof. Covering shall be made such that the shelter shall be totally rain proof during heavy rains and the rain water shall be properly drained. (This rate is applicable when structure is provided using roof trusses.)
for functions of 10 days
for functions of 30 days
Hire charges for providing Rain proof shelters of different spans with clear height of 16' at the ends and suitable height at centre with central unsupported span of ranging 60' to 80'. The shelter shall be provided with adequate MS girders, MS trusses, MS purlins, bracings, tie rods, anchorages, bolts & nuts etc., suitably designed with necessary anchors to the ground to withstand heavy wind and rain. The shelter shall be firmly tied with cross anchors at all required places using MS strands etc., using necessary bolts, nuts, etc. The entire roof shall be covered suitably with GI sheet/Aluminium sheets/Galvalume sheets firmly fixed to the purlins etc., with necessary bolts/screws, washers etc., so as to have perfect rain proof roof. Covering shall be made such that the shelter shall be totally rain proof during heavy rains and the rain water shall be properly drained. (This rate is applicable when structure is provided using roof trusses.). *Necessary rain water collection facility and drainage arrangement shall be made. The rate quoted is including conveyance of all materials and labour charges for fixing etc., complete . (The rate for pendals will be paid as per area of pendals measured on covering plan area). * The relevant conditions of the foot note mentioned at the end of these items/chapter applies. The rate is for below mentioned calendar days.
Hire charges for erection and removal of flat / sloped roof M.S pipes pendals using 40mm MS pipes using special type gripper MS clamps (Nandu clamps) for fixing horizontal bracings and at 2.40m to 2.70m level and jointing pins for horizontal bracings etc. The height of the roof should be between 9' to 12'. The entire roof shall be made of one layer of nylon net with opening of size 100 x 100 mm .The nylon net must be tied alround for stiffness and for tying at the ends. The entre roof is to be covered with PVC coated lacquered finish fabric of approved GSM (300 to 400) over the nylon net for providing shelter. Necessary tying arrangements to be made to the PVC fabric with nylon rope or any other suitable material to keep the same in position. (The rate is Excluding GST). The rate is including earth work excavation in all soils (except rock requiring blasting) to a depth of 0.40m to 0.60m the vertical posts are to be fixed strongly with out any shaking and including labour charges for all the operations such as loading, unloading, erection, watch, ward and conveyance etc., complete. * The relevant conditions of the foot note mentioned at the end of these items/chapter applies.*For a period of 04 Months from date of erection.
Hire charges for providing & fixing of good quality GI sheets ( 22 to 26 gauge)( plain or corrugated ) sheets to the available frame work for roof or sides for function/festival pendals. The rate quoted is including conveyance of all materials and labour charges for fixing etc., complete . The rate is for below mentioned calendar days.
for fucntions of 10 days
Supply of Rabbit wire mesh (G.I. Chicken mesh) of not less than 24 gauge
Supply of following materials of best quality as directed during execution.
G.I. Binding wire 16 Gauge
Hire charges for Supply of Tractor for pulling for conveyance of Chainlinks and turpalins from DPW store to Sri KT
Supply of the following labour as and when required by the dept., as directed during execution.
(b) Semi skilled work man ( 2nd class ) - (Carpenter / Stone cutter / Manson etc., )
Unskilled Work men (Man / Women mazdoors )
Hire charges of colour carpets including cost of charges for spreading and folding after completion of the Festival/ Function etc., as directed during execution. The rate quoted is including conveyance of all materials. The rate is for below mentioned calendar days .* The relevant conditions of the foot note mentioned at the end of these items/chapter applies.
- do - For 1 Days
- do - For 3 Days
- do - For 10 Days
- do - For 30 Days
Hire charges for erection and removal of barricading with M.S. frames made with MS hallow square tubes. The barrication provided such that it shall be 1.20m height above the ground level and fixed to the ground (Earth/CC road/B.T road )with base anchors made with MS angle/channels true to alignment. The barrication shall be strongly fixed without any shaking including providing inclined struts wherever necessary including labour charges for all the operations such as loading, unloading ,erection, removal etc., including conveyance charges to site both ways)and removing the same after completion of the festival and taking away the material etc., complete as directed during the execution .
for each function / festival for 1 day
for functions of 3 days
- do - For 10 Days
- do - For 12 Days
Hire charges for Core drilling machine including fuel charges and crew charges
Hire charges for erection and removal of temporary Dias at a height of 60 cms to 120 cms (2' 0" to 4' 0") from the floor/Ground level using MS pipe vertical supports with adjustable jockey and four sides supporting MS pipe bracing and top covering 19mm ply wood laid on M.S pipes frame work and should be made with out undulation. The rate quoted is including conveyance of all materials and labour charges for fixing etc., complete . The rate is for below mentioned calendar days. * The relevant conditions of the foot note mentioned at the end of these items/chapter applies.
for functions of 1 days
for functions of 12 days
for functions of 30 days
Hire Charges for erection and removal of Steps and landings system including necessary supporting structure, hand railing, etc., for finished item of work for providing access to different Gopurams, Vimanams, etc., with the following specification: a. The Steps/Landings should be provided with using Country wood/ Sliver Wood planks, reapers etc. of required size and thickness covering total width as directed during execution. b. The M.S pipes hand railing using 40 mm dia & higher size MS pipes with necessary verticals & horizontals shall be arranged on both sides of the steps. The same shall be strong enough wihout any shaking, etc. c. The Colour Carpet /Coir mat should be spread over on entire Steps and Landings (including Treads & Raisers) and fixed with suitable fixing materials as directed during execution. d. The entire steps/landings shall be supported with suitable supporting structure using MS pipes, special type gripper clams etc., wherever the width of steps/landings is more than 0.9 mtrs., adequate intermittent supports shall be provided. e. The supporting structure should be strong enough to carry the loads with required verticals, horizontals, cross bracings, etc., required as directed during execution as per the site conditions to withstand to heavy loads. Necessary firm base plates at the ground levels shall also be provided.
Hire charges for erection and removal of Shamiyanas with required posts, rope etc., including anchoring the ropes to the ground with suitable anchoring and incidental charges etc., complete as directed during execution. The rate quoted is including conveyance of all materials and labour charges for fixing etc., complete The rate is for below mentioned calendar days.The relevant conditions of the foot note mentioned at the end of these items/chapter applies.
for functions of 3 days
for functions of 10 days
Hire charges for providing of stainless steel hand wash trough with minimum four taps with necessary waste piope and fitting for draininig waste water inclidng loanding and unloanding, erection et., the rate is incluidng maintenance, watch and ward, against theft and fire accidents, repairs and replacement etc., complete during the said period. rate is including all taxes, transportation etc., complete.
Hire charges for supply, spreading and removing of PVC chairs including loand and unloading., the rate is including maintanance, watch and ward, against theft and fire accidents, repairs and replancements etc., complete during the said period. Rate is including all taxes, transportation etc., complete. do for 12 days
Hire charges for erection and removal of barricading with MS pipes at required places with MS pipes of 40mm diameter using 2.45 m long verticals and 3 to 6 metres horizontals. The barrication provided such that it shall be 2m above ground level and 0.45 m pipe embedded in the ground with necessary earth work excavation in all soils up to 0.45m to 0.60 m depth (except rock requiring chiselling). The Horizontals shall be in 3 rows one at 0.50 metres from bottom and balance two rows at 0.70 metres intervals leaving top gap of 0.10 m to 0.15 m and using vertical pipes at a spacing of 2.40 mts to 2.70 mts using special type gripper clamps ("Nandu" clamps) for keeping the both horizontal and vertical intact and joining pins for horizontals. The barrication shall be strongly fixed without any shaking including providing inclined struts wherever necessary including labour charges for all the operations such as loading unloading erection, removal etc., including conveyance charges to site (both ways ) and removing the same after completion of the festival and taking away the material etc., duly refilling the pits and levelling the surface etc., complete as directed during the execution. All the clamps shall be covered with rubber sheet for safety, so as to avoid exposure of sharp edges.
for functions of 1 day
for functions of 3 day
for functions of 10 days
for functions of 12 days
for functions of 30 days
Hire charges for supply of steel dining tables of size 1’6” x 6’0” including loading and unloading. *The rate is including maintenance, watch and ward, against theft and fire accidents, repairs and replacement etc., complete during the said period. Rate is including all taxes, Transportation etc.,complete *The relevant conditions of the foot note mentioned at the end of these items/chapter applies.
Hire charges for erection and removal of side curtains with white / colour design cloth and required frame work including using necessary bolts, nuts, etc., complete. The rate is including conveyance of all materials and labour charges for fixing and removal etc., complete .The Side curtains should be neat and with good appearance in all days , if spoiled in any manner and the same should be replaced immediately. The rate is for below mentioned calendar days .The rate is for below mentioned calendar days. The relevant conditions of the foot note mentioned at the end of these items/chapter applies.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
NIT 83.doc
TENDER_DOCUMENT • 0.70 MB
BOQ-83.xlsx
TENDER_DOCUMENT • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .